Ranking Landslide Initiation Areas for Material Delivery to Fish Sample Clauses

Ranking Landslide Initiation Areas for Material Delivery to Fish. Bearing Streams A new method was developed for characterizing source areas for debris flows in terms of the amount of material7 carried to fish-bearing streams based on an estimate of relative debris-flow volume used in the Xxxxxx-Xxxxxxx (2008) model for debris-flow runout. In the model, the downstream extent of debris-flow runout is associated with the point where the volume of material scoured equals the volume deposited. The volume scoured is assumed proportional to the integral of the probability of scour along the runout path. Scour probability is a function of channel gradient and confinement measured from the DEM, calibrated to field-measured zones of scour along debris-flow tracks (Xxxxxx and Xxxxxxx, 2008; Xxxxxxx et al., 1999). This estimate of scoured volume assumes that the volume available for scour is uniform along scour zones (the same assumption used by Xxxx et al., 2016). The volume deposited is assumed proportional to the volume scoured and the integral of depositional probability along the runout track. Larger-volume debris flows are assumed to deposit a larger volume per unit length, in accordance with empirical observation (Xxxxxxxx and Xxxxxxx, 2002). Depositional probability is also a function of gradient and channel confinement measured from the DEM and calibrated to field-surveyed zones of deposition along debris-flow tracks. This model then provides a measure of debris-flow volume (volume scoured minus volume deposited) at each point along a potential debris-flow track. It is a relative measure, proportional to the average volume available for scour per unit length along the track. The volume of the 7 This volume of material includes everything scoured along the runout track, both sediment and wood. May (2002) found that both sediment volume and wood volume in surveyed deposits increased with increasing runout length. However, the relative proportion of sediment to wood will depend on the relative rates at which each accumulates along the runout track, which may vary with location. initiating landslide is not accounted for explicitly8. However, the scour zone for volume accumulation along the runout track extends through the initiation zone, so the initiating volume per unit landslide-scar length is assumed the same as the scour volume per unit length of the channel downslope. Based on measurements of sediment thickness and deposit geometries of hollows and debris flow-prone channels, the stored sediment volume per unit length wa...
AutoNDA by SimpleDocs

Related to Ranking Landslide Initiation Areas for Material Delivery to Fish

  • Drawings Submitted During the Contract Term Where required to develop maintain and deliver diagrams or other technical schematics regarding the scope of work, Contractor shall do so on an ongoing basis at no additional charge, and must, as a condition of payment, update drawings and plans during the Contract term to reflect additions, alterations, and deletions. Such drawings and diagrams shall be delivered to the Authorized User’s representative.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.

  • Limitations on Reverse Engineering, Decompilation, and Disassembly You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

  • Response/Compliance with Audit or Inspection Findings A. Grantee must act to ensure its and its Subcontractors’ compliance with all corrections necessary to address any finding of noncompliance with any law, regulation, audit requirement, or generally accepted accounting principle, or any other deficiency identified in any audit, review, or inspection of the Contract and the services and Deliverables provided. Any such correction will be at Grantee’s or its Subcontractor's sole expense. Whether Xxxxxxx's action corrects the noncompliance shall be solely the decision of the System Agency.

  • Doctor's Certificate of Inability to Work The Employer may require an employee who is unable to work because of illness or injury to provide a statement from:

  • Transmission Delivery Service Implications Network Resource Interconnection Service allows Interconnection Customer's Large Generating Facility to be designated by any Network Customer under the Tariff on Transmission Provider's Transmission System as a Network Resource, up to the Large Generating Facility's full output, on the same basis as existing Network Resources interconnected to Transmission Provider's Transmission System, and to be studied as a Network Resource on the assumption that such a designation will occur. Although Network Resource Interconnection Service does not convey a reservation of transmission service, any Network Customer under the Tariff can utilize its network service under the Tariff to obtain delivery of energy from the interconnected Interconnection Customer's Large Generating Facility in the same manner as it accesses Network Resources. A Large Generating Facility receiving Network Resource Interconnection Service may also be used to provide Ancillary Services after technical studies and/or periodic analyses are performed with respect to the Large Generating Facility's ability to provide any applicable Ancillary Services, provided that such studies and analyses have been or would be required in connection with the provision of such Ancillary Services by any existing Network Resource. However, if an Interconnection Customer's Large Generating Facility has not been designated as a Network Resource by any load, it cannot be required to provide Ancillary Services except to the extent such requirements extend to all generating facilities that are similarly situated. The provision of Network Integration Transmission Service or firm Point-to-Point Transmission Service may require additional studies and the construction of additional upgrades. Because such studies and upgrades would be associated with a request for delivery service under the Tariff, cost responsibility for the studies and upgrades would be in accordance with FERC's policy for pricing transmission delivery services. Network Resource Interconnection Service does not necessarily provide Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on Transmission Provider's Transmission System without incurring congestion costs. In the event of transmission constraints on Transmission Provider's Transmission System, Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in Transmission Provider's Transmission System in the same manner as Network Resources. There is no requirement either at the time of study or interconnection, or at any point in the future, that Interconnection Customer's Large Generating Facility be designated as a Network Resource by a Network Service Customer under the Tariff or that Interconnection Customer identify a specific buyer (or sink). To the extent a Network Customer does designate the Large Generating Facility as a Network Resource, it must do so pursuant to Transmission Provider's Tariff. Once an Interconnection Customer satisfies the requirements for obtaining Network Resource Interconnection Service, any future transmission service request for delivery from the Large Generating Facility within Transmission Provider's Transmission System of any amount of capacity and/or energy, up to the amount initially studied, will not require that any additional studies be performed or that any further upgrades associated with such Large Generating Facility be undertaken, regardless of whether or not such Large Generating Facility is ever designated by a Network Customer as a Network Resource and regardless of changes in ownership of the Large Generating Facility. However, the reduction or elimination of congestion or redispatch costs may require additional studies and the construction of additional upgrades. To the extent Interconnection Customer enters into an arrangement for long term transmission service for deliveries from the Large Generating Facility outside Transmission Provider's Transmission System, such request may require additional studies and upgrades in order for Transmission Provider to grant such request.

  • Failure to Meet Timelines Failure by the Union to comply with the timelines will result in the automatic withdrawal of the grievance. Failure by the Employer to comply with the timelines will entitle the Union to move the grievance to the next step of the procedure.

  • Delivery to Members and Inspection Any Member or its designated representative shall have reasonable access during normal business hours to the information and documents kept by the Company pursuant to Section 7.1. The rights granted to a Member pursuant to this Section 7.2 are expressly subject to compliance by such Member with the safety, security and confidentiality procedures and guidelines of the Company, as such procedures and guidelines may be established from time to time. Upon the request of any Member for purposes reasonably related to the interest of that Person as a Member, the Directors shall promptly deliver to the requesting Member, at the expense of the requesting Member, a copy of the information required to be maintained under Section 7.1. Each Member has the right, upon reasonable request for purposes reasonably related to the interest of the Person as a Member and for proper purposes, to: (i) inspect and copy during normal business hours any of the Company records described in Section 7.1; and (ii) obtain from the Directors, promptly after their becoming available, a copy of the Company’s federal, state, and local income tax or information returns for each Fiscal Year. Each Assignee shall have the right to information regarding the Company only to the extent required by the Act.

Time is Money Join Law Insider Premium to draft better contracts faster.