Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase • All Basic Services set forth in the Agreement. Construction Phase • All Basic Services set forth in the Agreement. Post-Construction • All Basic Services set forth in the Agreement.
Design-Builder The person or entity responsible for the proper completion of the activities described in the Contract Documents and who executes the Contract.
Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE
Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.
Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE
Design At no cost to SCE, Seller shall be responsible for:
Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.
Design Standards Most recent edition of the “Owner’s Design Standards,” including any partial updates as may be directed by the Owner.
Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager:
Design Review Consumer shall provide Holy Cross an electrical one-line diagram and a relaying and metering one-line diagram prior to completion of detailed designs, unless the Consumer is installing a packaged system that is pre-certified to IEEE 1547.1 and UL 1741 standards. Packaged systems pre-certified under IEEE Standard 1547.1 and UL Standard 1741 will not require a relaying and metering one-line diagram. The submitted application and diagrams will be processed, reviewed, and acted upon in accordance with the Holy Cross Interconnection Policy.