Forced Project Outage definition

Forced Project Outage means any reduction or cessation of energy generation by the Project involving the shutdown of, and physical unavailability of generation from, Project facilities caused by any condition at the Project (as opposed to a Curtailment resulting from conditions on the Transmission System), but excluding Project Maintenance and Force Majeure.

Examples of Forced Project Outage in a sentence

  • As soon as practicable after commencement of a Forced Project Outage, Seller shall provide TVA with notice and expected duration (if known) of any Forced Project Outage.

  • Each such notice shall set forth, if known by Seller, a detailed explanation for the cause of the Forced Project Outage, identification of the equipment impacted, the expected duration of the Forced Project Outage, and Seller’s proposed course of action to remedy such Forced Project Outage.

  • Each such notice shall set forth, to the extent of Seller’s knowledge and judgment, a detailed explanation for the cause of the Forced Project Outage, identification of the equipment impacted, the expected duration of the Forced Project Outage, and Seller’s proposed course of action to remedy such event and prevent similar future events.

  • A critical component of the accreditation process is an on-site visit to the institution by a team of individuals with expertise appropriate to the program being reviewed.

Related to Forced Project Outage

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Maintenance Outage means NERC Event Type MO, as set forth in attached Exhibit B, and includes any outage involving ten percent (10%) of the Facility’s Net Output that is not a Forced Outage or a Planned Outage.

  • Scheduled Outage has the meaning given to it in the Grid Code;

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Subproject means a specific activity financed, or proposed to be financed through a FOSAP Grant under Part B.1 of the Project.

  • Subprojects means more than one such Subproject.

  • Total Project Cost means all the funds to complete the effort proposed by the Applicant, including DOE funds (including direct funding of any FFRDC) plus all other funds that will be committed by the Applicant as Cost Sharing.

  • Total Project Costs means the total amount of money required to complete the Project.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.

  • State Contract Project means any erection or construction of, or any addition to, alteration of or other improvement to any building or structure, including, but not limited to, roads or highways, or the installation of any heating or cooling or ventilating plants or other equipment, or the supply of and materials for such projects, pursuant to a contract with the State of West Virginia for which bids were solicited on or after June 6, 2001.

  • Project area budget means a multiyear projection of annual or cumulative

  • Outage has the meaning set forth in the CAISO Tariff.