Surface water withdrawal permit definition

Surface water withdrawal permit means a document issued by the Board evidencing the right to withdraw surface water.
Surface water withdrawal permit means a document issued by the Board evidencing the right to
Surface water withdrawal permit means a document issued by the Board evidencing the right to 1008 withdraw surface water. 1009 "Surface water management area" means a geographically defined surface water area in which the 101010111012 Board has deemed the levels or supply of surface water to be potentially adverse to public welfare, health and safety."Surface water" means any water in the Commonwealth, except ground water, as defined in 1013 § 62.1-255. 1014 § 62.1-248.2. Permit rationale. 1015 In granting a permit pursuant to this chapter, the Department shall provide in writing a clear and 1016 concise statement of the legal basis, scientific rationale, and justification for the decision reached. When 1017 the decision of the Department is to deny a permit pursuant to this chapter, the Department shall, in 1018 consultation with legal counsel, provide a clear and concise statement explaining the reason for the 1019 denial, the scientific justification for the same, and how the Department's decision is in compliance with 1020 applicable laws and regulations. Copies of the decision, certified by the Director, shall be mailed by 1021 certified mail to the permittee or applicant. 1022 § 62.1-255. Definitions. 1023 As used in this chapter, unless the context requires otherwise: 1024 "Agricultural irrigation" means irrigation that is used to support any operation devoted to the bona 1025 fide production of crops, animals, or fowl, including the production of fruits and vegetables of any kind; 1026 meat, dairy, and poultry products; nuts, tobacco, nursery, and floral products; and the production and 1027 harvest of products from silvicultural activity. 1028 "Beneficial use" includes domestic (including public water supply), agricultural, commercial, and 1029 industrial uses. 1030 "Board" means the State Water Control Board. However, when used outside the context of the 103110321033 promulgation of regulations, including regulations to establish general permits, pursuant to this chapter, "Board" means the Department of Environmental Quality."Department" means the Department of Environmental Quality. 1034 "Eastern Shore Groundwater Management Area" means the ground water management area declared 1035 by the Board encompassing the Counties of Accomack and Northampton. 1036 "Ground water" means any water, except capillary moisture, beneath the land surface in the zone of 1037 saturation or beneath the bed of any stream, lake, reservoir or other body of surface water wholly or 103810391040 partial...

Examples of Surface water withdrawal permit in a sentence

  • EPD included a “special condition” in the draft permit requiring SNC to artificially oxygenate the Savannah River Estuary, which is 100 miles downriver from VEGP (see Surface water withdrawal permit # 017-0191-11, page 2, Special Condition #3).

Related to Surface water withdrawal permit

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Building Permit means a permit for the construction of one or more Units, issued by the City, or other public agency in the event the City no longer issues said permits for the construction of Units within CFD No. 11. For purposes of this definition, "Building Permits" shall not include permits for construction or installation of commercial/industrial structures, parking structures, retaining walls, and utility improvements not intended for human habitation.

  • impermeable surface means a surface or pavement constructed and maintained to a standard sufficient to prevent the transmission of liquids beyond the pavement surface, and should be read in conjunction with the term “sealed drainage system” (below).

  • Impervious surface means a surface that has been covered with a layer of material so that it is highly resistant to infiltration by water.

  • Title V operating permit means a permit issued under Chapter 3745-77 of the Administrative Code.

  • Underground tank means a device meeting the definition of tank whose entire surface area is totally below the surface of and covered by the ground.

  • Underground mining means all methods of mining other than surface mining.

  • Single event permit means a permit issued in accordance with Chapter 9, Part 3, Single Event Permit.

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Surface water means all water which is open to the atmosphere and subject to surface runoff.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Surface waters means all waters of the state as defined in G.S. 143-212 except underground waters

  • Environmental Approval means any consent, authorisation, licence or approval of any governmental or public body or authorities or courts applicable to any Relevant Ship or its operation or the carriage of cargo and/or passengers thereon and/or the provision of goods and/or services on or from such Relevant Ship required under any Environmental Law;

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Environmental Approvals means any present or future permit, licence, approval, ruling, variance, exemption or other authorisation required under the applicable Environmental Laws.

  • Site area emergency means events may occur, are in progress, or have occurred that could lead to a significant release of radioactive material and that could require a response by off-site response organizations to protect persons off-site.

  • Environmental Compliance Reserve means any reserve which the Agent establishes in its reasonable discretion after prior written notice to the Borrower from time to time for amounts that are reasonably likely to be expended by the Borrower in order for the Borrower and its operations and property (a) to comply with any notice from a Governmental Authority asserting material non-compliance with Environmental Laws, or (b) to correct any such material non-compliance identified in a report delivered to the Agent and the Lenders pursuant to Section 7.7.

  • Pervious surface means an area that releases as runoff a small portion of the precipitation that falls on it. Lawns, gardens, parks, forests or other similar vegetated areas are examples of surfaces that typically are pervious.

  • Constructed wetlands means areas intentionally designed and created to emulate the water quality improvement function of wetlands for the primary purpose of removing pollutants from stormwater.

  • Regulatory Permits means all Permits granted by the FDA or any comparable Governmental Entity to the Company or any of its Subsidiaries, including investigational new drug applications, Biologics License Applications, manufacturing approvals and authorizations, clinical trial authorizations and ethical reviews, or their national or foreign equivalents.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Permeable pavement means paving material that absorbs water or allows water to infiltrate through the paving material. "Permeable pavement" materials include porous concrete, permeable interlocking concrete pavers, concrete grid pavers, porous asphalt, and any other material with similar characteristics.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Floodplain Development Permit means any type of permit that is required in conformance with the provisions of this ordinance, prior to the commencement of any development activity.

  • Underground source of drinking water means an aquifer or its portion: