TRENCH EXCAVATION AND BACKFILL Sample Clauses

TRENCH EXCAVATION AND BACKFILL. A. General: Refer to Section 210, Trenching and Backfill.
AutoNDA by SimpleDocs
TRENCH EXCAVATION AND BACKFILL. A. This work shall be incidental to the contract unit price per linear foot of pipe/utility, complete in place, where applicable.
TRENCH EXCAVATION AND BACKFILL. Subsection 701.17.1.A Trenching and Backfilling Replace final sentence of first paragraph with the following: Payment for trenching and backfilling according to specifications for all items other than sanitary sewer is included in the unit prices bid for each item and no separate payment will be made. SECTION 910 STORM SEWER PIPE INSTALLATIONS Storm sewer pipe shall be ADS N-12 corrugated, smooth interior, high-density polyethylene pipe (HDPE) that meets the requirements of Section 570 of the NMDOT Standard Specifications for Roadway and Bridge Construction. SECTION 1504
TRENCH EXCAVATION AND BACKFILL. Replace the second paragraph of this subsection with the following: Place 6" wide detectable magnetic tape labeled “Caution – Buried Electrical Cable Below” or “Caution - Buried Communication Cable Below,” as appropriate. Place tape approximately 12" from the top of the trench, for the entire trench length. Add the following: Excavate extra depth trench as required to provide 5- foot minimum cover for conduit at guide rail crossings, and to transition directional bored conduit from the bore path into a standard depth trench leading to junction boxes. Buried conduit and cable markers: Shall meet the requirements of Section 910 of Publication 408, revised April 1, 2006. Section 910.3 (t) Construction - add the following: Cast label “C” into top of markers for communication cables. Cast label “E” into top of markers for electrical cables. MEASUREMENT AND PAYMENT - Linear Foot 00 - c00800 ITEM 9000-0001 - CONTROLLER ASSEMBLY ‌ Addendum: Associated Item(s): 9000-0001 Header: ITEM 9000-0001 - CONTROLLER ASSEMBLY Provision Body: DESCRIPTION - This work is the furnishing and installation of an Econolite ASC/3 Traffic Signal Controller Assembly. MATERIAL - Section 950.2, 952.2, 1104.03 except as follows: Provide a controller assembly meeting NEMA TS1, as supplemented and amended. Provide the following minimum cabinet sizes as required: Type I Mounting: Cabinet size 6 (44"W x 52"H x 24"D) with 18” riser Type I Mounting, local with on-street master: Cabinet size 7 (44"W x 72"H x 24"D) Type II Mounting: Cabinet size 5 (30"W x 48"H x 16"D) Provide a twelve position back panel (minimum). Provide a 20-watt, 12VDC, 24-inch covered fluorescent tube light in the top of the cabinet to be automatically illuminated only while the cabinet door is open. Provide a sliding aluminum "laptop shelf" with piano hinged lid capable of holding the cabinet manuals and intersection condition diagram. Provide and connect a spring-loaded door switch and in upper right corner of cabinet opening for use as a "door open" alarm. Provide any modules needed to operate the Transit Signal Priority system. Maintain existing electrical service to controller assemblies unless otherwise noted on contract drawings. At locations where an existing pushbutton and/ or sign is mounted to the existing controller assembly, remove and remount in a similar location on the new controller assembly. Provide an assembly that will allow an operator to manually transfer between Utility and local fed electrical power in...

Related to TRENCH EXCAVATION AND BACKFILL

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Vaccination and Inoculation (a) The Employer agrees to take all reasonable precautions, including in-service seminars, to limit the spread of infectious diseases among employees.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Porcupine Site Highway 11

  • COMMUTE TRIP REDUCTION AND PARKING 24.1 The Employer will continue to encourage but not require employees to use alternate means of transportation to commute to and from work consistent with the Commute Trip Reduction (CTR) law and the needs of the Employer and the community.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.