SSCC definition

SSCC means Shorter Schedule of Cost Components starting on page 63 of ECC3 (April 2013). A Priced contract with activity schedule Data for the Shorter Schedule of Cost Components 41 in SSCC The percentage for people overheads is: % 21 in SSCC The published list of Equipment is the last edition of the list published by Minus % The percentage for adjustment for Equipment in the published list is 22 in SSCC The rates of other Equipment are: Equipment Size or capacity Rate 61 in SSCC The hourly rates for Defined Cost of design outside the Working Areas are Category of employee Hourly rate Note: Hourly rates are estimated ‘cost to company of the employee’ and not selling rates. Please insert another schedule if foreign resources may also be used 62 in SSCC The percentage for design overheads is % 63 in SSCC The categories of design employees whose travelling expenses to and from the Working Areas are included in Defined Cost are:
SSCC means Smurfit-Stone Container Corporation, a Delaware corporation.
SSCC has the meaning assigned to such term in the preamble to this Agreement.

Examples of SSCC in a sentence

  • If engineered services are involved, the call will be made to the GTE SSCC for handling.

  • Notwithstanding any other provision of this Grant Agreement, no withdrawals shall be made from the Grant Account for any activities under Part B until SSCC is established, fully operational and has entered into a Project Agreement with ADB.

  • SSCC shall assume IA role after (i) ADB is satisfied that SSCC has the capacity and resources to carry out its duty as an IA, and (ii) a Project Agreement has been signed between ADB and the SSCC.

  • Within 3 months after the Effective Date, the Recipient and the EA shall have incorporated SSCC in accordance with the Recipient’s company laws and legislations.

  • Once established, the SSCC shall assume the role as IA for Part B of the Project.


More Definitions of SSCC

SSCC shall have the meaning provided in the preamble of this Agreement. Each reference herein to SSCC shall, on and after the Funding Date and the Funding Date Merger, be deemed a reference to Holdings as the corporation surviving the Funding Date Merger.
SSCC means Shorter Schedule of Cost Components starting on page 59 of ECC3. B Priced contract with xxxx of quantities Data for the Shorter Schedule of Cost Components 41 in SSCC The percentage for people overheads is: • Relevant People costs (such costs being those paid by the Contractor, including legally required and pension payments, for those people directly employed or paid by the Contractor according to the time worked and whose place of work is within the Working Areas) are determined by reference to the “Shorter Schedule of Cost Components”. The Tenderer then applies to those costs as a percentage for people overheads. • This has the same purpose as the percentage for Working Area overheads but is for use only when the Shorter Schedule of Cost Components is used. • The Shorter Schedule is used with Options A for the purposes of assessing compensation events. % 21 in SSCC The published list of Equipment is the last edition of the list published by The percentage for adjustment for Equipment in the published list is Minus % 22 in SSCC The rates of other Equipment are: Equipment Size or capacity Rate Note: For use with the Shorter Schedule of Cost Components 61 in SSCC The hourly rates for Defined Cost of design outside the Working Areas are Category of employee Hourly rate Note: Hourly rates are estimated ‘cost to company of the employee’ and not selling rates. Applicable costs only that are incurred outside the Working Areas Please insert another schedule if foreign resources may also be used For use with the e Shorter Schedule of Cost Components 62 in SSCC The percentage for design overheads is Note: a percentage to cover the overhead costs in relation to Design outside the Working Areas. Note: For use with the Shorter Schedule of Cost Components % 63 in SSCC The categories of design employees whose travelling expenses to and from the Working Areas are included in Defined Cost are: PART 2: PRICING DATA ECC3 Option B Document reference Title Page No. C2.1 Pricing assumptions: Option B 2 C2.2 The xxxx of quantities 2 C2.1 Pricing assumptions: Option B How work is priced and assessed for payment Clause 11 in NEC3 Engineering and Construction Contract, June 2005 (ECC3) Option B states:
SSCC means Shorter Schedule of Cost Components starting on page 59 of ECC3. A Priced contract with activity schedule Data for the Shorter Schedule of Cost Components C2 Pricing Data
SSCC means Shorter Schedule of Cost Components starting on page 63 of ECC3 (April 2013). A Priced contract with activity schedule Data for the Shorter Schedule of Cost Components B Priced contract with xxxx of quantities Data for the Shorter Schedule of Cost Components 41 in SSCC The percentage for people overheads is: % 21 in SSCC The published list of Equipment is the last edition of the list published by Minus % The percentage for adjustment for Equipment in the published list is 22 in SSCC The rates of other Equipment are: Equipment Size or capacity Rate 61 in SSCC The hourly rates for Defined Cost of design outside the Working Areas are Category of employee Hourly rate Note: Hourly rates are estimated ‘cost to company of the employee’ and not selling rates. Please insert another schedule if foreign resources may also be used 62 in SSCC The percentage for design overheads is % 63 in SSCC The categories of design employees whose travelling expenses to and from the Working Areas are included in Defined Cost are: If Option C, D or E is used Data for Schedule of Cost Components 23 in SCC The listed items of Equipment purchased for work on this contract, with an on cost charge, are: Equipment Time related charge Per (time period) 24 in SCC The rates of special Equipment are: Equipment Size or capacity Rate 44 in SCC The percentage for Working Areas overheads is: : %
SSCC means Smurfit-Stone Container Corporation (formerly named Jefferson Smurfit Corporation), a Delaware corporation.
SSCC means Shorter Schedule of Cost Components starting on page 59 of ECC3. B Priced contract with xxxx of quantities Data for the Shorter Schedule of Cost Components 41 in SSCC The percentage for people overheads is: % 21 in SSCC The published list of Equipment is the last edition of the list published by The percentage for adjustment for Equipment in the published list is Minus % 22 in SSCC The rates of other Equipment are: Equipment Size or capacity Rate 61 in SSCC The hourly rates for Defined Cost of design outside the Working Areas are Category of employee Hourly rate Note: Hourly rates are estimated ‘cost to company of the employee’ and not selling rates. Please insert another schedule if foreign resources may also be used 62 in SSCC The percentage for design overheads is % 63 in SSCC The categories of design employees whose travelling expenses to and from the Working Areas are included in Defined Cost are: C1.3 Forms of Securities Pro forma Parent Company Guarantee (for use with Option X4) (to be reproduced exactly as shown below on the letterhead of the Contractor’s Parent Company) Eskom Holdings SOC Limited Megawatt Park Xxxxxxx Drive Sandton Johannesburg Date: Dear Sirs, Parent Company Guarantee for Enquiry Number: With reference to the above numbered contract made or to be made between Eskom Holdings SOC Limited (the Employer) and {Insert registered name and address of the Contractor} (the Contractor), for {Insert details of the works from the Contract Data} (the works). I/We the undersigned on behalf of the Contractor’s parent company of physical address and duly authorised thereto do hereby unconditionally guarantee to the Employer that the Contractor shall Provide the Works in accordance with the above numbered Contract.
SSCC means Shorter Schedule of Cost Components starting on page 59 of ECC3. B Priced contract with xxxx of quantities Data for the Shorter Schedule of Cost Components 11 in SSCC The hourly rates for people working for the Contractor within the Working Areas are: Category of employee Hourly rate 41 in SSCC The percentage for people overheads is: % 22 in SSCC The rates of Equipment are: Equipment Size or Rate capacity PART 2: PRICING DATA Document reference Title No of pages C2.1 Pricing assumptions: Option B 04 C2.2 The xxxx of quantities 11 C2.1 Pricing assumptions: Option B