Issue Certificate of Occupancy Sample Clauses

Issue Certificate of Occupancy. The building department may issue a Certificate of Occupancy after all special inspection reports and the final report have been submitted and accepted.
AutoNDA by SimpleDocs
Issue Certificate of Occupancy. The Building Division may issue a Certificate of Occupancy after all special inspection reports and the final report have been submitted and accepted. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement Owner’s name: Owner’s signature Date: Contractor’s name: Contractor’s Signature Date: Special Inspector or Inspection Agency’s name: Special Inspector’s signature: Date: Project Engineer/Architect’ name: Project Engineer/Architect’s signature: Date: ACCEPTED FOR THE BUILDING DIVISION‌ Print Name: Accepted and signed by: Date: CITY OF BURLINGAME INSPECTION AND TESTING SCHEDULE TESTING/INSPECTION AGENCY or SPECIAL INSPECTOR: Concrete Gunite Grout Mortar Aggregate Tests Reinforcing Tests Mix Designs Reinforcing Placement Batch Plant inspection Inspect Placing Cast Samples Pick-up Samples Compression Tests REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEEL WELDING Sample and Test (list specific members below) Shop Material Identification Welding Inspection 🞏Shop 🞏Field Ultrasonic inspection 🞏Shop 🞏Field High-strength Bolting Inspection‌ 🞏Shop 🞏Field A325 A490 N X F Metal Deck Welding Inspection Concrete insert Welding Inspection INSTALLATION OF EPOXY EMB.ANCHORS Placement Inspection Density Tests Thickness Tests Inspect Batching FIREPROOFING: Piles Post-Tens Pre-Tens Cladding Aggregate Tests Reinforcing Tests Tendon Tests Mix Designs Reinforcing Placement Insert Placement Concrete Batching Concrete Placement Installation Inspection CAST INPLACE/PRECAST/PRESTRESSED CONCRETE INSULATING CONCRETE: Sample and Test Placement Inspection Unit Weights Observation of subgrade preparation and inspection Of foundation by the geotechnical engineer Placement inspection Field Density FILL MATERIAL: Special Inspection Stresses used Preliminary Acceptance Tests (Masonry Units, Wall Prisms) Subsequent Tests (Mortar, Grout, Field Wall Prisms) Placement Inspection of Units MASONRY: Shear Wall Nailing Inspection Inspection of Glu-xxx Fab. Inspection of Tress Joist Fab Sample and Test Components STRUCTURAL WOOD:
Issue Certificate of Occupancy. The building division will issue a Certificate of Occupancy when all other city requirements have been met and after all special inspection reports and the final report have been submitted and accepted.
Issue Certificate of Occupancy. The Building Division may issue a Certificate of Occupancy after all special inspection reports and the final report have been submitted and accepted. __________________________ SPECIAL INSPECTION AND TESTING SCHEDULE San Bruno, Community Development Department Building Division 000 Xx Xxxxxx Xxxx Xxx Xxxxx, XX 00000 (650) 616-7076 JOB ADDRESS PERMIT #: LOT(S) BLK SUB'D APN Owner............................................................................................................ Contractor ..................................................................................................... Addr/City/St ................................................................................................... Addr/City/St ...................................................................................................
Issue Certificate of Occupancy. The building department may issue a Certificate of Occupancy after all special inspection reports and the final report have been submitted and accepted. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. 8/12/2020 Owner: Hibiscus Properties LLC By: Date: Xxxxxxx Xxxxxxxxx xxxxxxxxxx@xx.xxx 8/12/2020 Contractor: Xxxxx 00 Construction By: Date: Xxxxxx Xxxxxxx xxxxxxxx@xxxxx00xx.xxx Special Inspector 8/12/2020 Or Inspection Agency: Alta Vista By: Date: Xxxxxxx Xxxxx – xxxxxx@xxxxxxxxxxxxxxxxxx.xxx 8/12/2020 Project Engineer/Architect: BKF By: Date: Xxxxxxxx Xxxxxxxx xxxxxxxxx@xxx.xxx BUILDING DEPARTMENT ACCEPTANCE: 8/13/2020 By: Date: The following inspection and tests, as indicated below, will be required as detailed in applicable project plans, specifications and the California Building Code. These inspections are in addition to inspections performed by the City of Menlo Park Building Inspection Department. Individuals performing these duties must be qualified, and approved by the Building Department prior to performing inspections. Individuals certified in a special inspection category by a qualified independent third party organization, and individuals employed by a recognized testing laboratory and under the direct supervision of a Civil Engineer are considered qualified and approved. Special Inspection Reports shall be submitted to the Building Inspection Department, engineer or architect of record and other designated individuals. Reporting methods shall be described in plans, specifications, and the Building Code. A final inspection report will be required prior to the Certificate of Occupancy. SCHEDULE OF SPECIAL INSPECTION COLUMN HEADER: C = Indicates continuous inspection required P = Indicates periodic inspections are required. The notes and or contract documents should clearly clarify I = Required inspection to be performed under this permit per the registered design professional BOX ENTRIES: X = is placed in the appropriate column to denote either “C” continuous or “P” periodic inspections R = Review and approve document G = In accordance with the Geotechnical report or document approved by the Building Official Additional details regarding inspections and tests are provided in the project specifications or notes on the drawings. Items marked as continuous inspection may be approved for periodic inspection upon documentation submittal from a nationally recognized laboratory or ICC report that allows...
Issue Certificate of Occupancy. The Building Division may issue a Certificate of Occupancy after all special inspection reports and the final report have been submitted and accepted. __________________________ SPECIAL INSPECTION AND TESTING SCHEDULE San Bruno, Community Development Department Building Division 000 Xx Xxxxxx Xxxx Xxx Xxxxx, XX 00000 (650) 616-7076 JOB ADDRESS PERMIT #: LOT(S) BLK SUB'D APN
Issue Certificate of Occupancy. The City may issue a Certificate of Occupancy after all special inspection reports and the final report have been submitted and accepted. Building Division Responsibilities ACKNOWLEDGMENT I have read and agree to comply with the terms and conditions of this agreement. Owner Signature: Date: Printed Name: XXXX XXXXX Contractor Signature: Date: Printed Name: HARLEY WANAKA Engineer/Architect Signature: Date: 2-17-2020
AutoNDA by SimpleDocs
Issue Certificate of Occupancy. The building division shall issue a Certificate of Occupancy after all special inspection reports and the final report have been submitted and the building final inspection is accepted. SPECIAL INSPECTION The following are extracts from Chapter 17, Section 1704, Special Inspections, as it appears in the 2016 Edition of the California Building Code.
Issue Certificate of Occupancy. The Building Department may issue a Certificate of Occupancy after all special inspection reports and the final report have been submitted and accepted. Note: If all special inspection reports are not approved, the Building Department may withhold the Certificate of Occupancy until all discrepancies are resolved. STATEMENT OF SPECIAL INSPECTION AND TESTING AGREEMENT FORM Date: Project Title: Permit No.: Project Address: This statement of Special Inspections is submitted in fulfillment of the requirements of the 2019 CBC Sections 1704 and 1705. Special Inspections and Testing will be performed in accordance with the approved plans and specifications, this statement and the 2019 CBC, sections 1704, 1707 and 1708. The attached Schedule of Special Inspections summarizes the Special Inspections and Tests required. Special Inspectors will refer to the approved plans and specifications for detailed special inspection requirements. Any additional tests and inspections required by the approved plans and specifications will also be performed. BEFORE A PERMIT CAN BE ISSUED: The owner or his representative, on the advice of the registered design professional in responsible charge, shall complete, sign by all parties, and submit two (2) copies of this package to this Division for review and approval.
Issue Certificate of Occupancy. The building department will issue a Certificate of Occupancy when all other City requirements have been met and after all special inspection reports and the final report have been submitted and accepted. Discrepancy Notices: A discrepancy notice is given by the building inspector to the special inspector when the special inspector approves items not in conformance with the approved plan, specification, or provisions of the building code. A special inspector who received two (2) discrepancy notices by the building department shall be immediately replaced with another approved special inspector. If two more discrepancies are identified by the City inspector, the agency that employs these inspectors will be removed from the project and replaced with another agency specified by the owner and approved by the building official. Areas of Special Inspection: Please have the engineer of record check what special inspections will be required for this project. Special Inspection of Fabricated Items - IBC 1705.1