Spare Parts and Maintenance Materials Sample Clauses

Spare Parts and Maintenance Materials. The Work will include the furnishing of spare parts and maintenance materials to operate and maintain the streetcar system for the initial startup period. The spare parts and maintenance materials will include keys, special tools, and test equipment required to access, start, operate, monitor, maintain, and perform essential repairs needed for the continued operations of the initial phase of the streetcar system, and the hand tools and general equipment identified in Exhibit A-2. Vehicles: (procured by Broward County under separate contract) The Work includes the design, manufacture, delivery, and testing of five (5) streetcar vehicles. The Work also includes the design and integration of all vehicle systems, as defined in the RFP, such that all specified requirements are achieved without conflict or error within or between systems. Each vehicle shall be a double articulated, modern urban streetcar with contemporary styling, with the following characteristics:  At least a three-section vehicle, with the carbody sections configured as A1-C1- B1.  Not less than 50% low floor. Carbody section C1 shall be low floor.  Carbody section C1 shall have at least two double wide doorways per side.  Capable of bi-directional operation, with a fully functional cab at each end. Operating control and performance shall be equal from both cabs.  Designed for single unit operation with provisions for towing a non-operable Vehicle.  Heated and air conditioned consistent with the Fort Lauderdale, Florida climate and the Technical Specifications.  Design shall incorporate the OESS, i.e. a battery and/or capacitor drive system, which shall provide capability for wireless operation in accordance with the Technical Specifications. EXHIBIT A-1
AutoNDA by SimpleDocs

Related to Spare Parts and Maintenance Materials

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • Operating and Maintenance Manuals 58.1 If “as built” Drawings and/or operating and maintenance manuals are required, the Contractor shall supply them by the dates stated in the Contract Data.

  • TECHNICAL SUPPORT AND MAINTENANCE If technical support and maintenance is a part of the Goods that Contractor provides under the Contract, Contractor will use commercially reasonable efforts to respond to the Department in a reasonable time when the Department makes technical support or maintenance requests regarding the Goods.

  • Equipment and Materials Contractor at its sole cost and expense shall provide and furnish all tools, labor, materials, equipment, transportation services and any other items (collectively, "Equipment") which are required or necessary to perform the Services in a manner which is consistent with generally accepted standards of the profession for similar services. Notwithstanding the foregoing, District shall not be responsible for any damages to persons or property as a result of the use, misuse or failure of any Equipment used by Contractor of the Contracted Parties, even if such Equipment is furnished, rented or loaned to Contractor or the Contracted Parties by District. Furthermore, any Equipment or workmanship that does not conform to the regulations of this Agreement may be rejected by District and in such case must be promptly remedied or replaced by Contractor at no additional cost to District and subject to District’s reasonable satisfaction.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Supply and Maintenance of Equipment It is the responsibility of the Employer to furnish and maintain all equipment, machinery and supplies required by employees in the performance of their duties. Employees shall not suffer any loss in salary in the event that they cannot carry out their normal duties by reason of the Employer failing to properly maintain equipment, machinery or supplies or by reason of power failures or other circumstances not attributable to the employees.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

  • Support and Maintenance Services Information about Teradici’s support and maintenance for the Licensed Product may be found at xxxxx://xxxx.xxxxxxxx.xxx.

  • Support and Maintenance Where Licensee purchases support and/or maintenance services, Licensee’s initial support and/or maintenance term will begin upon delivery to Licensee of the Licensed Software and continue for one (1) year thereafter (or the length of the term if less than a year for any subscription/term license) unless otherwise specified in the applicable annual support and/or maintenance agreement, Product Order, or other written agreement executed between Licensor and Licensee. Where Licensee purchases support and/or maintenance for any Licensed Software, Licensee hereby agrees that it shall purchase such support and/or maintenance services for all of Licensee’s licensed units of such Licensed Software product. Support and/or maintenance services provided by Licensor will be subject to Licensor’s then current applicable standard annual support and/or maintenance agreement unless otherwise agreed by the parties in writing.

  • Installation and Maintenance Except for the bi‐directional and production metering equipment owned by the City, all equipment on Customer’s side of the delivery point, including the required disconnect device, shall be provided and maintained in satisfactory operating condition by Customer and shall remain the property and responsibility of the Customer. The City will bear no responsibility for the installation or maintenance of Customer’s equipment or for any damage to property as a result of any failure or malfunction thereof. The City shall not be liable, directly or indirectly for permitting or continuing to allow the interconnection of the Facility or for the acts or omissions of Customer or the failure or malfunction of any equipment of Customer that causes loss or injury, including death, to any party.

Time is Money Join Law Insider Premium to draft better contracts faster.