Protective Relays, Synchronizing and Metering Sample Clauses

Protective Relays, Synchronizing and Metering. This section covers the furnishing and installation of protective relays, synchronizing and metering for the plant electrical systems and equipment. Protective relays for the switchyard will be furnished and installed by others. The Contractor shall coordinate with -------------------------------------------------------------------------------- EPC - Exhibit B -------------------- TENASKA GEORGIA GENERATION PROJECT Page 111 of 132 -------------------------------------------------------------------------------- the switchyard Contractor to ensure that protective relays for the total plant are coordinated. Protective relays shall be provided for optimum protection of the gas turbine generator, step-up transformers, station auxiliaries, and personnel in the event of electrical faults or abnormal system conditions. Protective relays for the gas turbine generators shall be provided as described in Exhibit H. The protection system shall be designed such that the protective device nearest the fault operates first, with backup protection being provided by subsequent relay stages. Selectivity shall apply to phase-to-phase and three phase, as well as to ground faults. The generator zone protection or turbine trip shall shut down the GTG and isolate them from the electric power system. Transformer differential, overcurrent protection and sudden pressure relays shall be applied to the main and auxiliary transformers. The generator and overall system protection relay devices supplied for the project shall consist of the minimum level of protection as follows: Description Function ----------- -------- Overexcitation Volts per Hertz 24 Sync Check 25 Bus Undervoltage 27B Undervoltage 27 Reverse Power or Anti-Motoring 32 Loss of Excitation 40 Negative Sequence Current 46 Transformer Neutral Overcurrent 51N Generator Ground Fault 59GN Voltage Balance 60 Bus Ground Fault 59B Generator Differential 87G Transformer Differential 87T Generator Lockout 86G Transformer Lockout 86T DC Field Ground 64 Phase Fault 51V Over/Under Frequency 81 O/U Auxiliary Power Running Trip 94AR Auxiliary Power Transformer Overcurrent 50/51 Out of Step 78 -------------------------------------------------------------------------------- EPC - Exhibit B -------------------- TENASKA GEORGIA GENERATION PROJECT Page 112 of 132 -------------------------------------------------------------------------------- Protective relays shall be electrical-mechanical or solid state type electric utility grade in indivi...
AutoNDA by SimpleDocs

Related to Protective Relays, Synchronizing and Metering

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Network Services Local Access Services In lieu of any other rates and discounts, Customer will pay fixed monthly recurring local loop charges ranging from $1,200 to $2,000 for TDM-based DS-3 Network Services Local Access Services at 2 CLLI codes mutually agreed upon by Customer and Company.

  • Synchronization The Licensor hereby grants limited synchronization rights for One (1) music video streamed online (Youtube, Vimeo, etc..) for up to 500,000 non-monetized video streams on all total sites. A separate synchronisation license will need to be purchased for distribution of video to Television, Film or Video game.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Availability of Verizon Telecommunications Services 3.1 Verizon will provide a Verizon Telecommunications Service to Reconex for resale pursuant to this Attachment where and to the same extent, but only where and to the same extent, that such Verizon Telecommunications Service is provided to Verizon’s Customers.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Network Access TENANT may find it necessary to purchase a network interface card, wireless PC card or other hardware in order to connect to the internet service. LANDLORD is not responsible for the purchase of these items and LANDLORD cannot guarantee compatibility with any device TENANT may have. The computer and network card must have software installed that supports the Internet Protocol commonly referred to as TCP/IP. Any conflicts between the software compatibility of the network and the TENANT’S computer operating system or any other feature will be the responsibility of the TENANT to resolve. LANDLORD will not be responsible for software issues related to the user’s personal computer.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.