Indigenous Coal Sample Clauses

Indigenous Coal. 19 10.3 Thermal Projects other than Indigenous Coal . . . . . . . . . . . . . . . . . . .. . . .. . 19 11 PROVISIONS FOR OTHER PROJECTS 20
AutoNDA by SimpleDocs
Indigenous Coal. The Request for Proposals (RFP) will be for an integrated coal mining and power generation complex. The feasibility study will identify basic parameters of the project, such as geological conditions, optimum net capacity, estimated annual plant factor, transmission line requirements, etc., necessary to allow firm bids for the development of the identified project. While feasibility studies will be carried out in accordance with international standards, GOP will, however, not guarantee their contents or conclusions. Bidders will have the right to examine, evaluate and form their own conclusions on any or all aspects of the feasibility study and to make any additional investigations at its own cost. The arrangements for funding and review process as outlined in Section 9 for hydel projects will also be applicable to indigenous coal based projects.

Related to Indigenous Coal

  • Fertilizer Purchaser shall evenly spread the fertilizer listed below on all exposed soil inside the grubbing limits at a rate of 200 pounds per acre of exposed soil. Fertilizer must meet the following specifications: Chemical Component % by Weight Sulphur 3 Inerts 49 SECTION 9 – POST-HAUL ROAD WORK 9-3 CULVERT MATERIAL REMOVED FROM STATE LAND Culverts removed from roads become the property of the Purchaser and must be removed from state land.

  • Petroleum Storage Systems A. At Company’s expense, Company will at all times comply with all federal, state, and local requirements, including but not limited to, the regulations of the FDEP as stated in Chapters 62-761 and 62-762, FAC, the requirements of the Federal Oil Pollution Prevention regulation found in Title 40 of the Code of Federal Regulations Part 112 (40 CFR part 112), as well as the requirements of the Environmental Protection Commission of Hillsborough County (EPC), as may be amended or replaced, pertaining to petroleum storage tank and piping system construction, operation, inspection, and compliance monitoring programs; release detection methods and procedures; maintenance; and preventative maintenance programs. Company will be responsible for all spillage, overflow, or escape of gases, petroleum or petroleum products, and for all fines and penalties in connection therewith. All petroleum storage systems will be registered by Company, and Company will display the registration placard as required by law.

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • PROPANE GAS SYSTEM SERVICE AREA If the Property is located in a propane gas system service area owned by a distribution system retailer, Seller must give Buyer written notice as required by §141.010, Texas Utilities Code. An addendum containing the notice approved by TREC or required by the parties should be used.

  • Minerals All minerals, crops, timber, trees, shrubs, flowers and landscaping features now or hereafter located on, under or above Land;

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Infertility Services This plan covers the following services, in accordance with R.I. General Law §27-20-20. • Services for the diagnosis and treatment of infertility if you are:

Time is Money Join Law Insider Premium to draft better contracts faster.