Maintenance of Roads During Construction Sample Clauses

Maintenance of Roads During Construction. The County and Developer shall coordinate maintenance activities on Designated Roads during construction. The County shall continue regular maintenance activities on Designated Roads with little or no active Hauling Activities. The Developer shall perform maintenance activities on Designated Roads with active Hauling Activities to ensure the safe passage of the travelling public during construction. The Developer’s road maintenance activities during construction shall constitute continuous and effective work prosecuted day by day, with adequate equipment and forces to the end that all roadways and structures are kept in such reasonably satisfactory condition at all times, as determined by the County Engineer.
AutoNDA by SimpleDocs
Maintenance of Roads During Construction. The Developer shall maintain all Designated Roads and Haul Roads during construction in a condition that is reasonably satisfactory to allow for the safe passage and use by motor vehicles and to the reasonable satisfaction of the County Engineer. Designated Roads and Haul Roads shall include roadways used for the transport of aggregate materials from gravel sources to the project location within jurisdictions that are Party to this Agreement. Maintenance during construction shall constitute continuous and effective work prosecuted day by day, with adequate equipment and forces to the end that all roadways and structures are kept in such reasonably satisfactory condition at all times. If, at any time, the Developer fails to comply with these provisions, the County Engineer will notify the Developer of the deficiencies. If the Developer fails to remedy unsatisfactory maintenance within 24 hours after receipt of verbal or written notice to do so, the Department may immediately proceed to maintain the roadway at the expense of the Developer. Maintenance may include but is not be limited to dust control measures, pavement sweeping, blading of gravel surfaces, aggregate surfacing, and bituminous surfacing. The County may, in its discretion and as staff time permits, make daily inspection of the Designated Roads and the Haul Roads to ensure compliance with the Developer’s maintenance and safety obligations. There may be times when immediate action may be required to protect the public safety. When this need arises, the Developer Party will be verbally notified of the problem and instructed to take immediate action to correct the problem. If the problem is not corrected immediately, the County shall arrange to have the correction done by others. For the entire portion of any gravel roadway that is being used for hauling operations or, for access and exiting tower sites by workers, the Developer Party shall provide dust control measures. The gravel road surface shall be bladed as needed to provide the safe travel of automobiles. When a roadway is not passable for automobiles in a safe manor due to rutting, potholes or other deformation of the roadway, corrective action shall be taken. This corrective action shall include, as appropriate, bituminous patching, filling pot holes, or placing 1” to 1-1/2” rock on gravel roads. In certain instances, placing an engineering fabric or geogrid with MN/DOT class 5 gravel or rock 6” thick over the material to bridge the weak a...

Related to Maintenance of Roads During Construction

  • Delays during construction Without prejudice to the provisions of Clause 10.3 (ii), in the event the Contractor does not achieve any of the Project Milestones or the Authority’s Engineer shall have reasonably determined that the rate of progress of Works is such that Completion of the Project Highway is not likely to be achieved by the end of the Scheduled Completion Date, it shall notify the same to the Contractor, and the Contractor shall, within 15 (fifteen) days of such notice, by a communication inform the Authority’s Engineer in reasonable detail about the steps it proposes to take to expedite progress and the period within which it shall achieve the Project Completion Date.

  • Maintenance during Construction Period (i) During the Construction Period, the Contractor shall maintain, at its cost, the existing lane(s) of the Project Highway so that the traffic worthiness and safety thereof are at no time materially inferior as compared to their condition on Appointed Date, and shall undertake the necessary repair and maintenance works for this purpose; provided that the Contractor may, at its cost, interrupt and divert the flow of traffic if such interruption and diversion is necessary for the efficient progress of Works and conforms to Good Industry Practice; provided further that such interruption and diversion shall be undertaken by the Contractor only with the prior written approval of the Authority’s Engineer which approval shall not be unreasonably withheld. For the avoidance of doubt, it is agreed that the Contractor shall at all times be responsible for ensuring safe operation of the Project Highway. It is further agreed that in the event the Project includes construction of a bypass or tunnel and realignment of the existing carriageway, the Contractor shall maintain the existing highway in such sections until the new Works are open to traffic.

  • During Construction Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).

  • PRE-CONSTRUCTION PHASE FEE The Pre-Construction Phase Fee is the total compensation payable to Contractor for the performance of Pre-Construction Phase Services, except for Additional Pre-Construction Phase Services approved in advance and in writing by Owner. The Pre-Construction Phase Fee shall be a lump sum amount based on the AACC established in this Agreement.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • Construction and Maintenance There are on-going maintenance, renovation and construction projects taking place in and around the residences. The work typically takes place during regular business hours, but may begin earlier or extend into evenings or weekends. On-going construction or renovation projects will continue through midterm and final exam periods. The University will take measures to ensure that prudent construction practices are followed, but there may be noise, dust and temporary interruption of some services. Residents may be required to temporarily or permanently relocate to facilitate construction or renovation to their residence area. There will be no compensation or reduction to your residence fees due to disruption and/or relocation.

  • MAINTENANCE OF THE PROJECT (11-20-07) (Rev. 1-17-12) 104-10 SP1 G125 Revise the 2012 Standard Specifications as follows: Page 1-35, Article 104-10 Maintenance of the Project, line 25, add the following after the first sentence of the first paragraph: All guardrail/guiderail within the project limits shall be included in this maintenance. Page 1-35, Article 104-10 Maintenance of the Project, line 30, add the following as the last sentence of the first paragraph: The Contractor shall perform weekly inspections of guardrail and guiderail and shall report damages to the Engineer on the same day of the weekly inspection. Where damaged guardrail or guiderail is repaired or replaced as a result of maintaining the project in accordance with this article, such repair or replacement shall be performed within 7 consecutive calendar days of such inspection report. Page 1-35, Article 104-10 Maintenance of the Project, lines 42-44, replace the last sentence of the last paragraph with the following: The Contractor will not be directly compensated for any maintenance operations necessary, except for maintenance of guardrail/guiderail, as this work will be considered incidental to the work covered by the various contract items. The provisions of Article 104-7, Extra Work, and Article 104-8, Compensation and Record Keeping will apply to authorized maintenance of guardrail/guiderail. Performance of weekly inspections of guardrail/guiderail, and the damage reports required as described above, will be considered to be an incidental part of the work being paid for by the various contract items.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services: