Temporary Construction Sample Clauses

Temporary Construction. The installation of the Facilities shall be performed in accordance with traffic control plans for temporary construction work that are approved by the City, which approval shall not unreasonably be withheld, conditioned or delayed.
AutoNDA by SimpleDocs
Temporary Construction. Remove traces of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, and stockpiles of excess or waste materials. Grade temporary roads, parking areas, and similar temporarily used areas to conform with surrounding contours.
Temporary Construction. X. Xxxxxxx: Design and place suitable temporary bridges where necessary for the maintenance of vehicular and pedestrian traffic. Assume responsibility for the sufficiency and safety of all such temporary work or bridges and for any damage that may result from their failure or their improper construction, maintenance, or operation. Indemnify and save harmless the ClTY and the CITY'S representatives from all claims, suits or actions, and damages or costs of every description arising by reason of failure to comply with the above provisions.
Temporary Construction. Landlord hereby grants and conveys to Tenant an easement and right of entry in the Traville Future Development Land for the purpose of access, storage of building supplies, materials and equipment, and staging of construction, for any and all purposes reasonably related to the construction of any additional improvements on the Premises and/or the alteration, restoration, repair or replacement of the Premises or any part thereof (including, without limitation, any Easement Areas), which construction, alteration and repair shall be subject to the provisions of Article 6 of this Lease. The size and location of this Easement Areas for temporary construction shall be subject to Landlord’s prior written approval, which will not be unreasonably withheld, conditioned or delayed.
Temporary Construction. The Contractor shall furnish all temporary construction as needed by the Contractor for this project. Temporary construction shall include weather-tight enclosures, temporary roadways and parking areas, erosion control structures, material staging and lay down areas, material storage structures and enclosures, enclosures for tools and other equipment, and a field office with appropriate facilities for storing plans, records, and other supplies necessary for the field management of the project.
Temporary Construction. Grantee and its agents shall have the further right to use, for initial construction purposes only, a strip(s) of land as shown on the said Exhibit “A”, as a temporary construction easement area. The temporary easement is for construction purposes only and shall terminate when the need therefor passes. The easement shall expire at such time as Grantee terminates, abandons or otherwise permanently ceases to operate Grantee’s wind farm for which the easement is being granted.
Temporary Construction. Grade temporary roads, parking areas, and similar temporarily used areas to conform to surrounding contours. When construction is over, remove traces of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, and stockpiles of excess or waste materials, and repair the area as specified in CTOs.
AutoNDA by SimpleDocs
Temporary Construction. The Contractor shall furnish all temporary construction as needed by the Contractor for this project. Temporary construction shall include weather-tight enclosures, temporary parking areas, material staging and lay down areas, material storage structures and enclosures, enclosures for tools and other equipment, and a field office with appropriate facilities for storing plans, records, and other supplies necessary for the field management of the project.

Related to Temporary Construction

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.

  • During Construction Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • General Construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the internal laws of the State of New York.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Delays during construction Without prejudice to the provisions of Clause 10.3 (ii), in the event the Contractor does not achieve any of the Project Milestones or the Authority’s Engineer shall have reasonably determined that the rate of progress of Works is such that Completion of the Project Highway is not likely to be achieved by the end of the Scheduled Completion Date, it shall notify the same to the Contractor, and the Contractor shall, within 15 (fifteen) days of such notice, by a communication inform the Authority’s Engineer in reasonable detail about the steps it proposes to take to expedite progress and the period within which it shall achieve the Project Completion Date.

Time is Money Join Law Insider Premium to draft better contracts faster.