Common use of HARVEST METHOD Clause in Contracts

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions); shovel or xxxxxx-xxxxxxx on sustained slopes 35% or less. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 stations of required construction. 65.29 stations of optional construction. 121.06 stations of required prehaul maintenance. Rock may be obtained from the following source on State land at no charge to the Purchaser: Bummer Pit at station 393+31 of the SU-ML Road. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 cubic yards of riprap and 10,865 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presented. FEES: $88,111.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.

Appears in 1 contract

Samples: Otherwise Noted

AutoNDA by SimpleDocs

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions)Cable; shovel cable or shovel, rubber-tired skidder, tracked skidder, forward, and/or dozer on sustained slopes 40% or less; a xxxxxx-xxxxxxx may be utilized on sustained slopes 3540% or less. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-GROUND- BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 71.73 stations of required construction. 65.29 82.08 stations of optional construction. 121.06 70.19 stations of required prehaul maintenanceroad to be abandoned if built. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer WH-0802-01 Proposed Gravel Pit at station 3933+31 11 of the SUWH-0802 Road (Pit run rock, Rip Rap). SR-17 Gravel Pit at MP 1.7 of the SR-ML RoadRoad (Pit run rock, Rip Rap). WH-13 Potential Gravel Pit at station 68+33 of the XX-XX Road (Smaller dimension pit run rock). Development of new and/or existing rock source source(s) will involve drillingclearing, shooting, stripping and processing rock to generate riprap and 3-inch-minus ballast pit run rock. An estimated total quantity of rock needed for this proposal: 343 5 cubic yards of riprap and 10,865 2,111x cubic yards of ballast pit run rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traversetraverse for units and length x width calculation for right-of- way. Cruise was conducted via variable and fixed plot sample type, as well as 100% for a portion of the right-of-way. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedrequest. FEES: $88,111.00 58,788.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price. SPECIAL REMARKS: 1. HQ DF noted within the sale area. See cruise for further details (approximately 49 mbf of the above listed DF 2S is deemed high quality by the Department).

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR or tethered equipment (See H-141 below for restrictions); shovel shovel, and/or “6-wheeled rubber tired skidders with over-the-tire tracks spanning both sets of rear tires” on sustained slopes 40% or less (See below for restrictions); self-leveling equipment on sustained slopes 55% or less; also, a xxxxxx-xxxxxxx may be utilized on sustained slopes 3540% or less. Purchaser must obtain prior written approval from the Contract Administrator for areas as to where to utilize tethered equipment prior to use. Purchaser must obtain prior written approval from the Contract Administrator for areas as to where to utilize rubber-tired skidder equipment prior to use. Skidders shall be limited to preapproved skid trails only. If ground disturbance is causing excessive damage, as determined by the Contract Administrator, skidders will no longer be authorized. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 118.45 stations of required construction. 65.29 6.10 stations of optional construction. 121.06 108.85 stations of required prehaul maintenance. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer Pit at station 393+31 30 of the SU-ML Road. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 383 cubic yards of riprap and 10,865 14,320 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request request, and on the DNR website after the BNR meeting in which the sale is presented. FEES: $88,111.00 125,222.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price. SPECIAL REMARKS: 1. Redcedar distribution poles were noted within the sale area.

Appears in 1 contract

Samples: Harvest Area Approx

HARVEST METHOD. Cable OR tethered Cable; cable or shovel on sustained slopes 35% or less; a tracked skidder may be used only on the designated equipment (See H-141 for restrictions)trail in Unit #2; shovel or a xxxxxx-xxxxxxx may be utilized on sustained slopes 35% or less. Falling and yarding in the RMZ/WMZ thinning areas shall not be permitted during the bark slippage season unless authorized in writing by the Contract Administrator. This season is estimated to run from April 1 to July 15, but may vary dependent on weather conditions. If permission is granted to operate during the bark slippage season the Purchaser shall be required to provide a plan outlining mitigation measures.Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO April 30 BY GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosionEQUIPMENT. This will not be waived. ROADS: 43.50 38.66 stations of required construction. 65.29 30.88 stations of optional construction. 121.06 30.88 stations of road to be abandoned if built. 170.11 stations of required prehaul pre-haul maintenance. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer FG‐01 Gravel Pit at station 3936+31 16 of the SU-ML RoadFG‐ML Road for Pit run rock and Rip Rap. Proposed BW‐1503 Gravel Pit at station 1+53 of the BW‐1503 Road Pit run rock and Rip Rap Development of proposed and existing rock source source(s) will involve clearing, stripping, drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast pit run rock. An estimated total quantity of rock needed for this proposal: 343 129 cubic yards of riprap and 10,865 4,596 cubic yards of ballast pit run rock. Includes purchase and installation of 60” x 54’ culvertAdditional restrictions apply, see Remarks section below. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 April 30 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traversetraverse for units and length x width calculation for right-of- way. Cruise was conducted via variable and fixed plot sample type, as well as 1/10 acre fixed plot for the thinning area, and 100% sample in the right-of-way. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedrequest. FEES: N/A $88,111.00 89,602.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.

Appears in 1 contract

Samples: Unit 3a

HARVEST METHOD. Cable OR or tethered equipment (See H-141 see below for restrictions); shovel or xxxxxx-xxxxxxx on sustained slopes 35% or less. Self-leveling shovel or xxxxxx-xxxxxxx (see below for restrictions) on sustained slopes 55% or less. Purchaser must obtain prior written approval from the Contract Administrator for areas as to where to utilize self-leveling and/or tethered equipment prior to use. If ground disturbance is causing excessive damage, as determined by the Contract Administrator, this equipment will no longer be authorized. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 5.92 stations of required construction. 65.29 3.47 stations of optional construction. 121.06 106.42 stations of required prehaul maintenance. 3.47 stations of abandonment, if built. Rock may be obtained from the following source on State land at no charge to the Purchaser: Bummer Xxxxx Rock Pit at station 393106+31 42 of the SU-ML RoadXX-00 Xxxx. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 36 cubic yards of riprap and 10,865 676 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presented. FEES: $88,111.00 16,507.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price. SPECIAL REMARKS: 1. HQ DF noted within the sale area. See cruise for further details.

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions)Cable; cable or shovel or xxxxxx-xxxxxxx on sustained slopes 35% or less. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 78.82 stations of required construction. 65.29 33.80 stations of required reconstruction. 91.42 stations of optional construction. 121.06 91.42 stations of required prehaul maintenanceroad to be abandoned if built. Work includes installation of a 78-foot span pre-constructed modular type painted steel bridge and pre-cast concrete footings, installation of a 50-foot span wood deck pre-constructed modular type painted steel bridge and pre-cast modular footings, installation of a 50-foot span pre-constructed modular type painted steel bridge and pre-cast concrete footings, installation of a 40-foot span gravel decked log xxxxxxxx bridge, and installation of a 120” galvanized metal culvert. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer MY-0402 Hard Rock Pit at station 3939+31 50 of the SUMY-04 Road. MY-16 Hard Rock Pit at Station 80+40 of the MY-ML Road. MY-2101 Hard Rock Pit at station 1+56 of the MY-21 Road. Development of new and existing rock source sources will involve clearing, stripping, drilling, shooting, and processing rock to generate riprap riprap, shot rock, and 3-inch-minus ballast rockballast. An estimated total quantity of rock needed for this proposal: 343 2,675 cubic yards of riprap riprap, 1,300 cubic yards of shot rock and 10,865 19,150 cubic yards of ballast rock. Includes purchase and installation In addition, acquisition of 60” x 54’ culvert90 cubic yards of 1 ½-inch-minus crushed surfacing rock from a commercial source. Additional restrictions apply, see Remarks section below. Road work construction, road reconstruction, road abandonment, and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. 193.7 acres gross. 4.3 acres deducted for green tree retention clumps and 2.3 acres deducted for existing roads. 187.0 acres net; which is further reduced to 166.2 acres net due to removal of a portion of the proposal for potential reconveyance to the County. Cruise was conducted via revised with new acreages for Xxxx #0, Xxxx #0 and the reconveyance of RW in Unit #1.Cruised using variable plot method. Expansion factor used is 40.00 and fixed plot sample type54.45. See Cruise Narrative for further detailsSighting height is 4.5 feet. A total of 120 plots were taken. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedrequest. FEES: $88,111.00 101,370.25 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price. SPECIAL REMARKS: 1. Trees marked with 2 red paint bands and a yellow “T” represent the last take tree along property line boundaries.

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions)Cable; shovel shovel, “6-wheeled rubber tired skidders with over-the-tire tracks spanning both sets of rear tires” or xxxxxx-xxxxxxx tracked forwarder on sustained slopes 35% or less; self-leveling equipment on sustained slopes 50% or less; tethered xxxxxx-xxxxxxx or tethered processor equipment may be utilized (See below for restrictions) on sustained slopes 80% or less; also, a processor or xxxxxx-xxxxxxx may be utilized on sustained slopes 35% or less. Purchaser must obtain prior written approval from the Contract Administrator for areas as to where to utilize tethered xxxxxx-xxxxxxx or tethered processor equipment prior to use. DRAFT Trees may be felled and pre-bunched by the equipment but must be yarded by cable, if authorized by the Contract Administrator. If ground disturbance is causing excessive damage, as determined by the Contract Administrator, the equipment will no longer be authorized. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 11.44 stations of required construction. 65.29 45.98 stations of optional construction. 121.06 410.41 stations of required prehaul maintenance. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer Big Red Rock Pit at station 3932+31 00 of the SU-ML XX-00 Xxxx. Xxxx’s Bobcat Rock Pit at Station 34+30 of the CSL-19 Road. Development of existing rock source sources will involve drilling, shooting, and processing rock to generate riprap, and 3-inch-minus ballast rock. Also, stockpiles available of riprap and 3-inch-minus ballast rockin both above referenced pits. An estimated total quantity of rock needed for this proposal: 343 305 cubic yards of riprap and 10,865 6,250 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traversefor units and estimate for right-of-way. Cruise was conducted via variable and fixed plot sample type. Cruise acres are based on FMA (Forest Management Activity) acres including leave tree areas. Leave tree volume is not included in the cruise. See Cruise Narrative for further details. Shapefiles of units are available upon request request, and on the DNR website after the BNR meeting in which the sale is presented. FEES: $88,111.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.

Appears in 1 contract

Samples: Sale

HARVEST METHOD. Harvest activities are estimated to be 100 percent ground based harvest. Cable OR and tracked ground based equipment, with cable-tethered equipment (See H-141 for restrictions); shovel or xxxxxx-xxxxxxx on limited to sustained slopes 35% 75 percent or less, self-leveling equipment limited to sustained slopes 65 percent or less, and all other tracked ground based equipment limited to sustained slopes 45 percent or less. Falling Only self-leveling or tethered equipment or cable yarding is permitted where shown on the Timber Sale Map due to sensitive soils. Yarding may be restricted during wet weather if rutting becomes excessive, per clause H-017. Falling, yarding, and Yarding timber haul will not be permitted from November 1 to March 31 April 30, unless authorized authority to do so is granted, in writing writing, by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) Administrator. If permission is granted to reduce soil damage operate from November 1 to April 30, preventative measures may be required to protect water, soil, roads and erosionother forest assets. ROADS: 43.50 stations of required construction. 65.29 29.90 stations of optional construction. 121.06 225.75 stations of required prehaul maintenance. 24.90 stations of abandonment, if constructed. Purchaser maintenance on all roads used. Rock for this proposal may be obtained from the following source on State land owned 5050 Pit at no charge cost to the Purchaser: Bummer Pit at station 393+31 of the SU-ML Road. Development of existing Purchaser or any commercial rock source will involve drilling, shooting, at the Purchaser's expense. Rock source development work in the 5050 Pit is required according to Road Plan clauses 6-10 and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 cubic yards of riprap and 10,865 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert6- 12. Road work construction equipment and the hauling of rock haul will not be permitted from November 1 to March 31 April 30, unless authorized authority to do so is granted, in writing writing, by the Contract Administrator Administrator. If permission is granted to reduce soil damage and siltation. The hauling of forest products will not be permitted operate from November 1 to March 31 unless authorized in writing by April 30, the Contract Administrator to reduce soil damage and siltationPurchaser shall comply with a maintenance plan per Road Plan clause 1-26. ACREAGE DETERMINATION CRUISE METHOD: Acres Acreage was determined by traversing boundaries by GPS. GPS traverse. Cruise was conducted via variable and fixed plot sample typedata files available at DNR's website for Timber Sale Auction Packets. See Cruise Narrative cruise narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedcruise method. FEES: $88,111.00 55,301.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.. SPECIAL REMARKS: There are residual blue painted trees from a previous sale within these units. For this sale, blue paint is to be disregarded. In the VRH unit (Unit #1) leave trees are marked with orange paint or tagged with yellow "Leave Tree Area tags". Xxxxx #0, #0, #0, and #5 are Riparian Management Zone (RMZ) thinning units. Take trees have been 100% marked with one band of pink paint. Trees marked with two bands of red paint and a "S" and trees marked with one band of red paint and a "D" are not to be removed. These are trees identified for snags or down wood to be created by the Purchaser. This sale contains high quality Xxxxxxx fir, see Cruise for details. Purchaser shall cut all vine maple within Unit 1, leaving a xxxxx no more than 12 inches in height. See map for gate locations. Gate keys may be obtained by contacting the South Puget Sound Region Office at 000-000-0000 or by contacting Xxxx Xxxxx at 000-000-0000. T I M B E R S A L E M A P S A L E N A M E : A G R E E M E N T # : PUMPKIN PATCH VRH AND RMZ THIN 30-099018 R E G I O N : C O U N T Y ( S ) : South Puget Sound Region King T O W N S H I P ( S ) : >>

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions)Cable; cable or shovel or xxxxxx-xxxxxxx on sustained slopes 35% or less; a xxxxxx-xxxxxxx may be utilized on sustained slopes 35% or less; tethered/self-leveling equipment may be utilized with prior written approval from the Contract Administrator. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 68.25 stations of required constructionreconstruction. 65.29 stations of optional construction. 121.06 375.77 stations of required prehaul pre-haul maintenance. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer LT-05 Gravel Pit at station 3934+31 27 of the SU-ML RoadXX-00 Xxxx. XX-0000 Xxxxxxxx Pit at station 91+07 of the XX-00 Xxxx. Development of existing rock source sources will involve drilling, shooting, clearing and processing stripping rock to generate riprap and 3-inch-minus ballast jaw run rock. An estimated total quantity of rock needed for this proposal: 343 279 cubic yards of riprap and 10,865 5,615 cubic yards of ballast rock. Includes purchase and installation An existing stockpile of 60” x 54’ culvertriprap is available for use in the XX-0000 Xxxxxxxx Xxx. Road Xxxx work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedrequest. FEES: $88,111.00 42,688.75 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR tethered equipment (See H-141 below for restrictions); shovel shovel, “6-wheeled rubber- tired skidders with over-the-tire tracks spanning both sets of rear tires” (See below for restrictions), tracked skidder or xxxxxxrubber-xxxxxxx tired skidder on sustained slopes 35% or less; self- leveling equipment on sustained slopes 50% or less (See below for restrictions). Prior written approval of the Contract Administrator is required before tethered or self- leveling equipment may be used. If ground disturbance is causing excessive damage, as determined by the Contract Administrator, the use of this equipment will no longer be authorized. Purchaser must obtain prior written approval from the Contract Administrator for areas as to where “6 wheeled rubber tired skidders with over-the-tire tracks spanning both sets of rear tires” can operate. If ground disturbance is causing excessive damage, as determined by the Contract Administrator, the equipment will no longer be authorized. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS Administrator(THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. Additional restrictions apply, see Remarks section below. ROADS: 43.50 56.86 stations of required construction. 65.29 26.14 stations of optional constructionrequired reconstruction. 121.06 238.90 stations of required prehaul maintenance. 14.06 stations of abandonment. Rock may be obtained from the following source on State land at no charge to the Purchaser: Bummer Oceanview Pit at station 3932+31 71 of the SU-ML RoadXX-0000 Xxxx. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap riprap, 2-inch-minus surfacing, and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 180 cubic yards of riprap and 10,865 2,070 cubic yards of surfacing rock and 7,990 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvertAdditional restrictions apply, see Remarks section below. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request request, and on the DNR website after the BNR meeting in which the sale is presented. FEES: $88,111.00 134,810.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions); shovel or xxxxxx-xxxxxxx or tracked based equipment on sustained slopes 3540% or less; self-leveling equipment on sustained slopes up to 55% (See H-141 for restrictions). Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 41.42 stations of required construction. 65.29 38.74 stations of optional construction. 121.06 9.70 stations of optional reconstruction. 71.46 stations of required prehaul maintenance. 232.97 stations of optional prehaul maintenance. 12.20 stations of abandonment, if built. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer St. Xxxxxxx Pit at station 39318+31 79 of the SU-ML MF-25 Road. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap riprap, 2-inch-minus surfacing rock, and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 323 cubic yards of riprap riprap, 1,560 cubic yards of surfacing rock and 10,865 8,966 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via fixed and variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presented. FEES: $88,111.00 72,335.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.

Appears in 1 contract

Samples: All State Unless Otherwise Noted

HARVEST METHOD. Cable OR tethered Cable, Cable-Assist, and Shovel. Harvesting activities are estimated to be 50 percent ground based yarding and 50 percent cable yarding. Ground based equipment (See H-141 for restrictions); shovel or xxxxxx-xxxxxxx is restricted to slopes of 45 percent and less, and shall operate only during dry soil conditions. Self- Leveling ground based yarding equipment will not be permitted on sustained slopes 35% or lessover 60 percent. Falling and Yarding Cable assist operations will not be permitted on slopes over 75 percent. See Clause H-140 for further harvest requirements. ROADS: 29.63 stations of required construction. 25.97 stations of required reconstruction. 17.27 stations of optional construction. 6.80 stations of optional reconstruction. 114.30 stations of required prehaul maintenance. 13.00 stations of abandonment. Rock used in accordance with the quantities on the ROCK LIST may be obtained from any commercial source at the Purchaser's expense. Road construction will not be permitted from November October 1 to March 31 April 30 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosionAdministrator. ROADS: 43.50 stations of required construction. 65.29 stations of optional construction. 121.06 stations of required prehaul maintenance. Rock may be obtained from the following source on State land at no charge to the Purchaser: Bummer Pit at station 393+31 of the SU-ML Road. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 cubic yards of riprap and 10,865 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road All road work and the hauling of rock will not be permitted from November October 1 to March 31 April 30 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltationAdministrator. ACREAGE DETERMINATION CRUISE METHOD: Acres The sale acres were determined by GPS traverseGPS. Cruise The sale area was conducted via cruised using a variable plot cruise method and 1/20th acre fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedplots. FEES: $88,111.00 82,654.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.. SPECIAL REMARKS: This sale contains approximately 49 MBF of 3P DF, 389 MBF SM DF, 468 MBF high quality 2 Saw DF and 6 MBF high quality 3 Saw DF. See Cruise for additional for additional information. Timing restrictions apply in portions of Unit 1 from March 1 to August 31. All trees 60 inches Diameter at Breast Height (DBH) and greater shall not be felled unless for safety reasons. If trees 60 inches DBH or greater needs to be felled for safety reasons, trees will be left where felled. T I M B E R S A L E M A P S A L E N A M E : A G R E E M E N T # : MM MM GOOD 30-104153 R E G I O N : C O U N T Y ( S ) : Pacific Cascade Region Grays Harbor T O W N S H I P ( S ) : T16R6W E L E VAT I O N R G E : 560-880 T R U S T ( S ) : Capitol Grant (7), Charitable/Educational/Penal & Reformatory Instit. (6), Common School and Indemnity (3), State Forest Transfer (1) 0 500 1,000 2,000 3,000 Feet > 123°24'W 123°23.5'W > > > > > > > > > > ) > > > > > > > > > > > > > > > > ! ! > > > > > > > > > > > > > U1 T-5002 ¦ ~ ¦ ~ ~ ~ ~ ~ > \ ¦ ~ ~ T-5200 U3 ROW > ~ ~ > > > > > > > > > ■ > > > T-5000 0.8 ac. T-5290 U2 > T-Line ~ ~ ¦ > ~ ¦ ~ > >> ~ 18 >ac. > ~ > ~ ~ > > > > > > ~ ■%3 > ~ ~ 46°50.5'N T-5000 > > > > > T-5300 > ~ > > k ■%5 > > > ~ > ~ > ~ ~ T-5300A■%3 76 ac. > > ~ ~ o ~ > ~ ~ ~ ~ ¦ ~ ¦ 5 o ■%~¦ ¦ ~ ¦ > ~ ~ ~¦ ~ ¦ k ~ > ~ ¦ > ~ ~ ■% ~ ¦ > ~ > ~ ~ ~ ¦ ~ ~ ¦ ~ ~ ~ ¦ > 5 k ■%5 k■%4 > ~ ¦ > ~ ¦ > > ~ >~ ¦ ~ > > ■%3 > > >> > ~ > > ~ ~ ¦ > > ~ ~ ~ ~ > ~ ~ ~ 46°50.5'N ~ ¦ ~ ~ ¦ > > > T-5200 > \ ~ ~ > ~ ¦ ~ ¦ ■%5 ~ ~ ~ ~ ~ ~ > ¦ ~ ~ o > > ~ ¦ > ~ ~ ~ ~ ~ k ~ ¦ ~ ~ ~ ~ > ~ > ~ ~ > ■%3 > > ~ ¦ ~ ~ > > > ~ ~ ~ ■%3 > > > > > > > ~ > > > ¦ ■%3 >> ~ > > > > > > > ~ > ~ > ~ > > ~ > ¦ ~ ¦ ~ ¦ ~ ¦ ~ ¦ ~ ~ ~ ~ ■%3 ■%4 ~ ~ ~ ¦ ~ ~ > > ~ ~ ~ ~ > ~ ~ ~ > > ~ > ~ ~ ~ x x■%5 > ~ k■% ~ ¦ ¦ ~ > ¦ > > ■%3 > k > ~ > ~ ~ > ~ > k ■%4 ~ ~ > ■%5 ~ ~ ~ o > > > ~ ¦ oo ~ ¦ > ~ ¦ ~ ¦ ~ ~ ¦ ~ ~ ~ ~ ~ ~ ~ ¦ ~ ~ ~ ~ ¦ ~ ¦ ~ ¦ > ■ > ■%5 >k ~ ¦ > ¦ > > > ~ ¦ ¦ ~ ¦ T-5300 ■%5 ~ > > > ~ > > ~ ¦ > ■%5 ~ ¦ > ~ ~ ~ ~ ~ > ~ ~ ¦ ~ ¦ > ■%3 > ~ ~ > ■%3 > > ~ > ~ ~ ~ ~ ~ k > > ■%3 T-5305 > ~ > ~ ~ > ~ > > ~ ¦ T-5300 ABD > > > > > ■ >

Appears in 1 contract

Samples: www.dnr.wa.gov

AutoNDA by SimpleDocs

HARVEST METHOD. Cable OR Cable; cable, shovel, and tracked skidder or rubber tired skidder (See H-141 for restrictions) on sustained slopes 40% or less; self-leveling equipment on sustained slopes 55% or less; tethered equipment may be utilized (See H-141 for restrictions); shovel or also, a xxxxxx-xxxxxxx may be utilized on sustained slopes 3540% or less. , Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 29.25 stations of required construction. 65.29 21.40 stations of optional construction. 121.06 203.69 stations of required prehaul maintenance. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer Steam Donkey Pit at station 3936+31 35 of the SUMI-14 Road for gravel ballast. Christie Pit at Station 181+35 of the CT-ML RoadRoad for riprap, 2-inch minus crushed surfacing rock. Development of existing rock source source(s) will involve drilling, shooting, and processing rock to generate riprap riprap, and 32-inch-minus ballast and processing rock to develop gravel pit run rock. An estimated total quantity of rock needed for this proposal: 343 248 cubic yards of riprap and 10,865 riprap, 2,675 cubic yards of ballast 2-inch-minus crushed rock, and 3,415 cubic yards of gravel pit run rock. Includes purchase and installation In addition, acquisition of 60” x 54’ culvert510 cubic yards of 1-inch-minus crushed rock from a commercial source. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traversetraverse for units and length x width calculation for right-of- way. Cruise was conducted via variable and fixed plot sample type, as well as 1/20 acre fixed plot for right-of-way #1. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedmeeting, via link on DNR www site. FEES: $88,111.00 29,631.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price. SPECIAL REMARKS: 1. A portion of road work is on abandoned grade.

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions)Cable; shovel or xxxxxx-xxxxxxx on sustained slopes 35% or less. ; self-leveling equipment (See H-141 for restrictions) on sustained slopes 55% or less; tethered equipment may be utilized (See H- 141 for restrictions); also, a xxxxxx-xxxxxxx may be utilized on sustained slopes 35% or less, Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-GROUND- BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 27.28 stations of required construction. 65.29 36.50 stations of required reconstruction. 13.17 stations of optional construction. 121.06 6.68 stations of optional reconstruction. 6.68 stations of existing road to be abandoned. 10.11 stations of road to be abandoned if built. 249.98 stations of required prehaul pre-haul maintenance. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer MZ-21 Pit at station 393110+31 95 of the SUMZ-ML Road. WT-14 Pit at Station 82+30 of the XX-XX Road. Development of an existing rock source source(s) will involve clearing, stripping, drilling, shooting, and processing rock to generate riprap riprap, and 34-inch-minus ballast rockballast. An estimated total quantity of rock needed for this proposal: 343 95 cubic yards of riprap riprap, 375 cubic yards of surfacing rock and 10,865 9,535 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traversetraverse for unit and length x width calculation for right-of- way. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedrequest. FEES: $88,111.00 33,103.75 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.. SPECIAL REMARKS: 1. Trees marked with pink paint represent the last take tree on State manage land along property line boundaries. T I M B E R S A LE MAP S A L E N AME: A G R E E M ENT #: T O W N S H IP(S): T R U S T (S): 0 500 1,000 2,000 3,000 Feet 121°55.5'W MENZELWORTHY 30-092535 T30R07E Common School and Indemnity(3) 121°55'W R E G I ON: C O U N T Y(S): E L E VAT I ON RGE: 121°54.5'W Xxxxxxxxx Xxxxxx XXXXXXXXX 000-0000 121°54'W Harvest Area Approximately: 100 Unit 1: 96.9 ROW 1: 0.9 ROW 2: 2.1 48°3.5'N ~ ~

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR tethered equipment Cable; cable, shovel or forwarder on sustained slopes 40% or less; a xxxxxx-xxxxxxx may be utilized on sustained slopes 40% or less; tracked skidder (See H-141 for restrictions); shovel self-leveling equipment or xxxxxx-xxxxxxx tethered equipment on sustained slopes 35less than 55% or less(See H- 141 for restrictions). Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. Additional restrictions apply, see Remarks section below. ROADS: 43.50 27.28 stations of required construction. 65.29 122.53 stations of optional construction. 121.06 98.63 stations of road to be abandoned if built. 304.98 stations of required prehaul pre-haul maintenance. 413.03 stations of optional pre-haul maintenance. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer Red Rider Pit at station 393182+31 04 of the SUWS-ML Road. Dasher Pit at station 31+32 of the XX-00 Xxxx. Section 2 Pit at station 13+89 of the MJ-03 Road. Development of existing rock source sources will involve clearing, stripping, drilling, shooting, and processing rock to generate riprap and 3-riprap, 3- inch-minus ballast and gravel pit run rock. An estimated total quantity of rock needed for this proposal: 343 1,082 cubic yards of riprap and 10,865 riprap, 13,725 cubic yards of ballast rock and 6,420 cubic yards of pit run rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presented. FEES: $88,111.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.

Appears in 1 contract

Samples: All State Unless Otherwise Noted

HARVEST METHOD. Cable OR tethered Cable, Cable-Assist, and Shovel. Harvesting activities are estimated to be 50 percent ground based yarding and 50 percent cable yarding. Ground based equipment (See H-141 for restrictions); shovel or xxxxxx-xxxxxxx is restricted to slopes of 45 percent and less, and shall operate only during dry soil conditions. Self- Leveling ground based yarding equipment will not be permitted on sustained slopes 35% or lessover 60 percent. Falling and Yarding Cable assist operations will not be permitted on slopes over 75 percent. See Clause H-140 for further harvest requirements. ROADS: 29.63 stations of required construction. 25.97 stations of required reconstruction. 17.27 stations of optional construction. 6.80 stations of optional reconstruction. 114.30 stations of required prehaul maintenance. 13.00 stations of abandonment. Rock used in accordance with the quantities on the ROCK LIST may be obtained from any commercial source at the Purchaser's expense. All road work will not be permitted from November October 1 to March 31 April 30 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 stations of required construction. 65.29 stations of optional construction. 121.06 stations of required prehaul maintenance. Rock may be obtained from the following source on State land at no charge to the Purchaser: Bummer Pit at station 393+31 of the SU-ML Road. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 cubic yards of riprap and 10,865 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltationAdministrator. ACREAGE DETERMINATION CRUISE METHOD: Acres The sale acres were determined by GPS traverseGPS. Cruise The sale area was conducted via cruised using a variable plot cruise method and 1/20th acre fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presentedplots. FEES: $88,111.00 83,000.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.. DRAFT SPECIAL REMARKS: This sale contains approximately 49 MBF of 3P DF, 389 MBF SM DF, 468 MBF high quality 2 Saw DF and 6 MBF high quality 3 Saw DF. See Cruise for additional for additional information. Timing restrictions apply in portions of Unit 1 from March 1 to August 31. All trees 60 inches Diameter at Breast Height (DBH) and greater shall not be felled unless for safety reasons. If trees 60 inches DBH or greater needs to be felled for safety reasons, trees will be left where felled. T I M B E R S A L E M A P S A L E N A M E : A G R E E M E N T # : MM MM GOOD 30-104153 R E G I O N : C O U N T Y ( S ) : Pacific Cascade Region Grays Harbor T O W N S H I P ( S ) : T16R6W E L E VAT I O N R G E : 560-880 T R U S T ( S ) : Capitol Grant (7), Charitable/Educational/Penal & Reformatory Instit. (6), Common School and Indemnity (3), State Forest Transfer (1) 0 500 1,000 2,000 3,000 Feet > 123°24'W 123°23.5'W > > > > > > > > > > ) > > > > > > > > > > > > > > > > ! ! > > > > > > > > > > > > > U1 T-5002 ¦ ~ ¦ ~ ~ ~ ~ ~ > \ ¦ ~ ~ T-5200 U3 ROW > ~ ~ > > > > > > > > > FT ■ > > > T-5000

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR tethered equipment (See H-141 for restrictions)Cable; shovel or xxxxxx-xxxxxxx forwarder on sustained slopes 35% or less; tracked skidder on sustained slopes 25% or less; self-leveling equipment (See below for restrictions) on sustained slopes 50% or less; tethered equipment may be utilized (See below for restrictions); also, a xxxxxx-xxxxxxx may be utilized on sustained slopes 35% or less. Purchaser must obtain prior written approval from the Contract Administrator for areas as to where to utilize tethered equipment or self-leveling equipment prior to use. If ground disturbance is causing excessive damage, as determined by the Contract Administrator, this equipment will no longer be authorized. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 stations of required construction. 65.29 58.08 stations of optional construction. 121.06 33.73 stations of optional reconstruction. 495.30 stations of required prehaul maintenance. 5.48 stations of abandonment. 42.29 stations of abandonment, if built. Rock may be obtained from the following source source(s) on State land at no charge to the Purchaser: Bummer West Bear Pit at station 39310+31 03 of the SUBR-3802-ML 05 Road. Bald View Pit at Station 43+83 of the BR-82 Road. Development of new and existing rock source source(s) will involve clearing, stripping, drilling, shooting, and processing rock to generate riprap riprap, and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 178 cubic yards of riprap and 10,865 7,705 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to Administratorto reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traversetraverse for units and GPS/GIS for right-of-way. Cruise was conducted via variable plot sample type and fixed plot sample typeplot. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presented. FEES: $88,111.00 105,808.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price. SPECIAL REMARKS: 1. Trees marked with red paint represent the last take tree along property line boundaries.

Appears in 1 contract

Samples: Unit 2c

HARVEST METHOD. Cable OR tethered Downhill Cable, Uphill Cable, Shovel, Xxxxxx-Xxxxxxx, Forwarder, or Skidder. Harvesting activities are estimated to be 3% downhill cable yarding, 13% ground harvest, and 84% uphill cable yarding. Ground harvest equipment (See H-141 for restrictions); shovel or xxxxxx-xxxxxxx on sustained shall be restricted to slopes of 35% or and less, and only occur during dry soil conditions. Falling See Clause H-140 for further harvest requirements. A detailed felling and Yarding yarding plan shall be required prior to any harvest activities and approved in writing by the Contract Administrator. Harvest activities, including landing, road reconstruction and construction, felling, skidding, yarding, and rehabilitation will not be permitted from November 1 to March 31 unless authorized 1st through May 31st in writing by summer only units, which are the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage south part of Xxxx 0, all of Unit 3, and erosionthe southern half of Unit 4. Harvest operations must begin 2 hours after sunrise and end 2 hours before sunset for the summer only portion of unit 2 and all of unit 3 from April 1st through September 23rd. ROADS: 43.50 80+87 stations of required temporary new construction. 65.29 75+12 stations of optional constructionreconstruction. 121.06 417+16 stations of required prehaul pre-haul maintenance. Rock may be obtained from the following source on State land at no charge to the Purchaser: Bummer Pit at station 393+31 of the SU-ML Road. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 cubic yards of riprap and 10,865 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvert. Road All road work and the hauling of rock will not be permitted from November 1 1st to March 31 May 30th unless a Wet Weather Agreement is authorized in writing every year by the Contract Administrator to reduce soil damage and siltationAdministrator. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltationRock pit expansion work has no timing restrictions. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via 371 harvestable acres, 339 acres of variable density thinning and fixed 32 acres of gaps. Cruised using variable plot sample typemethod. Expansion factors of 40. 46.94, 54.44 used in all units, see cruise. Sighting height was 4.5 feet. A total of 243 plots were taken. See Cruise Narrative cruise narrative for further details. DRAFT Shapefiles of units are available upon request after request. GOOD NEIGHBOR AUTHORITY DRIVING MAP‌ 0000000 Rd 2900000 Xx Xxxxxx Ranch Rd SALE NAME: BONIDU AGREEMENT #: 36-103532 NATIONAL FOREST: OLYMPIC COUNTY: CLALLAM Directions: From Forks, drive North 20 miles on HWY 101; turn right onto Xxxxxx Ranch Rd. From the BNR meeting in which HWY 101 / Xxxxxx Ranch Rd junction: Grindstone Pit: Follow Xxxxxx Ranch Rd for 2.7 mi; turn left on the sale is presented. FEES: $88,111.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition 2923070 Rd and continue for 0.1 mi to the bid priceGrindstone Pit entrance on the left.

Appears in 1 contract

Samples: www.dnr.wa.gov

HARVEST METHOD. Cable OR or tethered equipment (See H-141 for restrictions)equipment; shovel or shovel, xxxxxx-xxxxxxx or “6-wheeled rubber-tired skidders with over-the-tire tracks spanning both sets of rear tires” (See below for restrictions) on sustained slopes 3555% or less. Purchaser must obtain prior written approval from the Contract Administrator for areas as to where to utilize “6-wheeled rubber-tired skidders with over-the-tire tracks spanning both sets of rear tires” and/or tethered equipment prior to use. If ground disturbance is causing excessive damage, as determined by the Contract Administrator, this equipment will no longer be authorized. Falling and Yarding will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator (THIS PERTAINS TO GROUND-BASED EQUIPMENT ONLY) to reduce soil damage and erosion. ROADS: 43.50 10.57 stations of required construction. 65.29 1.00 stations of optional constructionrequired reconstruction. 121.06 262.74 stations of required prehaul maintenance. Rock may be obtained from the following source on State land at no charge to the Purchaser: Bummer XxXxx Pit at station 39322+31 50 of the SU-ML RoadXX-0000 Xxxx. Development of existing rock source will involve drilling, shooting, and processing rock to generate riprap and 3-inch-minus ballast rock. An estimated total quantity of rock needed for this proposal: 343 25 cubic yards of riprap and 10,865 1,600 cubic yards of ballast rock. Includes purchase and installation of 60” x 54’ culvertAdditional restrictions apply, see Remarks section below. Road work and the hauling of rock will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. The hauling of forest products will not be permitted from November 1 to March 31 unless authorized in writing by the Contract Administrator to reduce soil damage and siltation. ACREAGE DETERMINATION CRUISE METHOD: Acres determined by GPS traverse. Cruise was conducted via variable and fixed plot sample type. See Cruise Narrative for further details. Shapefiles of units are available upon request after the BNR meeting in which the sale is presented. FEES: $88,111.00 26,911.00 is due on day of sale. $9.00 per MBF is due upon removal. These are in addition to the bid price.

Appears in 1 contract

Samples: Otherwise Noted

Time is Money Join Law Insider Premium to draft better contracts faster.