Compressor Station Test at City Expense Sample Clauses

Compressor Station Test at City Expense. The Cogenerator will provide the City with the available maintenance records of the Compressor Station for the most recent two (2) years to enable to the City to evaluate the Compressor Station’s Reliability, a draft Compressor Station test procedure and a cost estimate within 60 days of the issuance of the Notice to Proceed, as described in Section 3.3.1(D) of the Gas Agreement. The City will return its comments within 30 days of receipt of the draft Compressor Station test procedure and the resolved test procedure will be issued. Upon the mutual agreement of the parties to a final test procedure and associated cost estimate, a purchase requisition from the City will be issued within 60 days thereafter. The test will be performed no later than 60 days after the Cogenerator’s receipt of the City’s purchase order unless there are delays due to parts, weather or necessary authorizations. The City will be allowed to witness all tests and shall be given one week notice of the pending tests. Two flow tests shall be performed at gas flows simulating all NCCF and NCEP engines running simultaneously at full rated output; the first at LFG methane content substantially matching the average Miramar Landfill LFG quality (BTU/ cu ft) for the 12 complete calendar months preceding the City’s authorization of the tests; and a second test simulating the highest expected volume at a simulated methane content of 105 percent of the lowest methane content for any complete calendar month over the last five calendar years prior to the test. Upon the completion of the flow tests, the Cogenerator shall pressure test the 10 inch LFG line from the Compressor Station to the NCCF at the lesser of two times the average working pressure, or the pipeline's design pressure, for four (4) hours. City test costs may include the installation of an additional temporary gas bypass system or equipment, if required, rental or purchase of gas flow meter, leak detection equipment, if needed, etc. The City shall bear all expenses for the location and repair of any leaks. If the Compressor Station is unable to deliver the NCEP Fuel Requirement on the NCEP Commercial Operation Date, the City shall only be obligated to begin paying for such percentage of the City’s Incremental Gas Allocation under Section 3.4 of the NCEP Gas Purchase and Sale Agreement that the Compressor Station is able to deliver, provided, however, that if such inability to deliver the LFG required is caused by the City, the City sh...
AutoNDA by SimpleDocs

Related to Compressor Station Test at City Expense

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • OGS Centralized Contract Terms and Conditions have been renumbered as depicted in the following chart: Current Amended Section Title 4.25 4.26 Severability 4.26 4.27 Entire Agreement

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Network Access Control The VISION Web Site and the Distribution Support Services Web Site (the “DST Web Sites”) are protected through multiple levels of network controls. The first defense is a border router which exists at the boundary between the DST Web Sites and the Internet Service Provider. The border router provides basic protections including anti-spoofing controls. Next is a highly available pair of stateful firewalls that allow only HTTPS traffic destined to the DST Web Sites. The third network control is a highly available pair of load balancers that terminate the HTTPS connections and then forward the traffic on to one of several available web servers. In addition, a second highly available pair of stateful firewalls enforce network controls between the web servers and any back-end application servers. No Internet traffic is allowed directly to the back-end application servers. The DST Web Sites equipment is located and administered at DST’s Winchester data center. Changes to the systems residing on this computer are submitted through the DST change control process. All services and functions within the DST Web Sites are deactivated with the exception of services and functions which support the transfer of files. All ports on the DST Web Sites are disabled, except those ports required to transfer files. All “listeners,” other than listeners required for inbound connections from the load balancers, are deactivated. Directory structures are “hidden” from the user. Services which provide directory information are also deactivated.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.