Plaster. All plaster shall be sound and show no movement when examined.
Plaster. The internal plaster shall be in one coat of cement mortar 1:4. The external plaster in two coat of cement mortar 1:5
Plaster. Rates shall include for provision of: Work at all levels, heights and to all situations and profiles. Double scaffolding, working platforms etc. A coat of xxxxx xxxxxxx soon after the curing period is over. Work in narrow widths and small quantities unless special provision is made to the contrary. Preparation to the surfaces by raking out joints in brick or by hacking the concrete surface and wetting the surface before plastering wherever required. Thickness of plaster exclusive of the thickness of key i.e. grooves and open joints in brickwork, stone work etc. Chamfers of any width, internal and external rounded angles and chases and forming sharp and clean edges as shown. Curing, protection and cleaning of all surfaces. Keeping all plastered surfaces well wetted for at least 7 days.
Plaster. The outside of the building will have sand cement plaster (1:4) ¾” thick (avg.) whereas the inside and the ceiling plaster will be ½” thick (avg.) in C.S. (1:4). DOOR & WINDOW Main Entrance Door : • Teak Finished Flush varnished both sides. • Xxx xxxx door frame. • Tower bolt from inside. • Electric xxxx points in front of gate of Flat and Ground Floor entrance • Godrej night latch. • Telescopic peep Hole. Other doors
Plaster. Cement/lime plaster for internal surfaces shall be applied in two coats, as follows: Undercoat 3/8" thick composed of 1 part cement, 4 parts lime putty, 12 parts clean washed sane, measured by volume, the whole laid evenly, straightened with a rule and scratched to form key. Finishing coat 3/8" thick composed of 1 part cement, 3 parts lime putty, 6 parts clean washed sand, measured by volume, trowelled with a steel trowel to a smooth or textured finish in accordance with samples approved by the Architect/Consultant. A minimum period of 7 days must elapse between the application of undercoat and finishing coat. The total thickness of the plaster must not exceed 3/4". Rough rendering shall be composed of cement and sand (1:4) floated to the thickness required to fill in voids behind facings, dubbing out to uneven surfaces, etc. Dubboing out must not under any circumstance exceed 1" in thickness at any point. Screeds and backings shall be composed of cement and granite fine or sane (1:3) and shall be properly laid to rules and floated to a surface suitable to receive the finishings specified. Mixing of lime/cement plaster, cement rendering and screeds shall be carried out with machine driven roller-pan mixers of a type and size approved by the Architect/Consultant. For smaller quantities, or in exceptional circumstances, the Architect/Consultant may require or approve mixing by hand on a clean dry floor or platform. Measurement of all constituents is to be made by means of gauge boxes. Gypsum plaster shall be of approved manufacture, delivered to the site in the manufacturer's sealed bags or drums, bearing the name of the manufacturer and the brand of plaster are to be in accordance with B.S.1191 for the following types - Undercoat plasters are to be borrowing or "slow setting xxxxxxxx" of class "B", type a - retarded semi-hydrates. Finishing plaster used on undercoats is to be of Class `B' type b - retarded semi-hydrates or class "B" type c - dual-purpose plaster. Finishing plaster used or plasterboard is to be of "Board finish" type, Class "B", type b - retarded semi-hydrates. Keepe's Cement is to be dual-purpose type in accordance with class "B", type c. Plaster of Paris to be in accordance with class "B". Joints of brickwork, etc. are to be thoroughly raked out and loose particles of mortar, etc. brushed out to form key for plaster. Concrete work generally is to have a coat of "spatterdash" applied to form key for plaster, etc. The concrete shall be dampe...
Plaster. External surface of the building shall be plastered with 20 mm thick 1:6 Cement and Sand mortar. Internal surface of walls shall be plastered with 12/19 mm thick 1:6 cement and sand mortar. Ceiling shall be plastered with 6mm thick 1:4 cement and sand mortar. FLOORING : Floors shall be of tiles. All stairs of marble. BATH ROOM : Floor marble with 6” inch. skirting ( Tiles fittings with border up to 6’-0’’ height ). Indian Pan/ Commode (white) of reputed company will be provided in toilet with 2 Taps and 1 shower . DINING : White basin and 1 Tap. KITCHEN : Oven platform Sink and 1 Tap in Kitchen ,Tiles upto 4’-0”. SKIRTING All rooms and passages floor shall have skirting of 6” inch. Wide finished to neat with the adjacent floor.
Plaster. Repair any damaged interior or exterior plaster as directed by the COR. The plaster material shall be of a similar material that matches as closely as possible the existing plaster in texture and color.
Plaster. External wall in sand faced Plaster & Internal xxxx Xxxxx Finish Plaster
Plaster. Contractor calls Owner’s attention to, and Owner acknowledges, the limitations of patching plaster. While Contractor shall make every effort to match existing textures, colors, and planes, exact duplication is not promised. Filled Ground or Rock Unless this Contract specifically provides otherwise,excavating does not include work on filled ground, ground of inadequate bearing capacity, or rock or any other material not removable by ordinary hand tools. This works shall be an extra work item subject to paragraph 13 of this Contract.
Plaster. All walls shall be plastered with cement mortar ceiling with cement mortar as per stranded norms.