Preparatory Work Notice definition

Preparatory Work Notice means the Thames Tideway Tunnel Preparatory Work Notice made by the Secretary of State on 4th June 2014 pursuant to regulation 5(3) of the SIP Regulations (as varied from time to time in accordance with regulation 5(7) of the SIP Regulations);
Preparatory Work Notice means the notice issued by the Secretary of State pursuant to Regulation 5(3) of the SIP Regulations dated 4 June 2014 (as varied from time to time in accordance with Regulation 5(7)) permitting or requiring Thames Water to undertake such preparatory work in relation to the Project as set out in that notice;

Examples of Preparatory Work Notice in a sentence

  • Police Executive Research Forum, 2011 Electronic Control Weapons Guidelines (see note 17).

  • For the purposes of the Thames Tideway Tunnel Price Control, Ofwat has included£408 million (Allowed Amount) to enable the Appointee to procure the Infrastructure Provider and to carry out certain enabling and interface works necessary for delivery of the Thames Tideway Tunnel Project, as required by the SIP Regulations, the Project Specification Notice and the Preparatory Work Notice.

  • The works for TWUL to undertake in the Thames Tideway Tunnel Project Preparatory Work Notice also have a very similar risk profile to the types of works which TWUL already undertakes e.g. in relation to land acquisition and supporting of its sewerage infrastructure.

  • As the Secretary of State [has exercised] the power under regulation 4(1) to specify by notice the Thames Tideway Tunnel Project as an infrastructure project, then without this corresponding Preparatory Work Notice TWUL, as the incumbent undertaker, is prohibited from undertaking any works in relation to the specified project.

  • The Company conducted an extensive study on Block 3 –Taoudenni Basin – located in the northern part of Mali.

  • Accordingly, for the above reasons and having regard to all other relevant considerations, the Secretary of State has decided to exercise the power in regulation 5(3) of the SIP Regulations and [has issued] the Thames Tideway Tunnel Project Preparatory Work Notice.

Related to Preparatory Work Notice

  • Development Work means the conduct of preclinical and clinical trials, the compilation of the regulatory dossier concerning Licensed Products and the conduct of other work necessary or useful for obtaining Regulatory Approval of Licensed Products.

  • Project Deliverables means the Project deliverables set out in Schedule 2. Project Material means all the material including but not limited to documents, computer software, and data stored by any means which is created by the Fellow in the course of undertaking the Project.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Construction materials means any tangible personal property that will be

  • Development Application means the development application identified in Item 5 of Schedule 1 and includes all plans, reports models, photomontages, material boards (as amended supplemented) submitted to the consent authority before the determination of that Development Application.

  • Manufacturing Process means any process for—

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • TENDER SPECIFICATIONS means the Scope of Work, Special Instructions / Conditions, Technical specifications/requirement , Appendices, Site Information and drawings pertaining to the work and any other relevant reference in the Tender Document for which the Bidder are required to submit their offer.

  • Program Materials means the documents and information provided by the Program Administrator specifying the qualifying EEMs, technology requirements, costs and other Program requirements, which include, without limitation, program guidelines and requirements, application forms and approval letters.

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Urgent Work means any urgent measures which in the opinion of Engineer-in-charge become necessary during the progress of the work to obviate any risk of accident or failure or disruption of generation which become necessary for security.

  • Manufacturing Facility means buildings and structures, including machinery and equipment, the primary purpose of which is or will be the manufacture of tangible goods or materials or the processing of such goods or materials by physical or chemical change.

  • Development Works means the external development works and internal development works on immovable property;

  • Deliverables means the work product and other output of the Services required to be delivered by Contractor as part of the Services, as specified in the relevant section of the Contract.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Manufacturing Facilities means facilities engaged in the mechanical or chemical transformation of materials or substances into new products and shall include:

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • technical specification means, with respect to any Software, the document setting forth the technical specifications for such Software and included in the Statement of Work.

  • Development Schedule shall have the meaning set forth in Section 1.1.

  • Timeline means the list of critical dates and actions included in the Introductory Materials.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • RFP Process or “Bidding Process” means the process governing the submission and evaluation of the Bids as set out in the RFP itself;

  • Service Specification means and include detailed description, statements to technical data, performance characteristics, and standards (Indian as well as) as applicable and as specified in the Contract as well as those specifications relating to Industry standards and codes applicable to the performance of the work, work performance quality and the specifications affecting the works or any additional specification required to be produced by the DCO to meet the design criteria.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Service Specifications means the following documents, as applicable to the Services under Your order: