Compressor Station Sample Clauses

Compressor Station. Each field compression station on a Lateral that is constructed and installed in accordance with a Compressor Station Annex and Section 4.2, including, for this purpose, the field compressor station that is to be constructed and installed at the Sherwood Plant even though it is not on a Lateral.
AutoNDA by SimpleDocs
Compressor Station. At Producing Well Rate
Compressor Station. A tract of land located in the Southeast Quarter (SE/4) of Section Thirty-Six (36), Township Twenty-Three (23), Range Six (6) West, Reno County, more fully described as follows: Beginning on the East line of said SE/4 at a point Three Hundred and Fifty (350) feet North of the Southeast Corner of said SE/4; thence West, parallel to the South line of said SE/4 a distance of Six Hundred and Fifty (650) feet; thence North, parallel to said East line a distance of Two Hundred and Fifty (250) feet; thence East, parallel to said South line a distance of Six Hundred and Fifty (650) feet to said East line; thence South along said East line to the point of beginning. SALINE COUNTY
Compressor Station. A certain gas fired, reciprocating, electric motor driven 7500 horsepower compressor station connecting Company Line No. 1612 to Yaggy Storage Field located on a tract in the Southeast Quarter (SE/4) of Section Twenty-Five (25), Township Twenty-Two (22) South, Range Seven (7) West, Reno County. Natural Gas Storage Field (Yaggy) A certain bedded salt, natural gas storage field, including bedded salt caverns, wellhead facilities, valving and piping, located on tracts in the South One-Half (S/2) of Section Thirty (30), and the Southwest Quarter (SW/4) of Section Twenty-Five (25), all in Township Twenty-Two (22) South, Range Six (6) West, Reno County. FOURTH PIPELINES LOCATED IN THE STATE OF KANSAS Line 1 - Line 1612 A certain sixteen (16) inch steel gas transmission line approximately eleven and seventy-four hundredths (11.74) miles in length commencing at a point of connection with Company Compressor (Xxxxxxxxxx) in the Southeast App. A-6

Related to Compressor Station

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Connecting Transmission Owner’s Attachment Facilities Connecting Transmission Owner shall design, procure, construct, install, own and/or control the Connecting Transmission Owner’s Attachment Facilities described in Appendix A hereto, at the sole expense of the Developer.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Time is Money Join Law Insider Premium to draft better contracts faster.