Preparatory Work Sample Clauses

Preparatory Work. 9 8. Acceptance...............................................................11 9.
AutoNDA by SimpleDocs
Preparatory Work a) The Buyer shall have the sole responsibility, at its sole expense, for the work required to prepare the Site for installation of the Supplies. The building to house the Supplies and the systems contained therein shall comply with the specifications detailed in Appendix "Building Requirements" and Appendix "Building Completion Specifications". As soon as possible after completion, and, at the latest, on _________________, the Seller shall prepare for the Buyer a proposed layout and prepare such other plans and memoranda as are necessary to transmit data to the Buyer's architects and engineers. By _______________, the Buyer shall furnish to the Seller drawings and plans for the Site including the building and systems detailed in Appendix "Building Requirements" and Appendix "Building Completion Specifications" in sufficient detail to enable the Seller to judge whether the Site will be satisfactory for the Supplies and will meet the specifications detailed in Appendix "Building Requirements" and Appendix "Building Completion Specifications". Within four (4) weeks of the receipt of this initial set of architectural and engineering drawings and plans, the Seller shall provide the Buyer with comments thereon and detailed information as to such modifications therein as the Seller deems necessary including such drawings and technical documents as may be required by the Buyer to complete the installation of the cables, cooling water and compressed air systems. However, the time devoted to preparation by personnel of Seller of additional layouts or drawings and/or reviews of revised sets of architectural and engineering drawings will be invoiced at Seller's regular rates. No additional charge will be made for telephone consultations. Travel and related expenses incurred as a result of attendance by personnel of the Seller required at meeting outside of Belgium with the Buyer's architects, engineers, consultants and/or representatives will be reimbursed by the Buyer. With respect to the foregoing, the responsibility for determining whether conflict exists between local building codes and/or other laws or government regulations and the content of drawings, data sheets, memoranda or other forms of communication submitted by the Seller is solely the responsibility of the Buyer, his architects, engineers and/or consultants. The definitive drawings and plans for the Site, made in accordance with the Seller's comments and recommendations, will then be furnished by the B...
Preparatory Work. The Contractor is obliged to perform preparatory work on the arrangement of the construction site, necessary to ensure the safety of construction, as well as perform work in accordance with SNiP 12-03-2001 and 12-04-2002 "Occupation health in construction".
Preparatory Work. Contractor pursuant to this Agreement shall undertake all geotechnical work at and a topographical survey of, the Site, including any required utility locating notifications. Contractor shall undertake all necessary site preparation. All such preparatory work contained in this Section 2.8(d) shall be performed in accordance with the requirements of this Agreement.
Preparatory Work. For work for firing up and other preparations for daily operations that commence at 0400 hours or later on weekdays and continues into the ordinary working day, employees shall be paid a supplement of 50 % until the ordinary working day commences.
Preparatory Work. Prior to the commencement of the Services at the job site, Supplier shall fully inspect the job site, in particular foundations, ground and subsurface conditions, connections, possible impediments, etc. and shall promptly notify Solar in writing of any objection. Supplier shall not be entitled to assert claims on the grounds of unknown job site conditions following commencement of the Contract.
Preparatory Work. 3.3.1 Contractor must receive verbal and/or written agreement from JEA Contract Administrator prior to commencement of construction activities.
AutoNDA by SimpleDocs
Preparatory Work. (a) Lessor shall perform in a diligent, workmanlike manner at its sole cost and expense the renovation of the Premises in accordance with the specifications set forth in Exhibit B attached hereto.
Preparatory Work. 4.5.1 Before starting a portion of the Work, the Contractor and the responsible Subcontractor shall carefully examine all preparatory work that has been executed to receive his work. The Subcontractor shall check carefully, by whatever means are required, to ensure that his work and adjacent related work will finish to proper contours, planes and levels. He shall promptly notify the Contractor and the Design Consultant of any defects or imperfections in preparatory work, which will, in any way, affect satisfactory completion of his work. Absence of such notification will be construed as an acceptance of preparatory work and later Claims of defects therein will not be recognized.
Preparatory Work. Prior to the commencement of the Services at the job site, Supplier shall fully inspect the job site, in particular foundations, ground and subsurface conditions, connections, possible impediments, etc. and shall promptly notify Turbomach in writing of any objection. Supplier shall not be entitled to assert claims on the grounds of unknown job site conditions following commencement of the Contract.
Time is Money Join Law Insider Premium to draft better contracts faster.