Hidden services Sample Clauses

Hidden services. 12.1 Prior to the Seller commencing any work the Client must advise the Seller of the precise location of all underground services on the site and clearly mark the same. The underground mains & services the Client must identify include, but are not limited to, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigation pipes, telephone cables, fibre optic cables, oil pumping mains, and any other services that may be on site.
AutoNDA by SimpleDocs
Hidden services. Provide details about and drawings showing hidden services and underground structures. If accurate details are not available state what assumptions are to be made by the Contractor concerning such services. Other reports and publicly available information
Hidden services. In the event of a discrepancy between physical condition and the information on a drawing, the Contractor shall notify the Project Manager immediately if the physical condition found on site is such that the deviation from the drawing requires a change in the design of the works.
Hidden services. 12.1 Prior to the Contractor commencing any work the Client must advise the Contractor of the precise location of all hidden services on the site and clearly xxxx the same (including but not limited to any mains/services in wall cavities). The mains & services the Client must identify include, but are not limited to, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigation pipes, telephone cables, fibre optic cables, oil pumping mains, and any other Works that may be on site.
Hidden services. All known services will be brought to the attention of the Contractor by Employers Representative. Should the Contractor encounter any other services in the work area, he will immediately bring them to the attention of the Employers Representative who will issue instructions as to what actions are to be taken. The protection of all pipes, gauges and plant is of extreme importance. Should any damage take place, which is due to the Contractors negligence, another Contractor will be brought onto site to affect repairs. All costs will be to the account of the Contractor who caused damage. Other reports and publicly available information The assumed 1 in 10 year rainfall figures are: Month Cumulative rain (mm) No of days with rainfall > 10mm January 200 6 February 150 6 March 120 5 April 110 4 May 40 3 June 20 2 July 30 2 August 30 2 September 60 3 October 140 6 November 160 7
Hidden services. There are several services buried in and around the sites where the Works will take place, and precaution should be taken while carrying out the works. These services provide critical essential services to the Airside operations and should not be disturbed. Known services include: • Other Buildings in the GAA area • Electrical cables • Storm water pipes • Sewerage pipes • Potable water main • Fibre optic cables • Communication cables • Airfield Ground Lighting • The Fuel hydrant system A copy of the drawings of existing services will be issued to the successful Tenderer, where available.
Hidden services. Provide details about and drawings showing hidden services and underground structures. If accurate details are not available state what assumptions are to be made by the Contractor concerning such services. Other reports and publicly available information This subsection may refer to mapping, hydro-graphic data, hydrological information, shipping movements, tides and published papers or Geological Surveys that the tendering contractor may need to be able to decide his method of working and programme and prepare any designs for which he would be responsible. The Contractors Project SHEQ File  The Contractors Project SHEQ File is to be updated on a continuous basis. The Contractor is to ensure that all relevant documentation and authorisations are contained in the file pertaining to the project. Upon completion of the project, the Contractor is to convert all documentation contained in the SHEQ file into electronic format and save it as a PDF File. The file name should contain the name of the Contractor and the project. The file should then be saved onto a disk or removal storage device and handed over to the Project Coordinator or Project Manager upon completion of the project.  Once the SHEQ file has been submitted for approval, there will only be one opportunity granted to the contractor to rectify any non-conformances and such submission should be made within three working days. Should the safety file fail after the second evaluation the Eskom reserves the right to terminate the contract or cancel task order whichever is applicable depending on the type of contract entered into.
AutoNDA by SimpleDocs
Hidden services. Refer to drawing number SC101 – revision E; titled overall Site layout and details for identified hidden services.
Hidden services. There are no hidden/underground services in the vicinity of the site apart from the boreholes around the site. Other reports and publicly available information Design report for the rehabilitation of the dump site to be made available upon the Contractor’s request
Hidden services. All relevant information will be specified in the Project Specific Agreement for any project executed in terms of this contract. Other reports and publicly available information