General Submittals Sample Clauses

General Submittals. All proposals for additive or deductive changes or modifications to the Subcontract must include the following:
AutoNDA by SimpleDocs
General Submittals. Submit fabrication or installation documents as well as shop drawings designating products and materials to be used in construction to the Owner for review and approval. Owner shall have at least five (5) working days unless otherwise agreed to by the parties to review submittals and return comments to the Developer.
General Submittals. 1 Submittals: in accordance with Section 01 33 00 - Submittal Procedures. .2 Prepare instructions and data using personnel experienced in maintenance and operation of described products. .3 Draft copy will be returned with Departmental Representative's comments. .4 Revise content of documents as required prior to final submittal. .5 Two weeks prior to Total Performance of the Work, submit to the Departmental Representative four final copies of operating and maintenance manuals in English. .6 Ensure spare parts, maintenance materials and special tools provided are new, undamaged and of same quality and manufacture as products provided in Work. .7 Furnish evidence, if requested, for type, source and quality of products provided. .8 Defective products will be rejected, regardless of previous inspections. Replace products at own expense. .9 Pay costs of transportation.

Related to General Submittals

  • Submittals Submittals required by the Contract Documents shall be prepared specifically for the Work by the Contractor to illustrate some portion of the Work. Submittals are not Contract Documents.

  • Review of Submittals A/E and ODR review is only for conformance with the design concept and the information provided in the Contract Documents. Responses to submittals will be in writing. The approval of a separate item does not indicate approval of an assembly in which the item functions. The approval of a submittal does not relieve the Contractor of responsibility for any deviation from the requirements of the Contract unless the Contractor informs the A/E and ODR of such deviation in a clear, conspicuous, and written manner on the submittal transmittal and at the time of submission, and obtains the A/E’s and Owner’s written specific approval of the particular deviation.

  • Contractor’s Submittals The Contract shall submit with reasonable promptness consistent with the Work Project Schedule and in orderly sequence all Shop Drawings, Samples, or other information required by the Contract Documents, or subsequently required by Change Order. Prior to submitting, the Contractor shall review each submittal for compliance with the Contract Documents and certify its approval by an approval stamp affixed to each copy. Submittal data presented without the Contractor’s certification will be returned without review or comment, and any delay resulting from such certification is the Contractor's responsibility.

  • Required Submittals Complete shop drawings and manufacturer’s catalog data shall be submitted to the State and approved by the State prior to start of any construction work. Power and lighting panel configuration shall be complete with schedule of branch panels, separate disconnects, and circuit breakers, based on calculated and estimated motor, resistive and lighting loads. All circuits shall be labeled at the panel and at the outlet/power pole for future reference. Location of all electrical receptacles and telephone outlets (including power drops for the systems furnishings) shall be designated on a block floor plan showing the systems furnishings layout provided by the State. Said block floor plan shall be furnished by the State to the Owner/Lessor no later than 4 weeks after approved construction plans are received by the State.

  • Applications for Payment 9.3.1 At least ten days before the date for each progress payment established in the State- Contractor Agreement, the Contractor shall submit to the Architect an itemized Application for Payment, notarized if required, supported by such data substantiating the Contractor's right to payment as the State or the Architect may require. The application for payment must, at a minimum, reflect retainage and the required waivers of lien and any other support documentation enumerated elsewhere in the Contract Documents.

  • CONTRACTOR’S SUBMISSION OF CONTRACT MODIFICATIONS In connection with any Contract modification, OGS reserves the right to:  request additional information  reject Contract modifications  remove Products from Contract modification requests  request additional discounts for new or existing Products

  • ELECTRONIC SUBMITTALS 3.1. Submittal Exchange® (xxx.xxxxxxxxxxxxxxxxx.xxx) shall be used to provide an on-line database and repository, which shall be used to transmit and track project-related documents. The intent for using this service is to expedite the construction process by reducing paperwork, improving information flow, and decreasing submittal review turnaround time.

  • Contract Changes Changes may not be made in the terms and conditions of this contract without the agreement and written permission of the Director of Housing.

  • Disbursements for Site Improvements All payments made by the OPWC for site improvements or other work shall be made directly to the Contractor that performed the work and originated the invoice, unless the request is for disbursement to the Recipient.

  • SITE VISITS AND RECORD REVIEW The Applicant shall allow authorized employees of the District, the Comptroller, the Appraisal District, and the State Auditor’s Office to have reasonable access to the Applicant’s Qualified Property and business records from the Application Review Start Date through the Final Termination Date, in order to inspect the project to determine compliance with the terms hereof or as necessary to properly appraise the Taxable Value of the Applicant’s Qualified Property.

Time is Money Join Law Insider Premium to draft better contracts faster.