Protection of works Sample Clauses

Protection of works. 4.6.7 Making good physical loss and repairing damage to the works.
AutoNDA by SimpleDocs
Protection of works. Please note that all existing works, finishes, etc. are to be protected to the satisfaction of the principal agent and that tenderers should allow in their rates for such protection.
Protection of works. As soon as possible after installation of the liner, the Contractor shall provide protection of the liner by placement of the specified geotextile (Bidim A24 or equivalent) protective cover material and drainage aggregate. If a crusher run filter blanket material is used, the geotextile grade shall be increase to Bidum A34 or equivalent to provide greater protection to the HDPE liner. Extreme care must be taken at all times to avoid damage to the liner. No equipment is permitted to operate on the unprotected liner. Personnel walking on the liner should be kept to a minimum, and footwear must be checked prior to accessing the liner to ensure rocks or other sharp objects are not embedded in the sole. Formwork for the sump slab shall be pre-fabricated in a location external to the lined cell and assembled at the location site. The formwork may only be held in place with screened filter blanket material placed around its perimeter. Under no circumstance should the formwork be staked to the ground. Bar chairs used in the slab construction shall be of a flat based plastic type so as to not damage the HDPE liner.
Protection of works. The Contractor shall carefully protect from damage by weather all work and materials which may be affected thereby.
Protection of works. TS-8 See 2.17 Organisation of the construction site (Art. 79) of the Tender Specifications document.
Protection of works. The Contractor will be solely responsible for the safety of the whole of the Works including the materials and plant on site until the Works are accepted by the Owner as complete. The Contractor is to allow for supplying all necessary materials and effectively protecting from injury, from whatever cause arising, the whole of the Works, and is to allow for keeping the Works free from storm water, subterranean water and flooding by protecting with suitable coverings, pumping, baling or as otherwise required or directed. On each floor, and in all storage places and where otherwise directed by the Engineer, sufficient numbers of fire extinguishers, to the approval of the Engineer shall be provided.
Protection of works. The Contractor shall take all steps necessary to protect the permanent Works and all stores and materials from the effects of inclement weather, including floods and cyclones, theft and shall - be entirely responsible for any delay, damage or loss arising therefrom. The Contractor shall take account in his rates for the mitigation of noise and dust pollution generated in the execution of the contract.
AutoNDA by SimpleDocs

Related to Protection of works

  • Description of Work (a) that has been omitted or

  • Ownership of Work Products Contractor agrees that all work products created or developed for District by Contractor pursuant to this Contract are intended as “works made for hire” and shall be the exclusive property of the District. If any such work products contain Contractor’s intellectual property that is or could be protected by federal copyright, patent, or trademark laws, Contractor hereby grants District a perpetual, royalty-free, fully-paid, non-exclusive, and irrevocable license to copy, reproduce, deliver, publish, perform, dispose of, and use or re-use, in whole or in part, and to authorize others to do so, all such work products. District claims no right to any pre-existing work product of Contractor provided to District by Contractor in the performance of this Contract, except to copy, use, or re-use any such work product for District use only.

Time is Money Join Law Insider Premium to draft better contracts faster.