HARVEST METHOD Sample Clauses

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions); shovel or xxxxxx-xxxxxxx on sustained slopes 35% or less. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 stations of required construction. 65.29 stations of optional construction. 121.06 stations of required prehaul maintenance. Rock may be obtained from the following source on State land at no charge to the Purchaser: Bummer Pit at station 393+31 of the SU-ML Road. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 cubic yards of riprap and 10,865 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presented. FEES: $88,111.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.
AutoNDA by SimpleDocs
HARVEST METHOD. Shovel and Track skidder. This sale is estimated to be 100% ground based yarding. A detailed felling and yarding plan shall be required prior to any harvest activities. Ground based yarding are restricted to slopes of 40% or less and shall only operate during dry soil conditions. For additional harvest requirements refer to the H-140 clause in the contract. ROADS: 71.5 stations of required pre-haul maintenance. 7.5 stations of road decommissioning. The 200 cubic yards of 2 1/2 INCH MINUS rock used in accordance with the quantities in the ROCK LIST in the road plan this contract may be obtained at no cost to the Purchaser from the Lincoln Quarry stockpiles, located in Section 15, Township 14 North, Range 05 Xxxx, X.X., Rock for this sale may be obtained from any commercial source at the Purchaser's expense with written approval by the Contract Administrator. ACREAGE DETERMINATION CRUISE METHOD: The sale acres were determined by GPS. The sale area was cruised using a variable plot cruise method. FEES: $6,390.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price. SPECIAL REMARKS: This sale contains approximately 14 mbf of WH high quality 2 saw, 43 mbf of WH high quality 3 saw, 41 mbf of high quality SF 2 saw, and 22 mbf of high quality SF 3 saw. See cruise for further details. This sale contains approximately 20 mbf of WH blowdown. T I M B E R S A L E M A P S A L E NAM E : AG RE E M E N T # : LINCOLN SALVAGE 30-095699 RE G I O N : CO UN T Y ( S ) : Pacific Cascade Region XXXXX T O W N S H I P (S ): TR U S T( S ) : 0 500 1,000 2,000 3,000 Feet > > > T14R05W Common School and Indemnity(3) > > > > > > " > > > > > > > EL EVAT I O N R G E : 2141-2362 > > > > > > > > > > > > > > > > 123°19'W > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > 46°42.5'N > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > 5 ]%o]%5 L-3042A > > > > > > > > > > Private > ]%5 ]%5 ~ ~ ~ ~ ~ > > ~ > > ~ > > > > > ~ ~ ¦ > ~ > > > ] ]%k]%4 ¦ ~ ~ %4 ~ ~ > k ~ ~ > > > > o 9 Private > > > > > > > > > > > > > > > > > > > > 46°42.5'N > >> " > > > > ]%4 > >> > > > > > > > > > > > > > > > > > Xxxx 0 > > > > > 13 Acres > > > > > > > > > > ~ > > > > > > > > > > > > > > >> ~ ~ ~ > ~ > >> > ~ ~ > > > > > > > > > > > > > > > > > > 304 > > - L > > > > > > > > > > > > > > > > > >> > > Le w ii s o]%5 > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >...
HARVEST METHOD. 1. The method of harvesting is . (Describe appropriate method): (Tree-length or log-length skidding by either tracked or rubber-tired equipment, cable skidding, in-xxxxx processing, etc.)
HARVEST METHOD. Cable and Ground based equipment. Harvesting activities are estimated to be 8% cable harvesting and 92% ground-based harvesting. Ground-based harvesting equipment shall be restricted to slopes of 40% and less, and restricted during saturated soil conditions. See clause H-140 for further harvest requirements. A detailed felling and yarding plan shall be required prior to any harvest activities and approved in writing by the Contract Administrator.
HARVEST METHOD. Sale is estimated to be 100% ground-based. Falling and Yarding will not be permitted from November 1 to August 1 unless authorized in writing by the Contract Administrator.
HARVEST METHOD. Cable and Ground based equipment. Harvesting activities are estimated to be 5% cable and 95% ground-based. Ground based equipment will not be permitted on slopes over 45%. See clause H-140 for further harvest requirements. A detailed felling and yarding plan shall be required prior to any harvest activities and approved in writing by the Contract Administrator Falling and Yarding will not be permitted from November 15 to May 31 unless authorized in writing by the Contract Administrator. ROADS: 31.92 stations of required construction. 43.43 stations of required reconstruction. 55.55 stations of optional construction. 67.66 stations of optional reconstruction. 322.87 stations of required pre-haul maintenance.58.85 stations of abandonment. Rock used in accordance with the quantities on the ROCK LIST may be obtained from the B-1321 Pit located in Xxx 00, X00X, X00X, X.X. Xxxx used in accordance with the quantities on the ROCK LIST may be obtained from any commercial source at the Purchaser's expense subject to written approval from Contract Administrator. Road construction will not be permitted from October 1 to May 31 unless authorized in writing by the Contract Administrator for all roads and all type of work. The hauling of forest products will not be permitted from November 15 to May 31 unless authorized in writing by the Contract Administrator in all units on the 2750 ACREAGE DETERMINATION CRUISE METHOD: The sale acres were determined by GPS. The sale area was cruised using a variable plot cruise method. FEES: $114,600.00 is due on day of sale. $1.12 per ton is due upon removal. These are in addition to the bid price.
HARVEST METHOD. Cable, Tethered Equipment, and Ground-based Equipment. Falling and Yarding will not be permitted from February 1 to July 1 unless authorized in writing by the Contract Administrator due to spring breakup and beetle timing restrictions. ROADS: 21.68 stations of required construction. 796.14 stations of required prehaul maintenance. 21.87 stations of decomissioning. Road construction will not be permitted from November 15 to May 31 unless authorized in writing by the Contract Administrator due to frozen conditions and spring breakup. The hauling of forest products will not be permitted from February 1 to July 1 unless authorized in writing by the Contract Administrator due to spring breakup and beetle timing restrictions ACREAGE DETERMINATION CRUISE METHOD: Acreage determined using GPS methods. Acreage shown above is net harvest acres in harvest units. Ponderosa pine and western red cedar: 8.0 - 17.5 inches dbh has a minimum top of 5.6 inch dib. All other species: 7.0 - 17.5 inches dbh has minimum top of
AutoNDA by SimpleDocs
HARVEST METHOD. Cable/Cable Assist and Shovel. This sale is estimated to be 80% cable/cable assist and 20% shovel. Shovel yarding is restricted to slopes of 40% or less. For additional harvest requirements, refer to the H-140 clause in the contract. Shovel Yarding will not be permitted from November 1 to May 1 unless authorized in writing by the Contract Administrator. ROADS: 19.40 stations of optional construction. 7.45 stations of optional reconstruction. 460.50 stations of required pre-haul maintenance. Rock used in accordance with the quantities on the ROCK LIST may be obtained from the Browns Quarry located in Sec 19, T13N, R06W, X.X. or P&E Ridge Pit located in Xxx 00, X00X, X00X, X.X. Xxxx used in accordance with the quantities on the ROCK LIST may be obtained from any commercial source at the Purchaser's expense subject to written approval from Contract Administrator. All road work will not be permitted from November 1 to May 1 unless authorized in writing by the Contract Administrator. The hauling of forest products will not be permitted from November 1 to May 1 unless authorized in writing by the Contract Administrator. ACREAGE DETERMINATION
HARVEST METHOD. Harvest activities are estimated to be 15 percent downhill cable, 55 percent uphill cable, and 30 percent ground based harvest. Cable or ground based equipment, with cable- tethered equipment limited to sustained slopes 70 percent or less, and all other ground based equipment limited to sustained slopes 45 percent or less. Yarding may be restricted during wet weather if rutting becomes excessive, per clause H-017. Falling, yarding, and timber haul will not be permitted from November 1 to April 30, nor on weekends, or state recognized holidays, unless authority to do so is granted, in writing, by the Contract Administrator. If permission is granted to operate from November 1 to April 30, preventative measures may be required to protect water, soil, roads and other forest assets. ROADS: 57.69 stations of optional construction. 947.98 stations of required pre-haul maintenance. 585.44 stations of required post-haul maintenance. 17.83 stations of abandonment, if constructed. Purchaser maintenance on the 5516, 5516 Connector, 5516-13, 5516-18, 5516-19, 5516-20, and 5516-21 roads and Spurs 200 and 300. Designated maintenance on all other roads used. Rock for this proposal can be obtained from the State owned Tsuga Rock Pit at no cost to the Purchaser or any commercial rock source at the Purchaser's expense. Operation of road construction equipment and rock haul will not be permitted from November 1 to April 30, nor on weekends, or state recognized holidays, unless authority to do so is granted, in writing, by the Contract Administrator. If permission is granted to operate from November 1 to April 30, the Purchaser may be required to provide a maintenance plan per Road Plan clause 1-26. ACREAGE DETERMINATION CRUISE METHOD: Xxxxx #0, #0, and #3 acreage was determined by traversing boundaries by GPS. Unit #4 acreage was determined by traversing boundaries by GPS and a field measurement. Right of way acreage was determined by a field measurement. Traverse GPS data files are available upon request by emailing xxxxxx.xxxxxxxxxx@xxx.xx.xxx. See cruise narrative for cruise method. FEES: $104,051.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price. SPECIAL REMARKS: To access this timber sale you must go through the City of Tacoma's gate on the Headworks Road. All entrants must check in and out with the gate attendant at the Headworks Gate, show a copy of the timber sale prospectus, show valid driver's license and proof of ve...
HARVEST METHOD. Cable, Cable-Assist, Shovel, and Track skidder. Harvesting activities are estimated to be 65 percent ground based yarding and 35 percent cable yarding. Ground based equipment is restricted to slopes of 45 percent and less, and shall operate only during dry soil conditions. Self-Leveling ground based yarding equipment will not be permitted on sustained slopes over 55 percent. Cable assist operations will not be permitted on slopes over 75 percent. 6 Wheeled skidder with tracks similar to ECO-TRACKS™, will not be permitted on sustained slopes over 40 percent. See Clause H-140 for further harvest requirements.
Time is Money Join Law Insider Premium to draft better contracts faster.