API Consumption Factor Sample Clauses

API Consumption Factor. After Pfizer has completed its initial validation runs and during the initial stages of Pfizer’s commercial manufacture of the Product, the Parties shall consult with a view to develop a strategy for maximizing the yield of the API supplied by Xxxxxxx. Based upon such consultations, the Parties shall establish a maximum API consumption factor target for the Product to be manufactured in accordance with Xxxxxxx’x Purchase Orders. When Pfizer has achieved manufacturing of consistent batch quantities [*] of the Product in accordance with the maximum consumption factor target, the Parties shall set out in writing binding terms and conditions for manufacturing criteria, such as an API yield minimum, permitted variances of API usage and consequences of out-of-variance performance. Once the maximum consumption factor has been established, if, during any Commercial Year period, Pfizer’s consumption of API exceeds the maximum agreed upon consumption factor Pfizer shall reimburse Xxxxxxx for any excess consumption at Xxxxxxx’x cost/kg, subject to the limitation of Section 5.4(d).
AutoNDA by SimpleDocs
API Consumption Factor. Company shall use commercially reasonable efforts to maximize the API Yield for each commercial Batch of Drug Product. A maximum API consumption target, or Drug Product per API ratio, shall be [*] using the commercial Manufacturing process or as may be agreed to by the Steering Committee. Within [*] following the end of each Commercial Year, Company shall prepare an annual reconciliation of Drug Product Batches to calculate the annual Drug Product yield. For any API consumption above the API consumption target [*].

Related to API Consumption Factor

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Contract Quantity The Contract Quantity during each Contract Year is the amount set forth in the applicable Contract Year in Section D of the Cover Sheet (“Delivery Term Contract Quantity Schedule”), which amount is inclusive of outages.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Supply Price In event BTC exercises the Supply Option, the Supply Agreement shall afford Auxilium supply terms for Year 1 that are not less favorable than the average price afforded to Auxilium by the Back-Up Suppliers for the year immediately preceding the Supply Date and supply terms for each successive year that are not less favorable than the average price afforded to Auxilium by the Back-Up Suppliers for each preceding year as applicable.

  • Night Shift Differential 1. An employee who works an assigned night shift shall, in addition to his or her regular salary, be paid a night shift differential for each hour actually worked on the assigned night shift.

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

Time is Money Join Law Insider Premium to draft better contracts faster.