Installation Activities Sample Clauses

Installation Activities. A digital camera will primarily be used to document the post-retrofit conditions. An infrared camera will be used to capture the thermo graphic image of post retrofit thermal leaks. Linear footage of weatherization will be measured using a measuring tape. Visual inspections of a sample set for the remainder of the M&V Services Period. Formulas and values in the DEA will be used to calculate the savings EEM 5: Unit Ventilator Replacement M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this unit ventilator replacement project. Verification Period & Frequency: One-time the first post-retrofit year. Pre-Installation Activities: A digital camera will primarily be used to document the pre-retrofit conditions. The existing condition of the unit ventilators will be documented with pictures prior to removal. Post- Verification Procedure: A digital camera will be used to document the post- retrofit conditions on a sample of units. Inspect and verify the unit ventilator replacements to see if they meet the specifications of the DEA in terms of quantity. Formulas and assumptions in the DEA will be used to calculate the savings ECM 6 –RTU Replacement M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to RTU replacement project. Verification Period & Frequency: One-time the first post-retrofit year. Pre-Installation Activities: A digital camera will primarily be used to document the pre-retrofit conditions. The existing condition of the RTU will be documented with pictures prior to removal. Post- Verification Procedure: A digital camera will be used to document the post- retrofit conditions. Inspect and verify the RTU installation to see if they meet the specifications of the DEA in terms of quantity, quality and rating. Formulas and assumptions in the DEA will be used to calculate the savings ECM 7 – Energy Efficient Motors Replacements M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this motor replacement project. Verification Period & Frequency: One-time the first post-retrofit year. Pre-Installation Activities: A digital camera will primarily...
AutoNDA by SimpleDocs
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the air conditioning compressor controller installation to see if they meet the specifications of the DEA in terms of quantity. An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Formulas and assumptions in the DEA will be used to calculate the savings NEMVP Option B Potential to Perform Verification and Continuous Performance Measurement Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the Agreement needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the Agreement. Performance verification techniques involve engineering calculations with metering and monitoring. Option B: • Confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings • Determines an energy (and cost) savings value using measured data taken as needed throughout the M&V term. Methods employed in this option will involve the use of short or long-term measurement of one or more variables. Reference: NEMVP Version 1.0 ECM # Energy Conservation Measure M&V Option 4.1 Energy Management System - Temperature Setback / Optimal Start B 4.2 Energy Management System - Demand Controlled Ventilation B 4.3 Energy Management System - Exhaust Fan Control & Kitchen Hood Controls B 8 Heating System - Boiler Replacement B ECM: 4.1: Energy Management System - Temperature Setback/Optimal Start M&V Option: NEMVP-B (Continuous) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the space temperatures and unit statuses affected by the energy project. Measured Parameter: Continuous measurement of a sample set of space temperatures, space temperature set points, outdoor air temperature, and unit statuses. Interaction: Demand Control Ventilation (DCV) Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Measurement and Verification Details: Post-Installation Activities: Energy Management system will continuously monitor post-retrofit outdoor air temperature, space temperature, and unit status. The date-time stamp will be included to differe...
Installation Activities. Subject to the timely receipt of NuPathe’s payments as set forth in the payment schedule attached hereto as Annex 4 (the “Payment Schedule”), LTS AG shall use its Commercially Reasonable Efforts to perform the Installation Activities and to perform those in accordance with the Project Plan.
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the air conditioning compressor controller installation to see if they meet the specifications of the DEA in terms of quantity, quality and rating. Verify if they perform in accordance with the functional specifications in the contract and meeting all functional tests. An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Formulas and assumptions in the DEA will be used to calculate the savings ECM 16 - Transformers – Replacements M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to the transformer replacements project. Interaction: All Electric ECMs. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Pre-Installation Activities: Measure kW of a sample set of transformers that will be replaced. Post-Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify the transformer installation to see if they meet the specifications of the DEA in terms of quantity, quality and rating. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. Measure the Post kW of the same sample set of transformers from the pre measures. Measurement will be before and after the transformer is installed. An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Formulas and assumptions in the DEA will be used to calculate the savings ECM 17: Refrigeration Compressor Controllers M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to the refrigeration compressor controller project. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Pre-Installation Activities: Document with the digital camera that the compressor controllers are not installed.
Installation Activities. Installation activities include the installation and configuration of the Software on the Customer's or Customer's designee or IT Service Provider's server and installation of one or two client workstations. Unless specified otherwise, Customer or Customer's designee or IT Service Provider will be responsible for loading the Software onto all other client workstations. 3.4.3
Installation Activities a. EVGO shall, at its sole cost and expense, be responsible for all installation activities (the “Installation Activities”) required to support the operation of the Charging Station and services therewith, including furnishing and installing all materials, equipment, and labor required for the installation of the Charging Station. This includes but is not limited to all work related to the development of plans and documents for supplying power to the Charging Station per PG&E standards and CITY requirements; the hiring and coordination of all vendors and contractors; the installation of electrical equipment, utility lines, hardware, and software; and site preparation, trenching, repaving, and landscaping. Following the installation, EVGO shall activate and test the Charging Station. EVGO knows of prevailing wage requirements under the laws of the State of California and shall pay prevailing wages for all Installation Activities in accordance with those laws.
Installation Activities. EV Charging Service Provider shall, at its sole cost and expense, be responsible for all installation activities (hereafter “Installation Activities”) required to support the operation of the L2 Chargers and services therewith, including the hiring and coordination of all vendors and contractors; the installation of electrical equipment, utility lines, hardware, and software; site preparation, trenching, repaving, and landscaping.
AutoNDA by SimpleDocs
Installation Activities i. eVgo shall designate the contractors or other service providers for the installation activities described in ARTICLE 1 and shall be solely responsible for supervising the completion of the Electric Service Infrastructure, the Make-Ready Stubs, the installations of the Charging Stations and installations of any signage approved by Host.
Installation Activities. In connection with the installation of any improvements on the Surface Premises, upon Legends’s request, CAR shall provide to Legends all documents evidencing CAR’s compliance with an NPDES and/or State Disposal System Stormwater Permit for Construction Activity requirements, including the Stormwater Pollution Prevention Plan (SWPPP) and associated maintenance records at a pre-installation meeting and during the course of installation.
Installation Activities. A digital camera will primarily be used to document the pre-retrofit conditions. An infrared camera will be used to capture the thermo graphic image of pre-retrofit leaking or failed traps.