Time for Completion of Construction definition

Time for Completion of Construction means the period from the Compliance Date to the date of issue of Construction Completion Certificate in accordance with the Project Implementation Schedule, which involves the design, setting out, construction of works, erection and installation of equipments, commissioning, testing and certification of works.
Time for Completion of Construction means the time for completing theConstruction with any extension
Time for Completion of Construction means construction of the Circuit House and completion of balance pending works as specified in Schedule III of this agreement and as per the guidelines of Ministry of Tourism, Government of India Annexure – III and Scope of work as set out under the RFP. The Construction Period is reckoned from the Compliance Date to the date of issue of Construction Completion Certificate in accordance with the Project Implementation Schedule as per Article 8.6.

Examples of Time for Completion of Construction in a sentence

  • If the Concessionaire delays completion of Construction beyond the Construction Period or the Time for Completion of Construction and if in the opinion of the Independent Engineer, such delay is caused by any negligence, default, or failure of the Concessionaire, no extension of the Construction Period or the Time for Completion of Construction shall be given by the Authority.

  • The Concessionaire shall, at the same time, notify the Authority and Independent Engineer of the steps being taken to expedite progress so as to achieve completion within the Construction Period or the Time for Completion of Construction as specified under Article12.2.

  • The Concessionaire shall, at the same time, notify Authority and Independent Engineer of the steps being taken to expedite progress so as to achieve completion within the Time for Completion of Construction as specified under Article12.2.

  • If the Concessionaire delays Completion of Construction beyond the Time for Completion of Construction and if in the opinion of the Independent Engineer, such delay is caused by any negligence, default, or failure of the Concessionaire, no extension of Time for Completion of Construction shall be given by the Authority.

  • The development of the project shall be in accordance with the Construction Period or the Time for Completion of Construction, provided that this period, as stated, may be extended by mutual agreement in writing between both the Parties.

  • The development of the Circuit House shall be in accordance with the Construction Period or the Time for Completion of Construction, provided that this period, as stated, may be extended by mutual agreement in writing between both the Parties.

  • These problems are addressed to a greater extent to domestic firms and are less critical for internationally operated ones, since they have better access to knowledge due to global experience and networks (Davidson et al., 2018).

  • Notwithstanding anything to the contrary in this Article, a revision in the Project Implementation Schedule that results in the extension of the Construction Period or the Time for Completion of Construction shall become effective only after it has been approved in writing by the Authority.

  • The Board of Directors shall initially consist of seven directors and the number of directors constituting the Board of Directors shall thereafter be determined as set forth in the Bylaws of the Corporation.

  • The Concessionaire shall, at the same time, notify the Authority and Independent Engineer of the steps being taken to expedite progress so as to achieve completion within the Construction Period or the Time for Completion of Construction of temporary structure as specified under Article12.2.


More Definitions of Time for Completion of Construction

Time for Completion of Construction means the time for completing the Construction with any extension
Time for Completion of Construction means the time for completing the Construction with any extension under Clause 28 [Extension of the Agreed Date of Completion], calculated from the Commencement Date.
Time for Completion of Construction means Temporary construction at the Food Court and completion of balance pending works as specified in Schedule III of this agreement and Scope of work as set out under the RFP. The Construction Period is reckoned from the Compliance Date to the date of issue of Completion Certificate in accordance with the Project Implementation Schedule as per Article 8.6.

Related to Time for Completion of Construction

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Original construction ’ shall mean the first or initial construction

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • GENERAL AND SPECIAL CONDITIONS OF CONTRACT means the instructions to Tenderer and General and special conditions of contract pertaining to the work for which above tenders have been called for.

  • Construction and demolition debris means and includes:

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • General Conditions Cost means costs incurred and minor work performed by Contractor without the need for competitive bids/proposals. The allowable General Conditions items are limited in Paragraph 11.1 and are further described on Exhibit “D”. The maximum allowable General Conditions Cost payable to Contractor during the Construction Phase of the Project is set out in Exhibit “A” attached to this Agreement.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.