Water pump Sample Clauses

Water pump. The size and capacity of the water pump must be sufficient to provide a discharge of not less than twenty (20) gallons per minute when pumping through fifty
AutoNDA by SimpleDocs
Water pump. 6-10 WHEELS/TIRES ..............................................................
Water pump. 2.1.6.1 Constant displacement tubular-type pump driven by an in-line hydraulic motor delivers 7.6 GPM at75 PSI
Water pump. A detailed listings of the fixtures is given in annex 1 hereof and is considered part of the Contract.
Water pump. Class 1, Class 5, Class 7 vehicles will not have a water pump if a water tank is not required. − A water pump will be installed in the superstructure pump location, conforming to the ISO EN norm and having EN 1028-1 + A1 and CE certificates, which will be driven by PTO, with normal and high pressure stages. If the power of the PTO is insufficient, it will be driven by intermediate gearbox. The PTO chassis to be used will be a product deemed appropriate by the manufacturer and this issue will be documented during the inspection phase. Bidding companies will submit the manufacturer company’s catalogs or brochures containing technical values related to PTO at the bidding stage. − Pump's fans, diffuser and body will be made of seawater resistant alloy material, and the pump shaft will be made of stainless steel. Water tightness of the pump will be provided. − Water pump will have an automatic self-suction with at least 1 low and 1 high pressure stage. − The low-pressure stage will have a geographic suction depth of 3 meters and at least 3000 liters/minute in normal weather conditions at minimum 10 bar pressure, and the high pressure stage will have a water treatment capacity of at least 250 liters / minute at 35 to 40 bar pressure under the same suction and weather conditions. Water pump manufacturer’s catalogs or brochures containing technical values shall be provided. − Cancelling of the high-pressure water connection of the high-pressure part of the pump should be possible when not needed. Water pump will be equipped with: − 1 water inlet with 4 "diameter union and cover − There will be 4 normal pressure couplings (water outlets), 2 of which will be 2” type and 2 of them will be 2.5” storz type. − There will be at least one 1” type high pressure water outlet. − There will be a foam mixing system on the pump that can suck from external sources, which shall be equipped with an adjustable foam proportioner at the rate of 3% to 8%. − In cold weather and when the vehicle is moving, the hot water in the engine cooling system will be passed through the hot water pocket on the pump by means of a suitable installation and system, and returned to the engine cooling system to prevent freezing of the water in the pump. In order for this system to be deactivated when necessary, a suitable valve mechanism will be installed in a place that can be accessed manually. − Pump vacuum and first suction system will perform fully automatically. First suction will be provided wi...

Related to Water pump

  • Wastewater Developer shall install all required sewer lines and appurtenances. Prior to the issuance of any building permits for the Development, all sanitary sewer improvements shall be substantially completed as determined by the Town and all associated wastewater capacity fees shall be paid.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • WATERBEDS The Tenant: (check one) ☐ - Shall have the right to use a waterbed on the Premises. ☐ - Shall not have the right to use a waterbed on the Premises.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

Time is Money Join Law Insider Premium to draft better contracts faster.