O&M Building definition
Examples of O&M Building in a sentence
Qualified Investment and qualified property includes; solar modules/panels, tracking systems, racking and mounting structures, inverters boxes, combiner boxes, meteorological equipment, foundations, roadways, paving, fencing, O&M Building, substation, collection system, generation transmission line, interconnection facilities, control systems necessary for commercial generation of electricity and all and all necessary equipment for commercial generation of electricity.
The proposed project will consist of the following key components: • Solar modules • Inverter Buildings • Underground Electrical Conductors • Substation • Transmission Line • Access and Maintenance Roads • Operations and Maintenance (O&M) Building Key components are described in the following subsections.
All of this in addition to the traditional services provided 2D drawings, Quantity Take Offs, Estimating, As‐Builts, Submittals and O&M, Building System Design, Analysis, Simulation, and Checking.
NKW4 Subsation O&M Building ▇▇▇▇▇, ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇ ▇▇▇ PIN 00742-0071 (LT) PT LT ▇ ▇▇▇ ▇ ▇▇▇▇▇▇▇ ▇▇ ▇▇ ▇▇▇▇▇▇; CHATHAM−KENT 00742-0071 Notice of Lease from ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ and ▇▇▇ ▇▇▇ ▇▇▇▇▇ to North Kent Wind 1 GP Inc.
Wet Pipe System O&M Building Shop Factory Industrial (F- 2) Ordinary Hazard Group 2, 0.2 gpm/sq.ft.
Topographic and boundary survey of selected area adjacent to the Administration (O&M) Building.
Qualified Investment and qualified property includes: solar modules/panels, tracking systems, racking and mounting structures, inverters boxes, combiner boxes, meteorological equipment, foundations, roadways, paving, fencing, O&M Building, substation, collection system, generation transmission line, interconnection facilities, control systems necessary for commercial generation of electricity and all and all necessary equipment for commercial generation of electricity.
Sprinkler System Type O&M Building, except Electrical Room, Shop and Shop Mezzanine Equipment Room.
Wet Pipe System O&M Building Electrical Room Factory Industrial (F- 2) Not sprinklered.