Steel H-Piles. Steel Tonnage (ST) = (UW) (Q) / 2000 where: UW= Unit Weight of the Steel Beam* (pounds per foot) Q = Quantity (linear feet) of steel piles paid on current estimates processed during the applicable 3-month period. * The unit weight of steel will be the second of the two numbers associated with the size designation for the beam as cited in the item description (i.e. If the item description is "Steel Beam Bearing Piles, HP12x74", the unit weight of the steel is 74 pounds per foot).
AutoNDA by SimpleDocs
Steel H-Piles. It is expected that steel would be driven to/into the underlying sandstone/mudstone bedrock to develop the required capacity. Steel piles should be driven using a hammer with a rated energy of at least 350 J/cm2 of net steel cross sectional area. Previous experience has shown that an actual delivered energy in the order of 200 J/cm2 is required to attain the allowable contact stress given below. Refusal may be taken as 10 blows for the last 25 mm of pile penetration. Actual penetration depths of steel piles into the sandstone/mudstone bedrock will depend on the driving energy delivered and the bedrock condition/strength at the pile locations. Previous experience has shown that penetration depths can vary significantly from site to site or within the same site, depending on the rock quality and strength, and can range from less than 1 m to 2 m or more. The vertical capacity of steel piles driven to refusal, as defined above, may be determined using an allowable contact stress of 50 MPa for steel H and open end pipe piles (based on net steel area). An allowable bearing pressure of 7 MPa may be used for the design of closed end pipe piles (based on xxxxx xxx xxxx). Re-tapping of some piles (e.g., 25 percent) within a 48-hour period is recommended to assess relaxation effects, and the requirement to re-tap additional piles. The settlement of piles installed as outlined above and proportioned for the expected loads would be negligible. For the analysis of lateral resistance, an effective pile width of two times the pile diameter may be used.

Related to Steel H-Piles

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Millwright Xxxxx be to assist and work under the direction and instructions I or A. He will work alone at times performing assignments in keeping with his training. During the course of his year, training must become proficient in good practices in the areas of fitting, aligning, lubricating and the operation of all shop tools and machines. In addition to the foregoing, he will be exposed to and the process of learning techniques required in trouble shooting key production machinery, pipe fitting, basic welding and machining but not be expected to display a high degree of proficiency in these areas at this point. Millwright Must be capable of performing the tasks of fittings, aligning, lubricating an able to operate all shop tools and machines. Must under direction become proficient in basic welding and pipe fitting as well as dismantling and reassembly of plant equipment. Under direction,will continueto develop skills in trouble shooting all plant equipment and improve his skills at machining part and be exposed to basic principles of hydraulics and pneumatic. He may work alone frequently, but occasionally will require direction and instructions form Millwright I or A. Millwright 11: be capable, without direction of fitting, aligning and lubrication and taking apart and reassembling plant equipment. In addition, is expected to be able to weld, operate shop tools and do pipe fitting as required. Must under direction, become proficient at effective methods of trouble shooting and repairing hydraulic, pneumatic and mechanical faults in plant machinery. I: Must be capable without direction of performing all practices under Xxxxxxxxxx Must under directionbecomeproficient at reading and understanding blueprints, all phases of installing new equipment, laying out hydraulic and mechanical drives and meet speed and power requirements correctly. Xxxxxxxxxx "A": Must he capable without direction, of performing all under Xxxxxxxxxx X, and Must take full responsibility for work done by himself or his assistant. Must he in possession of a Millwright Certificate or a Machinist Certificate or Welder Certificate. Millwrightspresently employed in this classification will not be required to have a Certificate.

  • Alcoholic Beverages Costs of alcoholic beverages are unallowable.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • meminta nasihat daripada Pihak Xxxxxx dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik Xxxxx xxxxxx rasmi di Pejabat Tanah xxx/atau xxxx-xxxx Pihak-pihak Berkuasa yang berkenaan xxx (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja xxx juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya (“Pembeli”) dikehendaki dengan segera memohon xxx mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju xxx/atau Pihak Tuanpunya xxx/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa xxx memastikan samada jualan ini dikenakan cukai. BUTIR-BUTIR HARTANAH : HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan oleh pihak berkuasa. NO. HAKMILIK INDUK / NO. LOT : Geran 203771, Lot 106 Seksyen 3 PEKAN/DAERAH/NEGERI : Pekan Batu Tiga / Petaling / Selangor Darul Ehsan PEGANGAN : Selama-lamanya KELUASAN LANTAI : 93.65 meter persegi (1,008 kaki persegi) PEMAJU : Shanghai Realty (M) Sdn Bhd (350799-U) XXXXXXXX XXX : Xxxxxxxx Xxxxx Bin Xxxxxx BEBANAN : Diserahhak kepada RHB Islamic Bank Berhad (200501003283/680329-V) LOKASI XXX PERIHAL HARTANAH Hartanah tersebut terletak di Pangsapuri Indahria, Xx. 0, Xxxxx Xxxx Xxxx-Xxxxxx Xxxxx, Xxxxx Xxxxxxx, Xxxxxxx 00, 00000 Xxxx Xxxx, Xxxxxxxx Xxxxx Xxxxx. Hartanah tersebut adalah sebuah unit pangsapuri dikenali sebagai Xxxxx Pemaju No. P5-2-11, Tingkat No. 2, Bangunan No. P5, berserta dengan Xxxxx Aksesori No. GRD-07, Pangsapuri Indahria xxx mempunyai alamat surat-menyurat di Unit No. P5-02-11, Pangsapuri Indahria, Xx. 0, Xxxxx Xxxx Xxxx-Xxxxxx Xxxxx, Xxxxx Xxxxxxx, Xxxxxxx 00, 00000 Xxxx Xxxx, Xxxxxxxx Xxxxx Xxxxx. HARGA RIZAB: Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 270,000.00 (RINGGIT MALAYSIA: DUA RATUS XXX TUJUH PULUH RIBU SAHAJA) xxx tertakluk kepada syarat-syarat Jualan xxx melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat xxx perjanjian yang dikenakan xxx mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi xxx mematuhi syarat- syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada xxx semua xxx xxx perbelanjaan ditanggung xxx dibayar oleh Xxxxx Xxxxxxx.Pembeli atas talian (online) juga tertakluk kepada terma-terma xxx syarat-syarat terkandung dalam xxx.xxxxxxxxxxxxxxxx.xxx Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Islamic Bank Berhad sebelum lelongan awam xxx xxxx xxxx xxxxxx bersama-sama dengan segala cukai jualan xxx perkhidmatan (SST) xxx/atau cukai yang menggantikan SST hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Islamic Bank Berhad melalui XXXXXX. Butir-butir pembayaran melalui XXXXXX, xxxx berhubung dengan Tetuan T. Rajagopalu & Co. Untuk maklumat lanjut, xxxx berhubung dengan TETUAN T. RAJAGOPALU & CO, Solicitors for Assignee herein whose address is at Xxxxx 0-0, Xxxxxxxx Xxxx Xxxxxx Xxxxx Xxxxx, 00000 Xxxxxxxx Xxxxxx Xxxxxxxx. Tel: 00-0000000 / Fax: 00-0000000 [Ruj: RG/RHB/0339/2023/SYAFIQAH(yusof)], peguamcara bagi pihak pemegang xxxxx xxx atau pelelong yang tersebut dibawah. RAJAN AUCTIONEERS SDN. BHD. X. XXXXX Xx.00X,Xxxxxxx Xxxx,Xxxxx Xxxx Xxxxxx, ( Xxxxxxxx Berlesen ) 41000 Klang, Selangor Darul Ehsan. H/P: 000-0000000 Tel: 00-00000000 / Fax : 00-00000000 H/P: 012-2738109 Ruj Kami: RA/RHBI/TRC/NS/4220-24(fz) CONDITIONS OF SALE

  • Cloud storage DSHS Confidential Information requires protections equal to or greater than those specified elsewhere within this exhibit. Cloud storage of Data is problematic as neither DSHS nor the Contractor has control of the environment in which the Data is stored. For this reason:

  • Summer Session A. All ASEs employed in the Summer Session shall receive the same general range adjustment as ASEs received in the preceding Fall term.

  • Emergency Childcare Employees may use vacation leave for childcare emergencies after the employee has exhausted all of their accrued compensatory time. Use of vacation leave and sick leave for emergency childcare is limited to a combined maximum of four (4) days per calendar year.

  • Pacific Gas and Electric Company “PG&E”), San Diego Gas & Electric Company (“SDG&E”), and Southern California Edison Company (“Edison”) (each a Participating TO) are entering into this agreement transferring Operational Control of their transmission facilities in reliance upon California Public Utilities Code Sections 367, 368, 375, 376, and 379 enacted as part of AB 1890 which contain assurances and schedules with respect to recovery of transition costs.

Time is Money Join Law Insider Premium to draft better contracts faster.