Phase I Interconnection definition

Phase I Interconnection. Study shall mean the engineering study conducted or caused to be performed by the CAISO, in coordination with the applicable Participating TO(s), that evaluates the impact of the proposed interconnection on the safety and reliability of the Participating TO’s Transmission System and, if applicable, an Affected System. The study shall identify and detail the system impacts that would result if the Generating Facility(ies) were interconnected without identified project modifications or system modifications, as provided in the On-Peak Deliverability Assessment (as defined in the CAISO Tariff), and other potential impacts, including but not limited to those identified in the Scoping Meeting as described in the Large Generator Interconnection Procedures. The study will also identify the approximate total costs, based on per unit costs, of mitigating these impacts, along with an equitable allocation of those costs to Interconnection Customers for their individual Generating Facilities.
Phase I Interconnection. Study shall mean an engineering study for Applicants in the Transmission Cluster Study Process as defined in the WDAT Tariff.
Phase I Interconnection. Study shall mean thean engineering study conducted or caused to be performed by the CAISO, in coordination with the applicable Participating TO(s),by the Distribution Provider, that evaluates the impact of the proposed interconnection on the safety and reliability of the Participating TO’s TransmissionDistribution System, ISO Grid, and, if applicable, an Affected System. The portion of the study required to evaluate the impacts on the ISO Grid will be coordinated with the ISO and will be completed in a manner consistent with the ISO Tariff GIP. The study shall identify and detail the system impacts that would result if the Generating Facility(ies) were interconnected without identified project modifications or system modifications, as provided in the On-Peak Deliverability Assessment (as defined in the CAISO Tariff),or Off-Peak Deliverability Assessment, and other potential impacts, including but not limited to those identified in the Scoping Meeting as described in the Generator Interconnection Procedures.

Examples of Phase I Interconnection in a sentence

  • Phase I Interconnection Study shall mean an engineering study conducted by the Distribution Provider, that evaluates the impact of the proposed interconnection on the safety and reliability of the Distribution System, ISO Grid, and, if applicable, an Affected System.

  • For Interconnection Requests processed under the Cluster Study Process described in the GIDAP, any of the following: the Phase I Interconnection Study conducted or caused to be performed by the CAISO, the reassessment of the Phase I Interconnection Study Base Case conducted or caused to be performed by the CAISO prior to the commencement of the Phase II Interconnection Study, or the Phase II Interconnection Study conducted or caused to be performed by the CAISO, pursuant to the GIDAP.

  • Interconnection Study shall mean any of the following studies: the Phase I Interconnection Study and the Phase II Interconnection Study described in Section 4.5 and Section 4.6 of the GIP.

  • The existing meters located in SELLER's Interconnection Facility (as defined in the Phase I Interconnection Agreement) satisfy the requirements of this Paragraph TWELFTH.

  • During the Term, but not before the Phase II Substation is completed, the parties grant to each other the right to make emergency repairs to or replacements of safety and security devices with the reasonable cost to be borne fifty percent (50%) by Northern, and 50% by the owners of the NIW II Units and the MGE Unit according to their Proportionate Shares, unless otherwise allocated under the Phase I Interconnection Agreement, the Phase II Interconnection Agreement, or other contracts among the parties.

  • Execution Copy TENTH: SELLER and NIAGARA shall install, own and maintain their respective interconnection facilities in accordance with the Phase I Interconnection Agreement and the Phase II Interconnection Agreement.

  • If major Interconnection Customer’s Interconnection Facilities for the Generating Facility have been identified in the Phase I Interconnection Study, such as telecommunications equipment to support a possible Special Protection System (SPS)Remedial Action Scheme, distribution feeders to support back feed, new substation, and/or expanded substation work, permitting and material procurement lead times may result in the need to alter the proposed Commercial Operation Date.

  • Base Case shall mean data including, but not limited to, base power flow, short circuit, and stability data bases, underlying load, generation, and transmission facility assumptions, contingency lists, including relevant special protection systems, and transmission diagrams used to perform Phase I Interconnection and Phase II Interconnection Studies.

  • All Appendices B must be deemed valid within seventy (70) days of the publication of the Phase I Interconnection Study to be included in the Phase II Interconnection Studies.

  • The CAISO will not accept any Interconnection Request transfers after the commencement of the Phase I Interconnection Study.


More Definitions of Phase I Interconnection

Phase I Interconnection. Study shall mean an engineering study conducted by the Distribution Provider, that evaluates the impact of the proposed interconnection on the safety and reliability of the Distribution System, ISO Grid, and, if applicable, an Affected System. The portion of the study required to evaluate the impacts on the ISO Grid will be coordinated with the ISO and will be completed in a manner consistent with the ISO Tariff GIP. The study shall identify and detail the system impacts that would result if the Generating Facility(ies) were interconnected without identified project modifications or system modifications, as provided in the On-Peak Deliverability Assessment or Off-Peak Deliverability Assessment, and other potential impacts, including but not limited to those identified in the Scoping Meeting as described in the GIP. The study will also identify the approximate total costs of mitigating these impacts, along with an equitable allocation of those costs to Interconnection Customers for their individual Generating Facilities.
Phase I Interconnection. Study shall mean an engineering study conducted by the Distribution Provider, that evaluates the impact of the proposed interconnection on the safety and reliability of the Distribution System, ISO Grid, and, if applicable, an Affected System. The portion of the study required to evaluate the impacts on the ISO Grid will be coordinated with the ISO and will be completed in a manner consistent with the ISO Tariff GIPCLGIP. The study shall identify and detail the system impacts that would result if the Generating Facility(ies) were interconnected without identified project modifications or system modifications, as provided in the On-Peak Deliverability Assessment or Off-Peak Deliverability Assessment, and other potential impacts, including but not limited to those identified in the Scoping Meeting as described in the GIPCLGIP. The study will also identify the approximate total costs of mitigating these impacts, along with an equitable allocation of those costs to Interconnection Customers for their individual Generating Facilities.