Definitive Engineering Study (EDI) Sample Clauses

Definitive Engineering Study (EDI). It is the document that contains the necessary and sufficient information to allow the execution and supervision of the Works, as well as the implementation of the equipment and furniture. It is prepared by the CONCESSIONAIRE, with the GRANTOR's conformity, after the Supervisor's opinion, and it shall contain the Project development at a definitive level, in accordance with Annex 10 and the Technical Proposal of the Awardee in Annex 17. It is binding for the Construction Period.
AutoNDA by SimpleDocs
Definitive Engineering Study (EDI). The CONCESSIONAIRE shall prepare the EDI which shall be approved by the GRANTOR, prior OSITRAN’s opinion. The EDI shall be prepared based on the Technical Proposal contained in Annex 12 and the Minimum Technical Requirements set out in Annex 8 and the guidelines included in Annex 21 in this Contract. The CONCESSIONAIRE shall submit the EDIs t o t h e g r a n t o r w i t h a c o p y t o O S I T R A N not later than two hundred forty (240) Calendar Days as from the Closing Date for proper assessment and review. Once OSITRAN has reviewed the EDI, the EDI shall be submitted to the GRANTOR for its corresponding evaluation. XXXXXXX will establish a period of thirty (30) days after the EDI was received to make an opinion on it. The GRANTOR will have no more than fifteen (15) days to make observations regarding the EDI or to approve it, from the date OSITRAN’s opinion was received. Such observations, if it is the case, must be forwarded to the CONCESSIONAIRE with a copy to OSITRAN. If there are any observations on the EDI, the CONCESSIONAIRE shall have a period given by the GRANTOR to rectify them. This period shall be computed from the date on which the observations were notified. .The correction of the observations shall be reported to the CONCESSIONAIRE with a copy to OSITRAN. The OSITRAN have a maximum term of ten (10) days of receiving the rectification for to approve its opinion. Also, the GRANTOR shall have ten (10) Days of receipt of the opinion of OSITRAN to issue its approval, if applicable. In the assumption that, once the EDI is approved the CONCESSIONAIRE proposes a modification to the same, this should be submitted duly supported to the GRANTOR and to the OSITRAN. This latter shall have a maximum term of fifteen (15) days of reception of the EDI to issue its opinion, and should be sent to the GRANTOR for the corresponding assessment. The GRANTOR shall have the same term to issue its pronouncement, since the opinion reception of OSITRAN.

Related to Definitive Engineering Study (EDI)

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Feasibility Study Buyer will, at Buyer's expense and within ____ days from Effective Date ("Feasibility Study Period"), determine whether the Property is suitable, in Buyer's sole and absolute discretion, for ___________________ use. During the Feasibility Study Period, Buyer may conduct a Phase I environmental assessment and any other tests, analyses, surveys and investigations ("Inspections") that Buyer deems necessary to determine to Buyer's satisfaction the Property's engineering, architectural and environmental properties; zoning and zoning restrictions; subdivision statutes; soil and grade; availability of access public roads, water, and other utilities; consistency with local, state and regional growth management plans, availability of permits, government approvals, and licenses; and other inspections that Buyer deems appropriate to determine the Property's suitability for the Buyer's intended use. If the Property must be rezoned, Buyer will obtain the rezoning from the appropriatx xxxernment agencies. Seller will sign all documents Buyer is required to file in connection with development or rezoning approvals. Seller gives Buyer, its agents, contractors and assigns, the right to enter the Property at any time during the Feasibility Study Period for the purpose of conducting inspections; provided, however, that Buyer, its agents, contractors and assigns enter the Property and conduct inspections at their own risk. Buyer will indemnify and hold Seller harmless from xxxxes, damages, costs, claims and expenses of any nature, including attorney's fees, expenses and liability incurred in application for rezoning or related proceedings, and from liability to any person, arising from the conduct of any and all inspections of any work authorized by Buyer. Buyer will not engage in any activity that xxxxx result in a construction lien being filed against the Property without Seller's prior written consent. If this transaction does not close, Buyer will, at Buyer's expense, (1) repair all damages to the Property resulting from the Inspections and return the Property to the condition it was in prior to conduct of the Inspections, and (2) release to Seller all reports and other work generated as a result of the Inspections. Buyer will deliver written notice to Seller prior to the expiration of the Feasibility Study Period of Buyer's determination of whether or not the Properxx xx acceptable. Buyer's failure to comply with this notice requirement will constitute acceptance of the Property as suitable for Buyer's intended use in its "as is" condition. If the Property is unacceptable to Buyer and written notice of this fact is timely delivered to Seller, this Contract will be deemed terminated as of the day after the Feasibility Study period ends and Buyer's deposit(s) will be returned after Escrow Axxxx receives proper authorization form all interested parties.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Development Schedule The Project shall substantially comply with the specific timetables and triggers for action set forth in Article 5 of this Agreement. The parties acknowledge that, as provided in G.S. 160A-400.25(b), the failure to meet a commencement or completion date shall not, in and of itself, constitute a material breach of this Agreement pursuant to G.S. 160A-400.27 but must be judged based upon the totality of the circumstances.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • System Impact Study An assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.