Dismantled Sample Clauses

Dismantled. The contractor shall treat all materials obtained during dismantling of a structure, Material Govt. excavation of the site for a work, etc. as Corporation’s property and such materials Property shall be disposed off to the best advantage of Corporation according to the instructions in writing issued by the Engineer-in-Charge. CLAUSE 11 Work to be The contractor shall execute the whole and every part of the work in the most executed in substantial and xxxxxxx like manner both as regards materials and otherwise in every accordance respect in strict accordance with the specifications. The contractor shall also conform with exactly, fully and faithfully to the design, drawings and instructions in writing in specifications, respect of the work signed by the Engineer-in-Charge and the contractor shall be drawings, furnished free of charge one copy of the contract documents together with orders etc. specifications, designs, drawings and instructions as are not included in the standard specifications of Central Public Works Department specified in Schedule ‘F’ or in any Bureau of Indian Standard or any other, published standard or code or, Schedule of Rates or any other printed publication referred to elsewhere in the contract. The contractor shall comply with the provisions of the contract and with the care and diligence execute and maintain the works and provide all labour and materials, tools and plants including for measurements and supervision of all works, structural plans and other things of temporary or permanent nature required for such execution and maintenance in so far as the necessity for providing these, is specified or is reasonably inferred from the contract. The Contractor shall take full responsibility for adequacy, suitability and safety of all the works and methods of construction. CLAUSE 12 :
AutoNDA by SimpleDocs
Dismantled cleaned, inspected and machined when necessary to achieve the proper dimensions and finishes per acceptable industry standards.

Related to Dismantled

  • Rubbish Please note that the blue top bin is for recycling and all other rubbish should be placed in black bin liners in the other bin for collection. Bins should be put out on Sunday evenings for an early Monday morning collection. Any bin that has not been put out will be the responsibility of the Guest to dispose of the rubbish. The Council will not collect any loose rubbish that is not inside a black bin liner. See above note re dog mess and nappies.

  • DEBRIS Contractor shall be responsible for the prompt removal of all debris which is a result of this contractual service.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.

  • Garbage The Concessionaire will contract directly with the service provider for adequate dumpster capacity and wildlife resistance. The Department must pre- approve the location of dumpsters and frequency of pick-ups. The Concessionaire will provide recycle bins for use by Park visitors.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • Evacuation (1) If the Combatant Commander orders a mandatory evacuation of some or all personnel, the Government will provide assistance, to the extent available, to United States and third country national contractor personnel.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.