Test Strips Sample Clauses

Test Strips. Prior to production of CCPR-Foamed Asphalt Stabilized Base, the Contractor shall construct production test strips. The Contractor shall construct the test strip using construction procedures intended for the entire Project. The Contractor shall place foamed asphalt stabilized base for one (1) 1,500-foot long test strip, one-lane wide, at the designated Plan thickness and designed optimum foamed asphalt and mineral filler content (if required). The Contractor shall construct the test strip on the Project at a location approved by the Project Manager. For multiple lift CCPR-Foamed Asphalt Stabilized Base construction, test strip shall be the bottom lift. The Contractor shall repeat the test strip process until an Acceptable test strip is produced. Unacceptable test strips will not be paid for, and may be removed at the sole discretion of the Project Manager. Accepted test strips will remain in place and will be Accepted and measured as a part of the completed CCPR-Foamed Asphalt Stabilized Base Material. Tests used for the test strip will not be included in the evaluation for payment. When a test strip is Accepted, full production may begin. The Contractor shall use the following for the initial start-up procedures and/or when a change in construction procedures occurs or when resuming production after a termination of production due to unsatisfactory CCPR- Foamed Asphalt Stabilized Base Material quality.
AutoNDA by SimpleDocs
Test Strips. The Engineer may stop asphalt application and require construction of test strips at the Contractor’s expense if any of the following occurs:  nonuniformity of application continues after corrective action;  on 3 consecutive shots, application rate differs by more than 0.03 gal. per square yard from the rate directed; or  any shot differs by more than 0.05 gal. per square yard from the rate directed. The Engineer will approve the test strip location. The Engineer may require additional test strips until surface treatment application meets specification requirements.

Related to Test Strips

  • Test Samples The Contractor is responsible for providing Samples of sufficient size for test purposes and for coordinating such tests with the Work Progress Schedule to avoid delay.

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Local Switching Interfaces 4.2.13.1 Newcomm shall order ports and associated interfaces compatible with the services it wishes to provide as listed in Exhibit A. BellSouth shall provide the following local switching interfaces:

  • Horizontal Movement The Board encourages all unit members to improve their skills through advanced training and, as an inducement thereto, provides extra compensation for those who do so successfully. The Board delegates to the Superintendent the responsibility for assuring that unit members comply with the following regulations when claiming credit for advanced studies.

  • Lots 5.1. The 1 (one) standard lot size is the measurement unit specified for each CFD. The Company may offer standard lots, micro-lots and mini-lots, in its discretion, as defined from time to time in the Contract Specifications or the Company’s Website.

  • PRODUCT SUBSTITUTION In the event a specified manufacturer’s Product listed in the Contract becomes unavailable or cannot be supplied by the Contractor for any reason (except as provided for in the Savings/Force Majeure Clause) a Product deemed in writing by the Commissioner to be equal to or better than the specified Product must be substituted by the Contractor at no additional cost or expense to the Authorized User. Unless otherwise specified, any substitution of Product prior to the Commissioner’s written approval may be cause for cancellation of Contract.

  • Porcupine Site Highway 11

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.