Lands for Work Sample Clauses

Lands for Work. The Contractor shall provide, at its own expense and without liability to the City, any additional land and access that may be required for temporary construction facilities or for storage of materials.
AutoNDA by SimpleDocs
Lands for Work. 29.1 The City shall provide, as indicated in the Contract Documents, the lands upon which the Project is to be performed, rights-of-way, and easements for access thereto, and such other lands as are designated for the use of the Contractor. No claim for damages or other claim other than for an extension of time shall be made or asserted against the City by reason of any delay arising as a result of any failure of the City to provide such lands on the date needed by the Contractor. The provisions of Article 36 hereof shall apply.
Lands for Work. 30.1. Village shall provide, as may be indicated in the Contract Documents, the lands upon which the Work is to be performed, rights-of-way and easements for access thereto and such other lands as are designated by Village or the use of Contractor.
Lands for Work. 1. The County shall provide, as may be indicated in the Project Documents, the lands upon which the Work is to be performed, rights-of-way and easements for access thereto and such other lands as are designated by the County for the use of CONTRACTOR.

Related to Lands for Work

  • Sites for Work Performance The Applicant shall list (on separate pages) the site(s) for the performance of work done in connection with the HUD funding of the program/activity shown above: Place of Performance shall include xxx xxxxxx xxxxxxx, xxxx, xxxxxx, Xxxxx, and zip code. Identify each sheet with the Applicant name and address and the program/activity receiving grant funding.) Check here 0if there are workplaces on file that are not identified on the attached sheets. I hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate. Warning: HUD will prosecute false claims and statements. Conviction may result in criminal and/or civil penalties. (18 U .S.C. 1001, 1010, 1012; 31 U.S.C. 3729, 3802) Name of Authorized Official Title Signature Date X form HUD-50070 (3/98) ref. Handbooks 7417.1 , 7475.13, 7485.1 & .3 CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION LOWER TIER COVERED TRANSACTIONS This certification is required by the regulations implementing Executive Order 12549, Debarment and suspension, 29 CFR Part 98.510, Participants’ responsibilities. The regulations were published as Part VII of the May 26, 1988 Federal Register (pages 19160-19211) (BEFORE COMPLETING CERTIFICATION, READ INSTRUCTIONS FOR CERTIFICATION)

  • Fitness for Work 6.2.1 The parties to this Agreement agree that the maintenance of a safe and healthy working environment will be enhanced by adopting a pro-active approach to addressing fitness for work issues, including the misuse of drugs and alcohol in the workplace, workplace stress and fatigue. The management of these occupational health and safety issues will assist to eliminate a contributing factor to workplace injuries and accidents.

  • Summer Work a. This section shall apply only to those employees hired to fill temporary summer positions.

  • REPORTING FOR WORK 11.01 An employee reporting for work at the scheduled starting time, unless notified the previous day not to report, and for whom no work is available, shall receive four

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

  • UNIT WORK When the Employer deems it necessary in order to carry out a mission and operations of the campus, the Employer may contract out work provided that the contracting out does not displace bargaining unit employees or reduces their scheduled hours. The Maine Community College shall notify MSEA-SEIU when contracting out is to be implemented. MSEA-SEIU may request to meet and confer on the impact on contracting out such work. The Maine Community College shall meet with MSEA- SEIU within thirty (30) days of such request. Notice to MSEA-SEIU shall be not later than one hundred twenty (120) days prior to the commencement of the contracting out. In emergency circumstances, when the College enters into a contract under which contracting out will commence in less than thirty (30) days, when possible, notification shall be made two (2) weeks prior to implementing the contract, but in no event later than ten (10) working days after the commencement of the contracting out. Prior to the meeting and conferring on contracting out, the Maine Community College System will provide MSEA-SEIU all relevant written information, including copies of bids received, any cost analysis used by the College to evaluate the need for contracting out, and all other relevant material used by the College in making its decision regarding contracting out. Contracting out of the type of work normally performed by existing bargaining unit members for limited periods not to exceed six (6) months shall be allowed without the Union’s agreement if one or more of the following conditions are present at the affected campus or other non-campus location (such as the System Office in Augusta):

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • Project Work PURCHASER shall complete the following projects in accordance with the specifications provided in Exhibits B, C, D, E, and F and written instructions from STATE. Project locations are shown on Exhibit A unless otherwise described. PURCHASER shall furnish all material unless otherwise specified.