ROUGH PUMP OUTLET Sample Clauses

ROUGH PUMP OUTLET. For the outlet of the rough pumps you either need an oil mist filter, or you have to lead it to the outside or into your exhaust air system. Tubing: 9mm inner diameter, 12 mm outer diameter, 5m delivered with the instrument.
AutoNDA by SimpleDocs
ROUGH PUMP OUTLET. For the outlet of the rough pumps you either need an oil mist filter or you have to lead it to the outside or into your exhaust air system. Tubing: 9 mm inner O, 12 mm outer O, 5000 mm delivered with the instrument kit. Exhaust venting could be required for user safety. Health hazards include chemical toxicity of solvents, samples and buffers used, as well as pump fluid vapor and potential biohazards of aerosolized samples. Most of the solvent and sample are aerosolized and must be vented externally to the building and not recirculated by the environmental control system. The exhaust system should be at or slightly below atmospheric pressure (subpressure). If a subpressure is not available, the length of the tubing from rough pump to the vent should not exceed 5000 mm. Connection to ventilation system shall be direct to exterior building or to clean fume hod to prevent possible bay flow of contaminants. A existing exhaust (environmental) system must be designed and controlled as directed in conformance with all local laws (codes, ordinances and regulations). SAFETY PRECAUTIONS /X/ The standard Nitrogen laser emits high intensity radiation at 337 nm, 250-mu-J (Class IIIb laser classification). The laser radiation is invisible to the eye but still can cause damage to it. To safeguard the user the REFLEX-TM- is equipped with interlocks, which prevent operation of the laser when the instrument laser cover is open. During normal operation mode with all covers closed (i.e. Class I laser classification) no laser radiation can be transmitted outside the spectrometer. BRUKER does not recommend bypassing or disabling any of the safety features by anyone other than trained BRUKER service engineers or running the system without covers--BRUKER will not take over any responsibility in such cases. The spectrometer operation involves use of high voltages. The access of high voltage cables and high voltage feedthroughs is restricted behind the side walls of the instrument as far as possible. Accessible high voltage connections are marked with danger signs according to regulations. BRUKER will not take over any responsibility for any injury incurred as result of a misappropriate use of the instrument.

Related to ROUGH PUMP OUTLET

  • HORIZONR Gateway HORIZONR Gateway provides customers with the ability to (i) generate reports using information maintained on the Multicurrency HORIZONR Accounting System which may be viewed or printed at the customer’s location; (ii) extract and download data from the Multicurrency HORIZONR Accounting System; and (iii) access previous day and historical data. The following information which may be accessed for these purposes: 1) holdings; 2) holdings pricing; 3) transactions, 4) open trades; 5) income; 6) general ledger and 7) cash.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Fuel Upon redelivery of the Aircraft to Lessor, an adjustment will be made in respect of fuel on board on the Previous Delivery Date and the Expiry Date at the price then prevailing at the Redelivery Location.

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Electrical Service Subject to the limitation of this Paragraph 4, furnish electrical service to the Premises, including providing and installing all Building standard replacement lighting tubes. If Tenant uses more electrical power than Landlord in good faith considers reasonable or normal for office use, Tenant will pay Landlord on a monthly basis the cost of such excess power consumed by Tenant. Consumption will be determined, at Landlord’s election, either (a) by a survey performed by a reputable consultant selected by Landlord, or (b) through separate meters or submeters installed, maintained and read by Landlord at Tenant’s cost. For purposes of this Paragraph 4 only, “month” and “monthly” shall mean any billing period used by the utility or other power provider supplying electricity. All installations of electrical futures, appliances and equipment within the Premises shall be subject to Landlord’s prior approval, and if they affect the temperature or humidity otherwise maintained, Landlord may, at Tenant’s sole cost and expense (to be paid within (30) days after delivery of written demand supported by invoices or other reasonably satisfactory evidence), install supplemental air conditioning units. Tenant’s use of electricity shall never exceed Tenant’s share of the capacity of existing feeders to the Building or of the risers, wiring installations and transformers serving the floor(s) containing the Premises. Landlord shall provide up to 3.5 xxxxx per usable square foot (demand) of riser and floor panel electrical capacity averaged over the floor being serviced. EXHIBIT C Tenant shall be allocated an approximate 2.0 xxxxx per usable square foot for power and 1.5 xxxxx per usable square foot for lighting. Any risers or wiring necessary to meet Tenant’s excess electrical requirements will be installed by Landlord on Tenant’s request, at Tenant’s sole cost and expense (to be paid in advance), but only if in Landlord’s reasonable good faith belief they are necessary and will not cause damage to the Building or a dangerous condition, entail excessive or unreasonable alterations, repairs or expense, or disturb other occupants.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

Time is Money Join Law Insider Premium to draft better contracts faster.