Water Supply Station Sample Clauses

Water Supply Station. The Contractor shall plan, design and construct a fresh water storage facility of approx. 300 m² and pressure increase plant in accordance with the Employer’s Requirements and the requirements of local Water supply Company. The dimensions shall be in accordance with the Contractor’s design subject to the approval by the relevant Authority and by the Engineer. The water supply station shall include a Control Room (if necessary) and for servicing the water treatment system, the filtered water system, pumps for all water storage and distribution requirements, filtration and chlorination injection equipment (if necessary) and all other associated equipment. A chlorine storage room shall be provided with sufficient space for consumable to cover a two year period. The building shall have a reinforced concrete frame supported on concrete foundations supported on piles. The roof shall be reinforced concrete with the specified waterproofing system. Wall shall be rendered blockwork or reinforced concrete. Metal gratings and covers and associated support steelwork and fixings at water supply station shall be stainless steelwork. Chemically resistant pipes and neutralization sumps shall be provided in the drainage system. Suitable doors to provide access for maintenance and safe operational requirements and rain- proof ventilation openings shall be provided and fitted. Personnel doors shall also be provided as necessary. Provision for lifting and removing equipment shall be by hoist.
AutoNDA by SimpleDocs

Related to Water Supply Station

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Network Resource Interconnection Service (check if selected)

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

Time is Money Join Law Insider Premium to draft better contracts faster.