Quality Control Program Sample Clauses

Quality Control Program. The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:
AutoNDA by SimpleDocs
Quality Control Program. The Engineer shall have a quality control program in place that ensures that all deliverable work is of high quality. The quality control program shall include a Quality Assurance (QA) plan to monitor the quality control process. The Engineer shall submit a plan detailing its program to the Inspection Branch of the State Bridge Division for review and approval prior to beginning work. The State may review or audit the programs.
Quality Control Program. Engineer shall have a quality control program in place that ensures that all deliverable work is of high quality. Engineer shall submit a plan detailing its program to the Inspection Branch of the TxDOT Bridge Division for review and approval prior to beginning work. State may review or audit the programs.
Quality Control Program. (l) Claims and Litigation filed against the Apparent Low Bidder or filed by the Apparent Low Bidder for equitable adjustment, contract claim or litigation in the past five years.
Quality Control Program. Supplier will have in place an effective quality control program that complies, at a minimum, with standards common in the industry, to ensure that all aspects of the Services are completed in compliance with the Contract Documents. Supplier is solely responsible for quality control. Supplier will submit its quality control program manual to CenturyLink for review or information, if requested.
Quality Control Program. Contractor shall conduct a continuous program of quality control for all the Work to ensure and verify that the quality of the Work meets the requirements of this Contract. Contractor's quality control program and inspection procedures for the foregoing shall be submitted in writing to Owner or Owner’s Representative for review and approval, in sufficient detail to delineate those items to be inspected and the manner in which they are to be inspected, and shall adequately describe all quality control activities contemplated, including provisions for adequate documentation of Contractor's performance of such quality control and inspection.
Quality Control Program. The Seller maintains an internal quality control program designed to verify, on a regular basis, the existence and accuracy of the legal documents, credit documents and property appraisals relating to the Mortgage Loans that complies in all respects with Applicable Requirements. The program is designed to evaluate and monitor the overall quality of the loan origination and servicing activities of the Seller, the compliance of the Mortgage Loans with Applicable Requirements, and, as applicable, Originators and Prior Servicers. The program also is designed to detect and prevent dishonest, fraudulent or negligent acts, errors and omissions by officers, employees or other unauthorized persons.
AutoNDA by SimpleDocs
Quality Control Program. CM/GC shall prepare a written Quality Control Program to ensure that the Work matches the level of quality specified in the Contract Documents. The Quality Control Program shall describe in detail the steps CM/GC will take to ensure quality and will include, without limitation, those personnel, in addition to the Project Manager and Superintendent, who will provide review and verification of the proper installation of the Work. Each Subcontractor having responsibility for more than one hundred thousand dollars ($100,000.00) of the Work shall be addressed in the plan. CM/GC Site Plan and Land Disturbance Permit. CM/GC is required to obtain the land disturbance permits applicable to Owner that implement the National Pollution Discharge Elimination System (NPDES) requirements for stormwater management for construction activities from the appropriate issuing authority.
Quality Control Program. (QCP). The Contractor shall develop and maintain an effective quality control program to ensure services are performed IAW this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non- recurrence of defective services. The Contractor's QCP is the means by which it assures that its work complies with the requirements of the contract. The Contractor shall develop quality control procedures that address the areas identified in Appendix A, Performance Requirements Summary (PRS).
Quality Control Program. The Seller/Servicer shall have an internal quality control program capable of evaluating and monitoring the overall quality of its loan production and servicing activities, to ensure that the Mortgage Loans are originated and serviced in accordance with its policies and procedures.
Time is Money Join Law Insider Premium to draft better contracts faster.