Horizontal and vertical Sample Clauses

Horizontal and vertical growth increases or extra-curricular dollars will be added to each teacher’s salary.‌
AutoNDA by SimpleDocs
Horizontal and vertical. Cabling for Sites with more than one floor or Telecommunications Room (TR) Horizontal and Backbone Specifications for SITES utilizing multiple floors and/ or multiple TRs
Horizontal and vertical supply chain cooperation for the creation and development of short supply chains and local markets; 16.5 - Joint actions for climate change mitigation; The first level of compliance corresponds to the execution of the planned interventions (investments), which is fixed at least 85% of the investments proposed. The second concerns the individual instances which must comply with the compliance rules established by the individual measures and sub-measures of the Tuscan RDP. Thus the eligibility of the individual instances is mainly guaranteed by the adherence and the coherence with the ITP proposal. Participation: With the participation of 36 private and public subjects the contract covers over 4,300 ha, of hilly and semi-flat orography, which winds along the edge and in correspondence with the territory of the National Park, on the islands of Elba, Capraia, and Giglio. Involved parties: The ITP involves one public leader (DISPAA UniFi), 34 direct private participants (farmers, wineries, wine growers), 5 direct public participants (PNAT, the Tuscany Coastal Reclamation Consortium - CdB, the Union of Municipalities of the Metalliferous Hills - UCCM and the Civic Uses Manager of Capraia Xxxxx - XXXX). The two indirect participants are: Legambientee Arcipelago (environmental stakeholder) and BCC Banca dell’Xxxx that facilitates the access to credit. The benefits for leader: Direct management and coordination of this network of innovation; The benefits for the private direct participants: Environmentally related to the opportunity of upgrading their farming area and activities; The benefits for the public direct participants: Environmentally related to the opportunity of securing large investments necessary for the development of the territory; growing expertise and local knowledge through the network to manage identified problems; Funding/payments: Incentive payments within the EU funding scheme for RDP measures. Payments are directed towards those direct participants responsible for the planned interventions with percentages that vary according to the planned intervention. The financing can cover all the costs, as well as only a part of them. For productive investments about 80% is covered by the Region and 20% by the participants, while for sub-measure 4.4.1 the support is set at 100% by the Region. There is an interest in the development of short-chain productions, but a specific product has not yet been identified. PRODUCT Resource/investments allocation: - ...
Horizontal and vertical. Datum’s will be based on Indiana State Plane Coordinate System, West Zone. This will allow for quick integration of available GIS data.

Related to Horizontal and vertical

  • Building Access i. Access to Secured buildings: Contractor will work through the GIT Contract administrator for access to the building.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Work Site Work site shall be defined as a college campus or any other place designated by management where instruction and/or services are performed.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Study Area The study area focused on the Bulk Power System in South-Eastern New York between Albany and New York City, and voltages underlying systems at 115 kV and above in the lower Xxxxxx Valley (Zones G, H & I). In the PSS™E power flow base case provided by NYISO, facilities rated at 115 kV and above in PSS™E designated areas 6 through 11 are monitored in the study. These areas are: • Capital District • Xxxxxx • Millwood • Xxxxxxxxx • Con Ed • Long Island

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Work Area The specific work area and/or crew an employee reports to on a daily schedule. Work areas are generally smaller divisions of a larger Bid Area.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

Time is Money Join Law Insider Premium to draft better contracts faster.