Interconnection Study Requirements Sample Clauses

Interconnection Study Requirements. Interconnection Customer must meet all of the Transmission Owner’s requirements as identified in the Interconnection Study. The GE Wind Turbines equipped with the manufacturer’s dynamic var control option will meet the Power Factor Design Criteria specified in Appendix G of this GIA. The Power Factor range of 0.95 Leading to 0.95 Lagging as measured at the point of interconnection will meet the reactive power requirements specified in the Interconnection Study. The wind generation interconnection facility shall be set to regulate the 230kV bus voltage at the point of interconnection in the Transmission Owner’s substation.
AutoNDA by SimpleDocs
Interconnection Study Requirements. Interconnection Customer must meet all of the Transmission Owner’s requirements as identified in the Interconnection Study. The GE Wind Turbines equipped with the manufacturer’s dynamic var control option will meet the Power Factor Design Criteria specified in Appendix G of this GIA. The Power Factor range of 0.95 Leading to 0.95 Lagging as measured at the point of interconnection will meet the reactive power requirements specified in the Interconnection Study. The wind generation interconnection facility shall be set to regulate the 115 kV bus voltage at the Point Of Interconnection. Appendix D to GIA Security Arrangements Details Infrastructure security of Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day Transmission System reliability and operational security. FERC will expect all Transmission Providers, market participants, and Interconnection Customers interconnected to the Transmission System to comply with the recommendations offered by the President's Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. Appendix E to GIA Commercial Operation Date , 2010 Xxxx Xxxxxx, Executive Vice President& Chief Operating Officer Southwest Power Pool, Inc. 000 X. XxXxxxxx, # 140 Plaza West Little Rock, AR. 72205-3020 Xxxx Xxxxxx, Transmission Compliance & Planning Manager Nebraska Public Power District 000 Xxxx 00xx Xx. Xxxx, XX 00000-0000 Re: Broken Bow Generating Facility (GEN-2006-038N005) Dear : On , 2010 has completed Trial Operation of the Generating Facility that is the subject of the GIA executed by Nebraska Power Public District, and Southwest Power Pool. This letter confirms that commenced Commercial Operation of the Generating Facility, effective as of [Date above plus one day]. Thank you. [interconnection customer] Notices: Appendix F to GIA ADDRESSES FOR DELIVERY OF NOTICES AND XXXXXXXX Transmission Provider: Xxxx Xxxxxx, Executive Vice President& Chief Operating Officer Southwest Power Pool, Inc 000 X. XxXxxxxx, # 000 Xxxxx Xxxx Xxxxxx Xxxx, XX. 00000-0000 Transmission Owner: Xxxx Xxxxxx, Transmission Compliance & Planning Manager Nebraska Public Power District 000 Xxxx 00xx Xx. Xxxx, XX 00000-0000 xxxxxxx@xxxx.xxx Interconnection Custome...
Interconnection Study Requirements. Interconnection Customer must meet all of the Transmission Owner’s requirements as identified in the Interconnection Study.

Related to Interconnection Study Requirements

  • Technical and Interconnection Requirements 2.1 Consumer agrees that his Rooftop Solar PV System and Net Metering System will conform to the standards and requirements specified in the Policy, Regulations and Supply Code as amended from time to time.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.