The Pipeline Sample Clauses

The Pipeline. Transportation Facilities include a high-pressure gas transmission pipeline and one Regulating and Metering Station (RMS). The length of transmission pipeline shall be from the source (gas grid) to inlet of the RMS. Design of the transmission pipeline shall be as per ANSI B 31.8: Gas Transmission & Distribution Systems. The class rating shall be as per ANSI class 600. The pipeline must be constructed by the Company or through a Sub-Contractor having proven experience of constructing at least one ANSI class 600, 8” or above diameter pipeline. Welding of pipeline shall be as per API Standard 1104. The welding joints must be enveloped with Heat Shrink Sleeves and the Induction Bends with two-ply polyethylene tapes (Inner Wrap and Outer Wrap). The pipeline must have a minimum cover of 1.0 meter on top of it. Watercourse (if any) shall be crossed by open cut method or Horizontal Directional Drilling (HDD) method depending on the actual site condition. Insulating joints must be used at both ends of the pipeline section. The pipeline shall also be cathodically protected and the design of the cathodic protection system shall be on the basis of soil resistivity as measured in the field. Minimum corrosion allowance shall be 3 mm. • Steel line pipe will be required to use in the transmission pipeline, manufactured as per API Specification SL (latest edition). The line pipe manufacturer must have the authority to use API Official Monogram for minimum five (5) years. The grade of pipe shall be API 5LX60, PSL-2 LSAW. The coating of line pipe shall be 3LPE and factory coated. Minimum wall thickness required to be maintained to operate the pipeline at maximum pressure. • Steel Induction Bends must be fabricated from line pipe to be manufactured as per API Specification 5L (latest edition) by a manufacturer having the authority to use API Official Monogram for minimum five (5) years. The Induction Bend fabricator must have the authority to fabricate Induction Bends under applicable certification for minimum five (5) years. • Ball Valves shall be actuator operated (for main line valves) and gear operated (for other valves), full bore, forged body, fully welded, trunnion mounted combined with double block and bleed, metal-to-metal seal, sealant injection & drain, and must be manufactured as per API-6D by a manufacturer having the authority to use API Official Monogram for minimum five (5) years. • Dynamic/Pressure Balance Plug Valves shall be gear operated, full bore, forged...
AutoNDA by SimpleDocs
The Pipeline. The Parties to this Agreement are relying on the change of service of the Longhorn Pipeline (“Pipeline”) located near Crane, Texas by Magellan Pipeline Company, LP (“Magellan”), which change shall be a condition precedent to this Agreement. The Pipeline is intended to be reversed and converted for crude shipments and will be owned and operated by Magellan. The completion date for the reversal is anticipated to be sometime during the first quarter of 2013. STUSCO has executed a contract (“Magellan Contract”) with Magellan to secure space on the Pipeline for transportation of Crude Oil from Crane, TX to the Houston area.

Related to The Pipeline

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Point of Interconnection The Point of Interconnection shall be as identified on the one-line diagram attached as Schedule B to this ISA.

Time is Money Join Law Insider Premium to draft better contracts faster.