Detailed Requirement, Tasks and responsibilities Sample Clauses

Detailed Requirement, Tasks and responsibilities. Lay blockwork foundations to dpc Build honeycomb sleeper walls (suspended timber floors only) Build in below-ground drainage exit of lintels Build in cranked ventilators for beam and block floors, or airbricks and cavity sleeves Bed dpc Bed plates (timber suspended floors only) Position floor beams and lay infill blocks Brush grout flooring Build superstructure brickwork and blockwork Install cavity insulation as work progresses Install cavity closers Create openings for windows and doors Fit windows and door frames if appropriate Build in meter boxes Bed lintels Lay pad stones Position steel joists and beams Lay first floor beams and infill with blocks Install cavity trays where necessary Bed wall plate Build up xxxxx ends Build chimney through roof Build internal brick features and fireplaces Point up flashings and trays Fill putlock holes Build feature xxxxxxx to gardens Masonry alterations, making good UPVC Door and wall instalaltions SEAP security wall installations; both heavy and lightweight Skills transfer to FCO Services staff The contractor will preferably also be experienced in: - Installation of security doors and grilles involving masonry alterations, making good and redecorating ensuring security standards are met. - 1st fix joinery - Suspended ceiling installation - Laying solid floors - Wall tiling - UPVC Door and wall installations - Carpet tile installation - Airlock and security counter installations - General plumbing skills - Security Filiming - Skills transfer to FCO Services staff
AutoNDA by SimpleDocs
Detailed Requirement, Tasks and responsibilities. The contractor role is responsible for:  Installation of air conditioning and ventiliation systems for specialised overseas activities. From new split/VRV systems, to major modifications, to installations using screened enclosures.  Indepth knowledge of manufacture specific parts and components.  Working as part of a team of installers.  Responsible for installation of VRV/split systems.  Responsible for commissioning and testing of split air conditioning or ventilation systems at customer sites overseas and in UK.  Maintenance support for air conditioning or ventilation installations overseas and in UK.  Completing air-conditioning or ventilation reports, and when required full survey reports for all installations undertaken.  Skills transfer to FCO Services staff
Detailed Requirement, Tasks and responsibilities. The contractor will be responsible for:  The manufacture of components from engineering drawingsTo advise customers on the suitability of proposed mechanical solutions or design amendments.  The selection of appropriate materials and manufacturing techniques to manufacture specified components.  Working in accordance with H&S regulations and FCO Services policies and procedures as applicable and in such a way as doesn’t present a danger to themselves or others.  Safety checks and general cleaning and maintenance of workshop machinery and facilities.  Assisting with stock control and inventory of tools and materials.  Assisting with handling and storage of materials and the handling, packing and delivery of manufactured items.  Skills transfer to FCO Services staff The contractor will report to the Project Manager responsible for delivery or the team leader at site.
Detailed Requirement, Tasks and responsibilities. Tack ceilings with plasterboard or gypsum fibreboard Fix all beading and lathing Float and set all masonry walls Dry-line walls with plasterboard or gypsum fibreboard Tape and joint plasterboard walls, or skim coat all dry-lined walls Tape and joint ceiling boards Skim coat ceilings Fix mouldings and coving Render external walls Screed floors The contractor will preferably also be experienced in: - Installation of security doors and grilles involving masonry alterations, making good and redecorating ensuring security standards are met. - 1st fix joinery - Suspended ceiling installation - Laying solid floors - Wall tiling - UPVC Door and wall installations - Carpet tile installation - Airlock and security counter installations - General plumbing skills - Security Filiming - General building work - Skills transfer to FCO Services staff 5.3 Skills required Requirements Mandatory / Preferable Relevant Qualification to NVQ 2 & 3, City & Guilds Or who has been trained by the Contractor and who the Contractor verifies and warrants the required standard is met. Mandatory To have completed a recognized and relevant apprenticeship in required trades for the assignment. Mandatory Minimum of 3 years relevant experience in SEAP security wall construction; both heavy and lightweight. Mandatory Minimum of 3 years relevant experience in security door installation. Mandatory Good interpersonal, team working and problem solving skills Mandatory Good report writing skills. Mandatory Working knowledge of UK Building Regulations Mandatory CSCS Card holder Mandatory The applicant must be a British Citizen Mandatory Current UK Government Security Clearance to ‘Security Cleared’ (SC) level. Mandatory Current UK Government Security Clearance to ‘Developed Vetting’ (DV) level. Preferable Experience of working in HM Government secure environments Preferable Experience of international installations Preferable Competent in all aspects of joinery and building materials usage in different climatic conditions. Preferable

Related to Detailed Requirement, Tasks and responsibilities

  • SERVICES AND RESPONSIBILITIES 2.1 Contractor hereby agrees to perform the services described and for the fee set forth in the Scope of Work. The Contractor shall be solely responsible for the satisfactory and complete execution of the Scope Work. The Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, utilities, transportation and other facilities and services necessary for the proper execution and completion of the Scope of Work. The Scope of Work shall generally be performed at the direction of the NMCRA and completed and completed within that certain number of days from the issuance of a Work Order by the NMCRA to the Contractor (the “Term”). Time is of the essence in the performance of all obligations within the Term. Final Completion of the Scope of Work shall be completed prior to the expiration of the Term and the failure of the Contractor to do so shall be a material default under this Agreement. “

  • RESTRICTIONS AND RESPONSIBILITIES 2.1 Customer will not, directly or indirectly: reverse engineer, decompile, disassemble or otherwise attempt to discover the source code, object code or underlying structure, ideas, know-how or algorithms relevant to the Services or any software, documentation or data related to the Services (“Software”); modify, translate, or create derivative works based on the Services or any Software (except to the extent expressly permitted by Company or authorized within the Services); use the Services or any Software for timesharing or service bureau purposes or otherwise for the benefit of a third; or remove any proprietary notices or labels.

  • SCOPE OF WORK AND RESPONSIBILITIES 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Xxxxxxxxx Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), as such specifications shall be modified as a result of the Interconnection Customer’s post Facilities SERVICE AGREEMENT NO. 2557 Study modifications to the Interconnection Customer’s Interconnection Facilities, and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with the Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The metering of any redundant or standby station service provisions at the Xxxxxxxxx Solar Collector Substation shall be added in accordance with the Connecting Transmission Owner’s retail tariff, P.S.C. No. 220, and the Connecting Transmission Owner’s ESB 750. As per the Project Specific Specifications, the Interconnection Customer will install the RTU provided by Connecting Transmission Owner in accordance with Connecting Transmission Owner’s ESBs, indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. (Note: If no indoor facility is available, then installation of the RTU and revenue metering equipment in a dedicated, weatherproof, heated cubicle (accessible only to Connecting Transmission Owner) is acceptable.) For the revenue metering, the Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications, ESB 752 and ESB 750. The Interconnection Customer shall mount the revenue metering CT/PT units, make grounding connections, and complete all primary wiring. The Interconnection Customer shall install the meter socket enclosure near the Connecting Transmission Owner’s RTU in accordance with the Project Specific Specifications. Additional right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 301 Tap and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the Line 301 Tap line, access roads to/from the Line 301 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is responsible for all permitting. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of the Connecting Transmission Owner’s Interconnection Facilities.

  • Roles and Responsibilities 1. The Donor States shall make funds available in support of eligible programmes proposed by the Beneficiary State and agreed on by the Financial Mechanism Committee within the priority sectors listed in Article 3.1 of Protocol 38c and the programme areas listed in the Annex to Protocol 38c. The Donor States and the Beneficiary State shall cooperate on the preparation of concept notes defining the scope and planned results for each programme.

  • Shared Responsibilities 2.2.1 The parties will respect and value the diversity of the workplace by helping to prevent and eliminate unlawful discrimination, harassment and bullying. The parties will observe established procedures and consultative processes to help achieve this objective.

  • Obligations and Responsibilities 3.1 General obligations and role of the beneficiaries (including the coordinator). The beneficiaries:

  • Duties and Responsibilities (a) The Auction Agent is acting solely as agent for the Company hereunder and owes no fiduciary duties to any other Person by reason of this Agreement.

  • MANAGEMENT RIGHTS AND RESPONSIBILITIES The Employer through its designated management personnel or agents has the right and responsibility, except as expressly modified by this Agreement, to control, change, and supervise all operations and to direct and assign work to all working forces. Such rights and responsibilities shall include by way of illustration but shall not be limited to: the selection and hiring, training, discipline and discharge, classification, reclassification, layoff, promotion and demotion or transfer of employees; the establishment of work schedules; the allocation of all financial and other resources; the control and regulation of the use of all equipment and other property of the Employer. The Employer shall determine the methods, technological means and qualifications of personnel by and for which operations are to be carried out. The Employer shall take whatever action as may be necessary to carry out its rights in any emergency situation. Application of this Article shall not preclude the use of the grievance procedure as established in this Agreement.

  • Rights and Responsibilities This Agreement is our standard service agreement. Under this Agreement, we agree to provide and xxxx for Service, and you agree to use and pay for Service, as provided herein and in our other applicable Terms of Service. Our rights and responsibilities, and your rights and responsibilities, are as set forth in this Agreement and our other applicable Terms of Service.

  • Specific Responsibilities In addition to its overall responsibility for monitoring and providing a forum to discuss and coordinate the Parties’ activities under this Agreement, the JSC shall in particular:

Time is Money Join Law Insider Premium to draft better contracts faster.