Finish Carpentry Sample Clauses

Finish Carpentry. Finish carpentry shall conform to American Woodwork Institute criteria.
AutoNDA by SimpleDocs
Finish Carpentry. A. Provide wood trims, casing and miscellaneous items where shown and required.
Finish Carpentry. An allowance has been made for the finish carpentry and millwork in the entry area and for the installation of shelving and rods in the closets. 08000 DOORS AND WINDOWS (Per scope indicated in the contract drawings)
Finish Carpentry i. Custom plastic laminate base/wall cabinets w/ adjustable shelves in Work rooms and Mail room. See item 4Li for some of these cabinets included within the allowances. ii. Custom plastic laminate worksurface within base cabinets in Work rooms, Exercise, restrooms, and Mailroom.
Finish Carpentry. 1. Architectural details for the Base Building lobby and lobby ceiling comparable to MetroTech Center buildings.
Finish Carpentry a. Steamed beach veneer window sxxxx with solid beach edge band, clear finish.
Finish Carpentry. Restroom vanity counter top and back splash in a choice of standard plastic laminate finishes. Division 7 - Thermal and Moisture Protection -------------------------------------------- 7.58 Insulation . Pursuant to Exhibit E-1 7.51 Roof Membrane . Pursuant to the specification manual listed Exhibit E-1. (Specification manual takes precedence over drawing notes for this line item) Division 8 - Doors/Frames/Hardware and Glazing ----------------------------------------------
AutoNDA by SimpleDocs

Related to Finish Carpentry

  • FABRICATION Making up data or results and recording or reporting them.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Shiftwork 38.1 Shift Penalties (Excluding Home Care Classifications)

  • Design At no cost to SCE, Seller shall be responsible for:

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR Other services: 130 thousand SDR List of Entities which procure the services, specified in Annex 4:

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

Time is Money Join Law Insider Premium to draft better contracts faster.