Technical Standards Applicable to a Wind Generating Plant Sample Clauses

Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.
AutoNDA by SimpleDocs
Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard. Transition Period LVRT Standard The transition period standard applies to wind generating plants subject to FERC Order 661 that have either: (i) interconnection agreements signed and filed with the Commission, filed with the Commission in unexecuted form, finally executed as conforming agreements, or filed with the Commission as non-conforming agreements between January 1, 2006 and December 31, 2006, with a scheduled in-service date no later than December 31, 2007, or (ii) wind generating turbines subject to a wind turbine procurement contract executed prior to December 31, 2005, for delivery through 2007.
Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard. Transition Period LVRT Standard The transition period standard applies to wind generating plants subject to FERC Order 661 that have either: (i) interconnection agreements signed and filed with the Commission, filed with the Commission in unexecuted form, finally executed as conforming agreements, or filed with the Commission as non-conforming agreements between January 1, 2006 and December 31, 2006, with a scheduled in-service date no later than December 31, 2007, or (ii) wind generating turbines subject to a wind turbine procurement contract executed prior to December 31, 2005, for delivery through 2007. Wind generating plants are required to remain in-service during three-phase faults with normal clearing (which is a time period of approximately 4 - 9 cycles) and single line to ground faults with delayed clearing, and subsequent post-fault voltage recovery to prefault voltage unless clearing the fault effectively disconnects the generator from the system. The clearing time requirement for a three-phase fault will be specific to the wind generating plant substation location, as determined by and documented by the Transmission Owner for the Transmission District to which the wind generating plant will be interconnected. The maximum clearing time the wind generating plant shall be required to withstand for a three-phase fault shall be 9 cycles at a voltage as low as 0.15 p.u., as measured at the high side of the wind generating plant step-up transformer (i.e. the transformer that steps the voltage up to the transmission interconnection voltage or "GSU"), after which, if the fault remains following the location-specific normal clearing time for three-phase faults, the wind generating plant may disconnect from the transmission system. This requirement does not apply to faults that would occur between the wind generator terminals and the high side of the GSU or to faults that would result in a voltage lower than 0.15 per unit on the high side of the GSU serving the facility. Wind generating plants may be tripped after the fault period if this action is intended as part of a special protection system. Wind generating plants may meet the LVRT requiremen...
Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT)
Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the applicable NERC or WECC Standard. QUALIFYING FACILITY POWER PURCHASE AGREEMENT BETWEEN NORTHWESTERN CORPORATION D/B/A NORTHWESTERN ENERGY AND NEW COLONY WIND, LLC DATED EFFECTIVE AS OF May [23], 2017 TABLE OF CONTENTS [REVISE UPON EXECUTION] PREAMBLE 1 RECITALS: 1 ARTICLE 1: DEFINITIONS 1 ARTICLE 2: RULES OF INTERPRETATION 9 ARTICLE 3: SELLER’S REPRESENTATIONS AND WARRANTIES 9 ARTICLE 4: CONDITIONS PRECEDENT 11 ARTICLE 5: PURCHASE AND SALE OF ENERGY, CAPICITY AND ENVIRONMENTAL ATTRIBUTES 12 ARTICLE 6: OPERATIONS 16 ARTICLE 7: SECURITY & DAMAGES 20 ARTICLE 8: EVENTS OF DEFAULT AND TERMINATION 211 ARTICLE 9: INDEMNIFICATION AND LIABILITY 22 ARTICLE 10: INSURANCE 25 ARTICLE 11: NOTICES 26 ARTICLE 12: ASSIGNMENT AND OWNERSHIP 27 ARTICLE 13: TAXES 28 ARTICLE 14: FORCE MAJEURE 30 ARTICLE 15: CONFIDENTIALITY 31 ARTICLE 16: GENERAL PROVISIONS 32 ARTICLE 17: REGULATION BY THE MONTANA PUBLIC SERVICE COMMISSION 34 ARTICLE 18: LOCAL HIRING AND WAGE STANDARDS 35
Technical Standards Applicable to a Wind Generating Plant. 4. Wind gei.nLeroawtinVgoplltaangtes Rmiadye-mTehertothueghLV(LRVTRrTeq)uCiraepmaebnitlsitoyf this standard by the performance of the generators or by installing additional equipment (e.g. Static VAR Cowmipnedngseantoerr,aetitncg.) pwlaitnhtinshtahlel bweinadblgeetnoeramtinaginpolannlitnoer dbuyriancgovmobltiangaetidoinstoufrbgaennceersatuopr to the time perfiorms andceaassnodcaiadtdeidtivoonlatlageqeuliepvmelesnste. t forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.
Technical Standards Applicable to a Wind Generating Plant 
AutoNDA by SimpleDocs

Related to Technical Standards Applicable to a Wind Generating Plant

  • Technical Standards The Generation System shall be installed and operated by the Interconnection Customer consistent with the requirements of this Agreement; the Technical Requirements; the applicable requirements located in the National Electrical Code (NEC); the applicable standards published by the American National Standards Institute (ANSI) and the Institute of Electrical and Electronic Engineers (IEEE); and local building and other applicable ordinances in effect at the time of the installation of the Generation System.

  • Minimum Site Requirements for TIPS Sales (when applicable to TIPS Sale). Cleanup: When performing work on site at a TIPS Member’s property, Vendor shall clean up and remove all debris and rubbish resulting from their work as required or directed by the TIPS Member or as agreed by the parties. Upon completion of work, the premises shall be left in good repair and an orderly, neat, clean and unobstructed condition. Preparation: Vendor shall not begin a project for which a TIPS Member has not prepared the site, unless Vendor does the preparation work at no cost, or until TIPS Member includes the cost of site preparation in the TIPS Sale Site preparation includes, but is not limited to: moving furniture, installing wiring for networks or power, and similar pre‐installation requirements. Registered Sex Offender Restrictions: For work to be performed at schools, Vendor agrees that no employee of Vendor or a subcontractor who has been adjudicated to be a registered sex offender will perform work at any time when students are, or reasonably expected to be, present unless otherwise agreed by the TIPS Member. Vendor agrees that a violation of this condition shall be considered a material breach and may result in the cancellation of the TIPS Sale at the TIPS Member’s discretion. Vendor must identify any additional costs associated with compliance of this term. If no costs are specified, compliance with this term will be provided at no additional charge. Safety Measures: Vendor shall take all reasonable precautions for the safety of employees on the worksite, and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Vendor shall post warning signs against all hazards created by the operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage. Smoking: Persons working under Agreement shall adhere to the TIPS Member’s or local smoking statutes, codes, ordinances, and policies.

  • Technical Specifications 1. A procuring entity shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with the purpose or effect of creating an unnecessary obstacle to trade between the Parties.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order.

  • Changes to Specifications All Specifications and any changes thereto agreed to by the Parties from time to time shall be in writing, dated and signed by the Parties. No change in the Specifications shall be implemented by Cardinal Health, whether requested by Reliant or requested or required by any Regulatory Authority, until the Parties have agreed in writing to such change, the implementation date of such change, and any increase or decrease in costs, expenses or fees associated with such change. Cardinal Health shall respond promptly to any request made by Reliant for a change in the Specifications, and both Parties shall use commercially reasonable, good faith efforts to agree to the terms of such change in a timely manner. If after initial Product qualification, Reliant requests a change in the Specifications for its own benefit or to comply with the requirements of a Regulatory Authority, the Specifications shall be amended as soon as [***]: Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. possible after a request is made for any change in Specifications, and Cardinal Health shall notify Reliant of the costs associated with such change and shall provide such supporting documentation as Reliant may reasonably require. Reliant shall pay all costs associated with such Reliant-requested changes or changes required by a Regulatory Authority as may be agreed upon by the Parties. Changes, agreed to between the Parties, for the benefit of Cardinal Health, shall be at the expense of Cardinal Health. If there is a conflict between the terms of this Agreement and the terms of the Specifications, this Agreement shall control.

  • Loop Testing/Trouble Reporting 2.1.6.1 TeleConex will be responsible for testing and isolating troubles on the Loops. TeleConex must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, TeleConex will be required to provide the results of the TeleConex test which indicate a problem on the BellSouth provided Loop.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

Time is Money Join Law Insider Premium to draft better contracts faster.