EMPTY STORAGE Sample Clauses

EMPTY STORAGE. Empty container labels will be availble at the show site service center. Affixing appropriate empty container labels is the sole responsibility of the Exhibitor or his representative’s. All pre-existing labels must be removed. TEG assumes no responsibility for error in the above procedures; removal of containers with old empty labels and without The Expo Group’s labels; or improper information on empty labels. TEG ASSUMES NO LIABILITY FOR LOSS OR DAMAGE TO GOODS OR CRATES, OR THE CONTENTS THEREIN, WHILE THE SAME ARE IN EMPTY CONTAINER STORAGE. Discount Deadline: August 23, 2021 2.5. INBOUND/OUTBOUND SHIPMENTS/UNATTENDED GOODS: There may be a lapse of time between the delivery of shipment(s) to the booth and the arrival of Exhibitor, or a lapse of time between the completion of packing and the actual pickup of materials from the booths for loading onto a carrier and during such times, Exhibitor materials will be left unattended. TEG assumes no liability for loss or damage to unattended Goods received at Show Site at any time from the point of receipt of inbound Goods until the loading of the outbound Goods, including the entire term of the respective show or exhibition. EXHIBITOR is responsible for insuring its own Goods for any and all risk of loss. TEG recommends the hiring of security services from Facility or Show Management. Acceptance of Bills-of-Lading by The Expo Group freight desk does not represent acceptance of counts on the bill. All outgoing freight must be counted by designated carrier at the loading dock. The Carrier is responsible for notifying TEG of any discrepancies. All MHA’s submitted to TEG by Exhibitor will be checked at the time of pickup from the booth and corrections will be made where discrepancies exist between the quantities of items on any form submitted to TEG and the actual count of such items in the booth at the time of pickup. TEG is not responsible for any wait time or other charges including business center charges arising from delivery or pickup of Exhibitor’s materials.
AutoNDA by SimpleDocs
EMPTY STORAGE. AGS assumes no liability for loss or damage to Goods or crates, or the contents therein, while containers are in empty storage. It is Customer’s sole responsibility to affix the appropriate labels available at the AGS Service Center for empty container storage, and ensure that any pre-existing empty labels are removed.

Related to EMPTY STORAGE

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Transport 6.1.1 BellSouth shall provide nondiscriminatory access, in accordance with FCC Rules 51.311, 51.319, and Section 251(c)(3) of the Act to interoffice transmission facilities described in this Section 6 on an unbundled basis to EZ Phone for the provision of a qualifying service, as set forth herein.

  • Horizontal Movement The Board encourages all unit members to improve their skills through advanced training and, as an inducement thereto, provides extra compensation for those who do so successfully. The Board delegates to the Superintendent the responsibility for assuring that unit members comply with the following regulations when claiming credit for advanced studies.

  • Containers The marine and intermodal cargo containers either owned or leased by the Borrower and employed by the Borrower in the conduct of its business, including, without limitation, refrigerated, dry van, tank, open top and flat rack containers and refrigeration units and generator sets associated therewith, but excluding any chassis for such containers.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • SUBLOOPS 45.1. Sprint will offer unbundled access to copper subloops and subloops for access to multiunit premises wiring. Sprint will consider all requests for access to subloops through the ICB process due to the wide variety of interconnections available and the lack of standards. A written response will be provided to CLEC covering the interconnection time intervals, prices and other information based on the ICB process as set forth in this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.