Site Condition definition

Site Condition means all conditions and characteristics of the Site and its surrounds including below ground conditions, all natural and artificial things, asbestos, contamination, and other environmentally hazardous substances, concrete cracking and spalling, facilities, utilities and services on and within the surface and, if the Site includes a building, on and within the building (including those things obscured behind walls, ceilings and beneath the floor);
Site Condition has the meaning set forth in Section 3.25.
Site Condition has the meaning set forth in Section 2.22.

Examples of Site Condition in a sentence

  • Design-Builder shall, to the extent reasonably possible, provide such notice before the Differing Site Condition has been substantially disturbed or altered.

  • Works: Site: Condition 1(1) (Definitions, etc.) Employer The Employer shall be The Secretary of State for Justice.

  • Upon discovering a claimed Differing Site Condition and before the condition is disturbed, Contractor shall immediately: (i) after taking appropriate measures to secure the Work, stop work in and secure the affected area; and (ii) notify Owner’s Contracting Officer.

  • If CM/GC believes it has encountered Differing Site Conditions, then CM/GC shall give Notice to Design Professional promptly before conditions are further disturbed, but in no event no later than four (4) days after the first observance of the Differing Site Condition.

  • THE SECOND PARAGRAPH IS CHANGED TO: The Department will make payment for increased costs resulting from a Type 1 or Type 2 Differing Site Condition as a change in the character of work; however, the Department will not consider making payment for a differing site condition unless the resulting change in cost exceeds $7,500.

  • Any abnormal, adverse weather that affects Builder’s ability to complete the Work shall be treated in the same manner as a Differing Site Condition.

  • If Builder encounters a Differing Site Condition, Builder shall provide notice to Owner as soon as reasonably possible.

  • Any changes to the Contract Price and the Substantial Completion Date as a result of the Differing Site Condition should be done by a written Change Order.

  • If a Differing Site Condition is encountered by Builder when performing the Work, then the Contract Price and the Substantial Completion Date shall be adjusted as follows: (i) the Contract Price shall be adjusted to include the additional costs incurred by Builder plus an additional amount of zero percent (0%) of the additional costs; and (ii) the Substantial Completion Date shall be extended a reasonable number of days necessary to complete the Work as a result of the Differing Site Condition.

  • Builder will not disturb the Differing Site Condition prior to notification and direction from Owner except as necessary to protect the safety of individual, the Project Site and the Work.


More Definitions of Site Condition

Site Condition means any physical, hydrological, topographic, soil, biological (such as plant or animal) or geomorphological feature of an area in question.
Site Condition has the meaning set forth in Section 3.25. *** CONFIDENTIAL MATERIAL REDACTED AND SEPARATELY FILED WITH THE SECURITIES AND EXCHANGE COMMISSION.