Proposed GWD Project Facilities Sample Clauses

Proposed GWD Project Facilities. SNWA has requested ROWs from the BLM to construct the following proposed facilities: • Pipelines – approximately 306 miles of buried wa ter pipelines, between 30 and 96 inches in diameter • Pumping Stations – 5 pumping station facilities • Regulating Tanks – 6 xxxxxx xxxx tanks, each approximately 3 to 1 0 m illion ga llons in capacity • Pressure Reducing Stations - 3 facilities • Buried Storage Reservoir – a 40 million gallon buried storage reservoir • Water Treatment Facility– a 165 million gallon per day facility • Power Facilities – approximately 323 miles of 230 kilovolt (kV), 69 kV, and 25 kV overhead power lines, 2 prim ary electrical substations (230 to 69 kV), 5 secondary substations (69 to 25 kV) • Temporary and permanent access roads • Alternatives to Tier 1 of the Prop osed Projec t tha t a re b eing cons idered by BL M are described in the attached map. Future Tiers: Anticipated Future GWD Project Facilities Future facilities will be required to develop permitted groundwater rights and convey them to the primary conveyance facilities. The final locations of the groundwater production xxxxx and associated facilities to convey water into the primary system have not yet been determined. The xxxxx will be located based on several factors, which include but are not limited to geology, hydrology, well interference studies, environmental issues, existing senior water rights, and proximity to main and lateral pipelines. Production well locations are also subject to approval by the Nevada Division of Water Resources, Office of the State Engineer (Nevada State Engineer). Since the specific location of these facilities cannot currently be identified, SNWA has not yet requested ROW for them from the BLM. However, assumptions regarding the number of xxxxx, length of collector pipelines, and other needed facilities have been made by SNWA so that BLM can conduct a programmatic-level environmental impact analysis of construction and operation of future facilities in addition to the site-specific analysis of proposed ROWs for primary facilities. SNWA anticipates that future facilities will include: • Groundwater Production xxxxx – estimated between 144 and 174 xxxxx • Collector Pipelines – estimated between 177 and 434 miles, 10 to 30 inches in diameter • Pumping Stations - 2 facilities • Power Facilities – estimated between 177 and 434 miles of 25kV overh ead power lines, 2 secondary substations, and 3 hydroturbine energy recovery facilities. The following le...
AutoNDA by SimpleDocs

Related to Proposed GWD Project Facilities

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Rest Facilities The District shall designate restroom and lunchroom facilities at each work site.

  • Sub-projects 1. The Participating Bank shall make Sub-loans to Beneficiaries and appraise, review, approve, and supervise Sub-projects in accordance with the criteria, conditions and procedures set forth in the Operations Manual, including, inter alia, the following eligibility criteria:

  • Project Completion Part 1 – Material Completion

  • New Facilities For all new Generating Facilities to be interconnected pursuant to the Tariff, other than wind- powered and other non-synchronous generation facilities, the Generation Interconnection Customer shall design its Customer Facility to maintain a composite power delivery at continuous rated power output at a power factor of at least 0.95 leading to 0.90 lagging. For all new wind- powered and other non-synchronous generation facilities the Generation Interconnection Customer shall design its Customer Facility with the ability to maintain a composite power delivery at a power factor of at least 0.95 leading to 0.95 lagging across the full range of continuous rated power output. For all wind-powered and other non-synchronous generation facilities entering the New Service Queue on or after November 1, 2016, the power factor requirement shall be measured at the high-side of the facility substation transformers. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. For all wind-powered and other non-synchronous generation facilities entering the New Service Queue on or after May 1, 2015, and before November 1, 2016, the power factor requirement shall be measured at the generator’s terminals. For new generation resources of more than 20 MW, other than wind- powered and other non-synchronous Generating Facilities, the power factor requirement shall be measured at the generator’s terminals. For new generation resources of 20 MW or less, and all wind-powered and other non-synchronous generation facilities entering the New Service Queue prior to May 1, 2015, the power factor requirement shall be measured at the Point of Interconnection. Any different reactive power design criteria that Transmission Provider determines to be appropriate for a wind-powered or other non-synchronous generation facility shall be stated in the Interconnection Service Agreement. A Transmission Interconnection Customer interconnecting Merchant D.C. Transmission Facilities and/ or Controllable A.C. Merchant Transmission Facilities shall design its Customer Facility to maintain a power factor at the Point of Interconnection of at least 0.95 leading and 0.95 lagging, when the Customer Facility is operating at any level within its approved operating range.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Project Area The Project Area is the incorporated area of the City of San Xxxx.

  • PUBLIC FACILITIES Supplier’s employees may be required to perform work at government- owned facilities, including schools. Supplier’s employees and agents must conduct themselves in a professional manner while on the premises, and in accordance with Participating Entity policies and procedures, and all applicable laws.