Milestones Applicable Solely for CNR Interconnection Service. In addition to the Milestones above, the following Milestones apply to Interconnection Customers requesting CNR Interconnection Service: Item # Milestone Responsible Party Date SGIP/SGIA Reference 1 Submit necessary requests for participation in the Forward Capacity Auction associated with the Generating Facility’s requested Commercial Operation Date, in accordance with Section III.13 of the Tariff Interconnection Customer Complete 1.7.1.3(i) 2 Participate in a CNR Group Study InterconnectionCustomer; System Operator To be completed 1.7.1.3(ii) 3 Qualify and receive a Capacity Supply Obligation in accordance with Section III.13 of the Tariff * Interconnection Customer To be completed 1.7.1.3(iii) 4 Complete a re-study of the applicable Interconnection Study to determine the cost responsibility for facilities and upgrades necessary to accommodate the Interconnection Request based on the results of the Forward Capacity Auction, Reconfiguration Auction or bilateral transaction through which the System Operator To be completed 1.7.1.3(iv) Interconnection Customer received aCapacity Supply Obligation * Interconnection Customer has until the twelth Forwad Capacity Auction (FCA 12) to qualify and receive a Capacity Supply Obligation under the Interconnection Request associated with Queue Position No. 545. Attachment 5 Additional Operating Requirements for the New England Transmission System and Affected Systems Needed to Support the Interconnection Customer's Needs I. OPERATING REQUIREMENTS Not applicable – the Interconnection Customer and Interconnecting Transmission Owner are the same. Attachment 6 Interconnecting Transmission Owner’s Description of its Upgrades and Best Estimate of Upgrade Costs I. DESCRIPTION OF UPGRADES A. Distribution Upgrades None B. Network Upgrades
AutoNDA by SimpleDocs
Milestones Applicable Solely for CNR Interconnection Service. In addition to the Milestones above, the following Milestones apply to Interconnection Customers requesting CNR Interconnection Service: Item # Milestone Responsible Party Date SGIP/TGIA Reference 1 Submit necessary requests for Interconnection N/A 1.7.1.3(i) participation in the Forward Capacity Auction associated with the Generating Facility’s requested Commercial Operation Date, in accordance with Section III.13 of the Tariff Customer 2 Participate in a CNR Group Study Interconnection Customer; System Operator N/A 1.7.1.3(ii) 3 Qualify and receive a Capacity Supply Obligation in accordance with Section III.13 of the Tariff Interconnection Customer N/A 1.7.1.3(iii) 4 Complete a re-study of the applicable Interconnection Study to determine the cost responsibility for facilities and upgrades necessary to accommodate the Interconnection Request based on the results of the Forward Capacity Auction, Reconfiguration Auction or bilateral transaction through which the Interconnection Customer received a Capacity Supply Obligation System Operator N/A 1.7.1.3(iv) Agreed to by: For the Interconnecting Transmission Owner: N/A Date: For the Interconnection Customer: N/A Date: Attachment 5 Additional Operating Requirements for the New England Transmission System and Affected Systems Needed to Support the Interconnection Customer's Needs The Interconnecting Transmission Owner shall also provide requirements that must be met by the Interconnection Customer prior to initiating parallel operation with the New England Transmission System.
Milestones Applicable Solely for CNR Interconnection Service. In addition to the Milestones above, the following Milestones apply to Interconnection Customers requesting CNR Interconnection Service: Item # Milestone Responsible Party Date SGIP/SGIA Reference 1 Submit necessary requests for participation in the Forward Capacity Auction associated with the Generating Facility’s requested Commercial Operation Date, in accordance with Section III.13 of the Tariff Interconnection Customer Complete 1.7.1.3(i) 2 Participate in a CNR Group Study InterconnectionCustomer; System Operator Complete 1.7.1.3(ii) 3 Qualify and receive a Capacity Supply Obligation in accordance with Section III.13 of the Tariff Interconnection Customer Complete 1.7.1.3(iii) 4 Complete a re-study of the applicable Interconnection Study to determine the cost responsibility for facilities and upgrades necessary to accommodate the System Operator Complete 1.7.1.3(iv) Interconnection Request based on the results of the Forward Capacity Auction, Reconfiguration Auction or bilateral transaction through which the Interconnection Customer received a Capacity Supply Obligation *Interconnection Customer has until seventeenth Forward Capacity Auction (FCA17) to qualify and receive a Capacity Supply Obligation under the Interconnection Request associated with Queue Position No. 1010. Attachment 5 Additional Operating Requirements for the New England Transmission System and Affected Systems Needed to Support the Interconnection Customer's Needs

Related to Milestones Applicable Solely for CNR Interconnection Service

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Network Resource Interconnection Service (check if selected)

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

Time is Money Join Law Insider Premium to draft better contracts faster.