Costs of Maintenance and Operation Sample Clauses

Costs of Maintenance and Operation. Each of ASTA Medica and BioNumerik will bear its own costs and expenses relating to the maintenance and operation of the Alliance Steering Committee and the Project Team. The members of the Alliance Steering Committee and the Project Team will each serve without any additional compensation.
AutoNDA by SimpleDocs
Costs of Maintenance and Operation. Third, to the extent that Landlord shall maintain and operate the Premises, to pay to itself the reasonable cost and expense of doing so; and
Costs of Maintenance and Operation. The costs of the maintenance and operation of the Paseo Nuevo Parking Facilities, including without limitation, operating expenses, utilities, repairs, insurance, taxes (including any possessory interest taxes attributable thereto but imposed upon the Developer Tract, Macy’s Tract or Nordstrom Tract), security services, replacement costs and any capital reserves, shall be borne solely by the City. In return, the City shall retain all revenue (whether direct or indirect) derived from its operation of the Paseo Nuevo Parking Facilities. Neither the Agency, the Developer, the Majors, nor any of the tenants of the mall stores shall bear any expense for the maintenance or operation of the Paseo Nuevo Parking Facilities, except as otherwise provided in the Parking Agreement. The Agency hereby acknowledges that it has agreed to pay to the City a portion of the annual Parking and Business Improvement Area assessment (PBIA), imposed pursuant to Santa Xxxxxxx Municipal Code, Chapter 4.37, for the Paseo Nuevo Shopping Center, as described in Section 22.5 of the Construction and Reciprocal Easement Agreement (REA) between the Agency, the Developer and the Majors. Said portion of the annual PBIA assessment to be paid by the Agency has been determined for the year to be $58,664.85 This amount is the difference between the maximum contribution ($100,000) required to be paid by Paseo Nuevo Associates, a California limited partnership successor in interests to PNSC, L.P., a California limited partnership and Santa Xxxxxxx Associates (former operators of the Paseo Nuevo Shopping Center), and the total PBIA assessment due ($158,664.85). This amount shall be offset against the benefits to the City of the operation, revenues, and eventual transfer of ownership to the City of both Parking Structures No. 2 and No. 10.

Related to Costs of Maintenance and Operation

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Operation and Maintenance 17.1 O&M obligations of the Concessionaire

  • General Maintenance The LLC will establish and maintain a Capital Account for each Member. A Member’s Capital Account balance (“Capital Account Balance”) will be:

  • Operations and Maintenance Pursuant to Section 10.5 of this Agreement, Developer shall pay the reasonable expenses (including overheads) for the operation, maintenance, repair and replacement of Transmission Owner’s Attachment Facilities and incremental operating and maintenance expenses incurred in association with System Upgrade Facilities, if and to the extent provided for under Attachment S. For Transmission Owner’s Attachment Facilities, such expenses are calculated as follows:

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Project Maintenance The Local Government shall be responsible for maintenance of locally owned roads and locally owned facilities after completion of the work. The State shall be responsible for maintenance of the state highway system after completion of the work if the work was on the state highway system, unless otherwise provided for in existing maintenance agreements with the Local Government.

  • Repair and Maintenance Except in the case of damage to or destruction of the Leased Premises, the Building, the Outside Areas or the Property caused by an act of God or other peril, in which case the provisions of Article 10 shall control, the parties shall have the following obligations and responsibilities with respect to the repair and maintenance of the Leased Premises, the Building, the Outside Areas, and the Property.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • Operating and Maintenance Expenses Subject to the provisions herein addressing the use of facilities by others, and except for operations and maintenance expenses associated with modifications made for providing interconnection or transmission service to a third party and such third party pays for such expenses, the Interconnection Customer shall be responsible for all reasonable expenses including overheads, associated with: (1) owning, operating, maintaining, repairing, and replacing the Interconnection Customer’s Interconnection Facilities; and (2) operation, maintenance, repair and replacement of the Participating TO’s Interconnection Facilities.

  • Emergency Maintenance LightEdge reserves the right to perform emergency Service maintenance as needed outside the Scheduled Maintenance window, in which case LightEdge will make a reasonable effort to notify the Customer if feasible under the circumstances. Any such maintenance will be considered an “Emergency Maintenance”. All Service SLAs will apply during Emergency Maintenance.

Time is Money Join Law Insider Premium to draft better contracts faster.