Isotopical aproches Sample Clauses

Isotopical aproches. Processes controlling the chemical composition of natural waters are of major interest for geochemists because they are the main pathways for the transport of elements and particles from the earth surface and subsurface to the oceans. Chemical and mechanical alteration of the continental crust leads to the disaggregation of rocks and minerals, the formation of soil systems and also allows the removal of chemical elements as well as of larger and smaller particles from altered rocks and soils by rain, pore, spring and river water. Several geochemical and isotopic studies focused especially on suspended particulate and dissolved river loads in order to provide information about their origin and to examine elemental fractionation between colloidal and solution phases. Strontium-isotope ratios vary in nature because one of the strontium isotopes (87Sr) is formed by the radioactive decay of the naturally occurring element rubidium (87Rb). The 87Sr/86Sr ratios are mainly used as tracers of water–rock interaction (Blum et al., 1994; Xxxxxx et al., 2001). The primary sources of Sr in natural water are atmospheric input, dissolution of Sr-bearing minerals, and anthropogenic input (Négrel and Petelet-Giraud, 2005). Dissolved 87Sr/86Sr ratios have often been used to trace weathering patterns, water flow paths, erosion sources, and biological processes in groundwater, watershed/lake, riverine, and oceanic systems (Xxxxxx and Xxxxxx, 1989, 1992; Xxxxxx et al., 1993; Xxxx et al., 1996; Xxxxxx and Xxxxxxx, 1998; Xxxxxxx et al., 1998; Xxxxx and Xxxx, 2006). The 87Sr/86Sr ratio in sediments and suspended matter has also been used to identify sediment provenance in freshwater, estuarine, and marine systems (Xxxxx, 1986; Xxxxxxx et al., 1995; Xxxxxxx et al., 1997; Xxxxxx et al., 2000; Xxxxxxxxx Xxx, 2002; Xxxxx and Xxxxxx-Xxxxxx, 2002; Xxxxxxx et al., 2003; Xxxxxxx et al., 2004). Little attention, however, has been paid to the reasons for the distinct and often large differences in the strontium isotopic composition (and geochemistry, Xxxxxxx, 1993) between the particulate (> l µm), colloidal (< 1 µm), and dissolved (<0.003 µm) phases. These differences are potentially important to an understanding of the origin and geochemistry of the various suspended particulate and dissolved fraction entering the ocean. Weathering is the most important factor determining the Nd concentration and isotopic composition in river water. Starting with the studies by Balashov et al. (1964) a nu...
AutoNDA by SimpleDocs

Related to Isotopical aproches

  • Biological Samples If so specified in the Protocol, Institution and Principal Investigator may collect and provide to Sponsor or its designee Biological Samples (“Biological Samples”). 12.2.

  • Rhytidectomy Scar revision, regardless of symptoms. • Sclerotherapy for spider veins. • Skin tag removal. • Subcutaneous injection of filling material. • Suction assisted Lipectomy. • Tattooing or tattoo removal except tattooing of the nipple/areola related to a mastectomy. • Treatment of vitiligo. • Standby services of an assistant surgeon or anesthesiologist. • Orthodontic services related to orthognathic surgery. • Cosmetic procedures when performed primarily: o to refine or reshape body structures or dental structures that are not functionally impaired; o to improve appearance or self-esteem; or o for other psychological, psychiatric or emotional reasons. • Drugs, biological products, hospital charges, pathology, radiology fees and charges for surgeons, assistant surgeons, attending physicians and any other incidental services, which are related to cosmetic surgery.

  • Product ACCEPTANCE Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User(s) shall have thirty (30) days from the date of delivery to accept hardware products and sixty (60) days from the date of delivery to accept all other Product. Where the Contractor is responsible for installation, acceptance shall be from completion of installation. Failure to provide notice of acceptance or rejection or a deficiency statement to the Contractor by the end of the period provided for under this clause constitutes acceptance by the Authorized User(s) as of the expiration of that period. The License Term shall be extended by the time periods allowed for trial use, testing and acceptance unless the Commissioner or Authorized User agrees to accept the Product at completion of trial use. Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User shall have the option to run testing on the Product prior to acceptance, such tests and data sets to be specified by User. Where using its own data or tests, Authorized User must have the tests or representative set of data available upon delivery. This demonstration will take the form of a documented installation test, capable of observation by the Authorized User, and shall be made part of the Contractor’s standard documentation. The test data shall remain accessible to the Authorized User after completion of the test. In the event that the documented installation test cannot be completed successfully within the specified acceptance period, and the Contractor or Product is responsible for the delay, Authorized User shall have the option to cancel the order in whole or in part, or to extend the testing period for an additional thirty (30) day increment. Authorized User shall notify Contractor of acceptance upon successful completion of the documented installation test. Such cancellation shall not give rise to any cause of action against the Authorized User for damages, loss of profits, expenses, or other remuneration of any kind. If the Authorized User elects to provide a deficiency statement specifying how the Product fails to meet the specifications within the testing period, Contractor shall have thirty (30) days to correct the deficiency, and the Authorized User shall have an additional sixty (60) days to evaluate the Product as provided herein. If the Product does not meet the specifications at the end of the extended testing period, Authorized User, upon prior written notice to Contractor, may then reject the Product and return all defective Product to Contractor, and Contractor shall refund any monies paid by the Authorized User to Contractor therefor. Costs and liabilities associated with a failure of the Product to perform in accordance with the functionality tests or product specifications during the acceptance period shall be borne fully by Contractor to the extent that said costs or liabilities shall not have been caused by negligent or willful acts or omissions of the Authorized User’s agents or employees. Said costs shall be limited to the amounts set forth in the Limitation of Liability Clause for any liability for costs incurred at the direction or recommendation of Contractor.

  • API If the Software offers integration capabilities via an API, your use of the API may be subject to additional costs or Sage specific policies and terms and conditions (which shall prevail in relation to your use of the API). You may not access or use the API in any way that could cause damage to us or the Software, or in contravention of any applicable laws. We reserve the right in our sole discretion, to: (i) update any API from time to time; (ii) place limitations around your use of any API; and (iii) deny you access to any API in the event of misuse by you or to otherwise protect our legitimate interests.

  • Commercialization Intrexon shall have the right to develop and Commercialize the Reverted Products itself or with one or more Third Parties, and shall have the right, without obligation to Fibrocell, to take any such actions in connection with such activities as Intrexon (or its designee), at its discretion, deems appropriate.

  • Influenza Vaccine Upon recommendation of the Medical Officer of Health, all employees shall be required, on an annual basis to be vaccinated and or to take antiviral medication for influenza. If the costs of such medication are not covered by some other sources, the Employer will pay the cost for such medication. If the employee fails to take the required medication, she may be placed on an unpaid leave of absence during any influenza outbreak in the home until such time as the employee has been cleared by the public health or the Employer to return to the work environment. The only exception to this would be employees for whom taking the medication will result in the employee being physically ill to the extent that she cannot attend work. Upon written direction from the employee’s physician of such medical condition in consultation with the Employer’s physician, (if requested), the employee will be permitted to access their sick bank, if any, during any outbreak period. If there is a dispute between the physicians, the employee will be placed on unpaid leave. If the employee gets sick as a reaction to the drug and applies for WSIB the Employer will not oppose the application. If an employee is pregnant and her physician believes the pregnancy could be in jeopardy as a result of the influenza inoculation and/or the antiviral medication she shall be eligible for sick leave in circumstances where she is not allowed to attend at work as a result of an outbreak. This clause shall be interpreted in a manner consistent with the Ontario Human Rights Code.

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Manufacturing (a) The Supplier shall without limitation be responsible, at no additional cost to the Purchaser, for: sourcing and procuring all raw materials for the Products; obtaining all necessary approvals, permits and licenses for the manufacturing of the Products; providing sufficient qualified staff and workers to perform the obligations under this Purchase Agreement; implementing and maintaining effective inventory and production control procedures with respect to the Products; and handling other matters as reasonably requested by the Purchaser from time to time.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Prosthetics Crowns and Bridges (Plan B) paying for 60% of the approved Schedule of Fees.

Time is Money Join Law Insider Premium to draft better contracts faster.