TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION Sample Clauses

TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. The ENGINEER shall evaluate and update the Traffic Control Plans (TCP) for the project to include traffic control measures for complete street reconstruction versus widening with a mill and overlay. The detailed TCP shall be developed in accordance with the latest edition of the Texas Manual on Uniform Traffic Control Devices. The ENGINEER is to implement the current Barricade and Construction (BC) standards and utilize Austin District standards.
AutoNDA by SimpleDocs
TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. The Engineer shall prepare Traffic Control Plans (TCP) for the project. The Engineer shall complete Form 2229-Significant Project Procedures along with Page 4 of Form 1002, specifically titled Accelerated Construction Procedures. A detailed TCP must be developed in accordance with the latest edition of the TMUTCD. The Engineer shall implement the current Barricade and Construction (BC) standards and TCP standards as applicable. The Engineer shall:
TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. The ENGINEER will provide a Traffic Control Plan (TCP) for the needed construction repairs along the project limits. TCP’s are required for all projects; therefore a detailed TCP shall be developed when traffic handling during construction involves complications for which a feasible solution is not covered by the Texas MUTCD or the current Barricade and Construction (BC) standards. The following items are required on all TCP Layouts:
TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. Prepare the Traffic Control plan and incorporate this work in to the PS&E plan set. The Engineer shall prepare Traffic Control Plans (TCP) including TCP typical sections and cross sections for the different phases, for the project. A detailed TCP must be developed in accordance with the latest edition of the TMUTCD. The Engineer shall implement the current Barricade and Construction (BC) standards and TCP standards as applicable. The Engineer shall interface and coordinate phases of work, including the TCP, with adjacent Engineers. The Engineer shall: DocuSign Envelope ID: 798F7E2C-0AE6-40EE-BFB4-3AB848988972
TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. The Engineer shall update the Traffic Control Plans (TCP) including TCP typical sections and cross sections for the different phases, for the project. The Engineer shall review and update Form 2229- Significant Project Procedures along with Page 4 of Form 1002, specifically titled Accelerated Construction Procedures. A detailed TCP must be developed in accordance with the latest edition of the TMUTCD. The Engineer shall implement the current Barricade and Construction (BC) standards and TCP standards as applicable. The Engineer shall interface and coordinate phases of work, including the TCP, with adjacent Engineers. The Engineer shall:

Related to TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION

  • Definitions Rules of Construction In addition to terms otherwise defined herein, the following terms are used herein as defined below:

  • Defined Terms Construction 1.01 Defined Terms 1.02 Construction ARTICLE II LOAN 2.01 Loan Terms 2.02 Prepayment Premium 2.03 Exculpation 2.04 Application of Payments 2.05 Usury Savings 2.06 Floating Rate Mortgage - Third Party Cap Agreement ARTICLE III LOAN SECURITY AND GUARANTY 3.01 Security Instrument

  • Definitions and Rules of Construction 1.1 Unless otherwise defined herein, the following capitalized terms shall have the following meanings:

  • Definitions and Construction 1 1.1 Definitions.....................................................................................1 1.2

  • Definitions and Principles of Construction Section 1.1 Defined Terms 1 Section 1.2 Principles of Constructions 1

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Definitions Certain Rules of Construction As used herein, the following terms will have the following meanings:

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Definitions Principles of Construction Section 1.1 Definitions 1 Section 1.2 Principles of Construction 13 ARTICLE II

  • Interpretation and Rules of Construction In this Agreement, except to the extent otherwise provided or that the context otherwise requires: