Refrigeration circuit, Evaporator, Condenser & AHU’s Sample Clauses

Refrigeration circuit, Evaporator, Condenser & AHU’s admin, VC and underground ,control room aircon system Operational tests  Cycle the unit(s) through a sequence of operation(s) in order to determine if the operating conditions and sequences are correct. Make any necessary adjustments and calibrations to ensure proper operation of equipment.  Check control system for proper response and operation. Adjust as required to maintain equipment in good operating condition per manufacturer's recommendations.  Verify the operation of the unit controller modules LED’s, displays and alarms.  Inspect high and low pressure switches for correct operation.  Inspect refrigerant circuit for any leakages, repair and charge the refrigerant circuit if necessary.  Inspect correct level of refrigerant charge top up as and when required  Inspect compressor current absorption.  Inspect cooler loops for dirt and clean if necessary.  Inspect entry and exit points of refrigerant pipes at condensers and air handling units for wear due to vibration and repair if necessary.  Inspect and clean condenser cooling tubes.  Check refrigerant circuit oil level and top up if necessary.  Check compressor oil pressure switch for correct functionality.  Check and test safety valves for correct functionality.  Check corrosion protection and biocide levels  Grease chilled water pump bearing  Corrective maintenance when a problem is picked up. Humidifiers  Inspect humidifiers for correct operation and repair where necessary.  Check and change the steam cylinder when the “low output/cylinder change lamp’’ is ON. Note: topping up the refrigerant will be done as and when required. : Airedale refrigerant R410a : Daikin refrigerant R32 : Cofely chiller refrigerant R134a Condensation water drain  Inspect for any dirt or solids clogging and test it for flow through and clean where necessary. Thermostats  Test their operations and adjust/repair accordingly where necessary.  Test reheating circuits for correct operation and repair where necessary.
AutoNDA by SimpleDocs
Refrigeration circuit, Evaporator, Condenser & AHU’s. Admin, VC and Control room aircon system Air Handling Units Filter xxxxxxxx  Inspect air intake filters for dirt, blocked and clean or replace if necessary.  Inspect indoor filter conditions (evaporating and condenser section); if necessary clean/wash or replace them. Clean condenser filter on the outside by using compressed air and if there is heavy staining, use a moderate anti-corrosive water-jet.  Check for cracks between filter frames or between the bank of frames and the duct walls to prevent leaking of unfiltered air.  Check the condition of the filter frames and repair/replace if necessarily Diffusers and Grilles  Inspect air grills for dirt, clean or replace if necessary.  Clean ceiling diffusers using a non-corrosive, environmentally friendly, cleaning agent and hot water and replace where necessary.  Inspect diffusers for damage i.e. cracks broken fins and replace where necessarily.  Check diffusers for sufficient air distribution and measure the air temperature.

Related to Refrigeration circuit, Evaporator, Condenser & AHU’s

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts. An adequately sized 3 phase “wye” wound step down transformer shall be provided to supply 208/120-volt, 3 phase power, for lighting, general service receptacles and dedicated computer based office equipment. Dedicated, isolated ground circuits shall be supplied from separate isolated ground power distribution panel(s). Lighting circuits shall be supplied from separate lighting panel(s). Panels shall have 20% spare capacity and be complete with 10% spare breakers of each size, but no less than 1 spare. No more than 4 duplex receptacles shall be connected to any single 20-amp dedicated isolated ground circuit or general service circuit.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • Electrical Provide drawings for the following systems:

  • Transport Allowance In partial modification of Clause 10 of the Bipartite Settlement dated 2nd June 2005, Transport Allowance shall be paid as under with effect from 1st November, 2007. Clerical and Subordinate Staff Upto 15th stage of the scale of Pay - Rs. 225/- per month 16th stage of the scale of Pay and above - Rs. 275/- per month Note:

  • Dry Cleaning Timpson have over 520 dry cleaning stores and are now the UK’s biggest family-run dry cleaner. We process and clean up to 40,000 garments per week and have 32 Dry Cleaning production sites located around the UK. 19 of these sites are Timpson Super Hubs and act as satellite production centres. We offer customers a next day service on everyday items and quality check each garment before it leaves production. Dry Cleaning by Timpson See prices, opening times and more about dry cleaning and laundry services in , . From £2 per item. : Dry cleaning & laundry services DLS have the expertise to advise, design, supply, install & maintain your professional laundry equipment

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.